Connecting structure
By designing a connecting structure including a clamping member, the first plate body and the connecting component, the problem of inconvenience in installation between the mesh ball and the ceiling conversion layer is solved, and the convenience of replacement and maintenance and stable connection are achieved, and the work efficiency and installation balance and safety are improved.
Patent Information
- Application Number
- CN202420446819.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-08
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2034-03-08
AI Technical Summary
The installation method of the existing mesh ball and ceiling conversion layer is not convenient for the replacement and maintenance of dome surface materials and internal dome equipment, and the processing cycle is long, which reduces working efficiency.
A connecting structure is designed, including a clamping member, a first plate body and a connecting assembly. The clamping member is detachably connected to the first plate body. The first plate body and the ceiling conversion layer are connected by the connecting assembly, and a stable connection is achieved by using a wire rope and a fastener.
This connection structure is easy to replace and repair, improves work efficiency, ensures a stable connection between the mesh ball and the ceiling conversion layer, and improves installation balance and safety.
Smart Images

Figure CN222745422U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building decoration, and in particular to a connection structure. Background Art
[0002] Large indoor spaces in public buildings usually require suspended ceiling designs. The roof usually uses a steel grid structure to achieve large-span column-free indoor space, and the spacing between the lower chord node balls is generally more than 3 meters. The indoor ceiling cannot be directly suspended on the main steel grid. Usually, a suspended ceiling steel frame and a suspended ceiling transition layer are set to achieve the transition between the steel roof truss and the suspended ceiling. Since the lower chord node ball belongs to the main structure and has a large internal force, the suspended ceiling transition layer cannot be directly welded to the node ball to prevent welding stress or welding instability under high stress. Therefore, a clamp connection method is generally used, or a square steel pipe is directly connected with bolts.
[0003] However, in this current connection method, the grid ball node clamp connector needs to be processed and customized according to the grid ball node diameter, which takes a long processing cycle and reduces work efficiency. In addition, since the height of the ceiling conversion layer is generally high, the workload at high altitude is large, it is difficult for workers to work on their backs, and the installation method is not convenient for the replacement and maintenance of the dome surface materials and the internal equipment of the dome. Therefore, there is room for improvement and development in response to the above problems. Utility Model Content
[0004] The device provides a connection structure to at least solve the problem that the existing installation method of the grid ball and the ceiling conversion layer is not convenient for replacing and repairing the dome surface material and the dome internal equipment.
[0005] On the one hand, the present application provides a connection structure, connecting a grid ball and a ceiling conversion layer, including a hoop member, which is arranged on the grid ball;
[0006] The first plate body is detachably connected to the hoop member and sleeved on the middle part of the grid ball;
[0007] A connecting component connects the first plate body to the ceiling conversion layer.
[0008] Furthermore, the clamping member includes a first steel wire rope and a second steel wire rope which are cross-arranged on the grid ball, and the first steel wire rope and the second steel wire rope are both detachably connected to the first plate body.
[0009] Furthermore, the first steel wire rope and the second steel wire rope are suspended on the surface of the indoor dome through a third steel wire rope, and a plurality of the third steel wire ropes are provided, and the plurality of the third steel wire ropes are distributed at intervals along the direction of the first steel wire rope and / or the second steel wire rope.
[0010] Furthermore, the intersection of the first steel wire rope and the second steel wire rope is locked by a steel wire rope lock.
[0011] Furthermore, the connection assembly includes a connection piece and a ceiling keel rooting beam, the connection piece is connected to the first plate body, and the ceiling keel rooting beam is arranged on the connection piece and connected to the ceiling conversion layer.
[0012] Furthermore, the connecting member includes a hanger and a second plate body arranged on the hanger, the two ends of the hanger are respectively connected to the first plate body and the second plate body by fasteners, the ceiling keel rooting beam is arranged on the second plate body, and the grid ball abuts against the surface of the second plate body.
[0013] Furthermore, the first steel wire rope and the second steel wire rope are both connected to the first plate body via fasteners.
[0014] Further, the fastener includes a screw portion and a locking nut sleeved on the screw portion and threadedly connected to the screw portion, the screw portion is respectively arranged on the first steel wire rope and the second steel wire rope, and the first steel wire rope and the second steel wire rope are connected to the first plate body through the screw portion and the corresponding locking nut;
[0015] The screw rod parts are arranged at two ends of the suspension rod, and the suspension rod is connected to the first plate body and the second plate body respectively through the screw rod parts and corresponding locking nuts.
[0016] Furthermore, the ceiling keel rooting beam is arranged at the center of gravity of the second plate body.
[0017] Furthermore, a plurality of suspension rods are arranged at intervals along the outer edge of the first plate body.
[0018] In summary, this application includes the following beneficial technical effects:
[0019] 1. According to the utility model, the hoop and the first plate are respectively arranged on the grid ball, and the hoop and the first plate are detachably connected, so that they are easy to replace and repair, thereby improving work efficiency;
[0020] 2. The utility model is provided with a connection assembly, which is respectively connected to the grid ball and the ceiling conversion layer, so as to realize the connection between the grid ball and the ceiling conversion layer. The ceiling keel root beam is arranged at the center of gravity of the second plate body, so that the center of gravity of the second plate body and the suspension rod faces downward, thereby improving the connection balance between the grid ball and the ceiling conversion layer;
[0021] 3. The utility model can improve the connection stability between the first steel wire rope, the second steel wire rope and the first plate body, and the suspension rod and the first plate body and the second plate body by arranging fasteners, thereby ensuring their safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a structural schematic diagram of the connection structure between the spherical grid and the ceiling conversion layer in one embodiment of the utility model;
[0023] Figure 2It is a partial structural schematic diagram of the connection structure between the spherical grid and the ceiling conversion layer in one embodiment of the utility model.
[0024] Description of reference numerals:
[0025] 1. Grid ball, 2. Clamp, 21. First steel wire rope, 22. Second steel wire rope, 23. Third steel wire rope, 3. Rod, 4. Wire rope lock, 5. First plate, 6. Hanging rod, 7. Fastener, 71. Locking nut, 72. Screw part, 8. Second plate, 9. Ceiling keel root beam, 10. Connecting assembly. DETAILED DESCRIPTION
[0026] The following describes the specific implementation of the utility model in conjunction with the accompanying drawings and embodiments:
[0027] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification so that people familiar with this technology can understand and read them, and are not used to limit the conditions under which the present invention can be implemented. Any structural modification, change in proportional relationship or adjustment of size should still fall within the scope of the technical contents disclosed in the present invention without affecting the effects and purposes that can be achieved by the present invention.
[0028] At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" cited in this specification are only for the convenience of description and are not used to limit the scope of the implementation of the present utility model. Changes or adjustments to their relative relationships should be regarded as the scope of the implementation of the present utility model without substantially changing the technical content.
[0029] The following is combined with Figure 1 This application is described in further detail.
[0030] Reference Figure 1 , Figure 2 This embodiment discloses a connection structure, connecting a grid ball 1 and a ceiling conversion layer, including a clamping member 2, which is arranged on the grid ball 1; a first plate body 5, which is detachably connected to the clamping member 2 and is sleeved on the middle position of the grid ball 1; and a connecting component 10, which connects the first plate body 5 to the ceiling conversion layer.
[0031] The ceiling conversion layer specifically refers to a floor of a building where the upper and lower parts have different structural types due to different plane usage functions, and the structure conversion is carried out through this floor. This floor is called a structural conversion layer. The ceiling conversion layer is usually used in spaces where the difference between the original ceiling surface and the ceiling surface is large. It is mainly used in large concert halls, performance halls, large indoor activity venues, etc.
[0032] In some embodiments, a through hole is provided on the first plate body 5, and the grid ball 1 is sleeved on and matched with the through hole, and the inner diameter of the through hole contacts the outer circumferential surface of the grid ball 1. The middle part of the grid ball 1 is located at the through hole position, and is divided into an upper part and a lower part by the first plate body 5. The upper part of the grid ball 1 is located between the hoop 2 and the first plate body 1, and the lower part of the grid ball is located between the first plate body 2 and the connecting assembly 10.
[0033] In some embodiments, the hoop member 2 forms a spherical net frame, the net frame ball 1 is sleeved in the spherical net frame, and the first plate body 5 is sleeved in the middle of the net frame ball 1 and connected to the hoop member 2, playing the role of supporting the net frame ball 1. In addition, the hoop member 2 and the first plate body 5 are detachably connected, and the hoop member 2 is easy to disassemble and install, which is convenient for maintaining the net frame ball 1.
[0034] In some embodiments, the hoop 2 includes a first steel wire rope 21 and a second steel wire rope cross-arranged on the grid ball 1, the first steel wire rope 21 and the second steel wire rope 22 are both connected to the first plate 5 through a fastener 7, and the first steel wire rope 21 and the second steel wire rope 22 are suspended on the surface of the indoor dome through a third steel wire rope 23. Rods 3 are arranged at both ends of the first steel wire rope 21 and the second steel wire rope 22, and the rods 3 are arranged between the first steel wire rope 21 and the fastener 7, and can connect the first steel wire rope 21 and the fastener 7; the rods 3 are arranged between the second steel wire rope 22 and the fastener 7, and can connect the second steel wire rope 22 and the fastener 7.
[0035] In some embodiments, a wire rope lock 4 is provided at the intersection of the first steel wire rope 21 and the second steel wire rope 22, and the wire rope lock 4 is used to lock the intersection of the first steel wire rope 21 and the second steel wire rope 22. The first steel wire rope 21 and the second steel wire rope 22 form a spherical net frame, and the mesh ball 1 is sleeved in the spherical net frame. The intersection of the first steel wire rope 21 and the second steel wire rope 22 is locked by the wire rope lock 4 to ensure that the intersection of the first steel wire rope 21 and the second steel wire rope 22 is concentrated at the center of the spherical net frame.
[0036] Optionally, a plurality of third steel wire ropes 23 are provided, and the plurality of third steel wire ropes 23 are spaced apart along the direction of the first steel wire rope 21 and / or the second steel wire rope 22. In this embodiment, the third steel wire rope 23 is provided on the first steel wire rope 21, and three third steel wire ropes 23 are provided, so as to suspend the grid ball 1 and ensure its suspension stability.
[0037] In some embodiments, the connection assembly 10 includes a connection piece and a ceiling keel rooting beam 9, wherein the connection piece is connected to the first plate body 5, and the ceiling keel rooting beam 9 is arranged on the connection piece and connected to the ceiling conversion layer. The connection assembly 10 is used to connect the first plate body 5 to the ceiling conversion layer through the ceiling keel rooting beam 9, and the ceiling keel rooting beam 9 is welded to the ceiling conversion layer to ensure the stability of its connection with the ceiling conversion layer.
[0038] In some embodiments, the connecting member includes a hanger rod 6 and a second plate body 8 connected to the hanger rod 6, the two ends of the hanger rod 6 are respectively connected to the first plate body 5 and the second plate body 8 by fasteners 7, the ceiling keel rooting beam 9 is arranged on the second plate body 8, and the grid ball 1 abuts against the surface of the second plate body 8. The ceiling keel rooting beam 9 is arranged at the bottom of the second plate body 8 and is connected by welding. Optionally, a plurality of hangers 6 are provided, and the plurality of hangers 6 are arranged circumferentially at intervals along the outer edge of the first plate body 5. In this embodiment, four hangers 6 are provided, and the four hangers 6 are arranged relative to the first plate body 5 and the second plate body 8, which can ensure the stability of the connection between the first plate body 5 and the second plate body 8.
[0039] In some embodiments, the ceiling keel root beam 9 is arranged at the center of gravity of the second plate body 8, the center of gravity of the second plate body 8 is located at the central axis of the second plate body, and the ceiling keel root beam 9 is arranged at the center of gravity of the second plate body 8, so that the second plate body 8 can be in a horizontal state, thereby playing a role in stabilizing the grid ball 1, effectively preventing the first steel wire rope 21, the second steel wire rope 22, and the third steel wire rope 23 from driving the first plate body 5 to tilt relative to the grid ball 1, thereby improving its connection stability. The first ceiling keel root beam 9 is connected to the ceiling conversion layer by welding, which can improve its connection stability.
[0040] In some embodiments, the fastener 7 includes a screw portion 72 and a locking nut 71 sleeved on the screw portion 72 and threadedly connected to the screw portion 72, the screw portion 72 is respectively arranged on the first steel wire rope 21 and the second steel wire rope 22 and threadedly connected to the first plate body 5, and the locking nut 71 is held against the first plate body 5. The screw portion 72 is arranged at both ends of the suspension rod 6 and threadedly connected to the first plate body 5 and the second plate body 8, respectively, and the locking nut 71 is respectively held against the first plate body 5 and the second plate body 8. The screw portion 72 is connected to the rod portion 3. When the first steel wire rope 21, the second steel wire rope 22 and the first plate body 5 need to be connected, the screw portion 72 is rotated clockwise and threadedly connected to the first plate body 5. After the connection is completed, the locking nut 71 is rotated so that the end face of the locking nut 71 is abutted against the surface of the first plate body 5, thereby making the connection between the first steel wire rope 21, the second steel wire rope 22 and the first plate body 5 more stable. The connection method between the suspension rod 6 and the second plate body 8 is the same as the connection method between the first steel wire rope 21, the second steel wire rope 22 and the first plate body 5.
[0041] The working principle of this embodiment is that the intersection of the first steel wire rope 21 and the second steel wire rope 22 is first locked by the steel wire rope lock 4, and the grid ball 1 is set in the spherical grid frame formed by the first plate body 5 and the first steel wire rope 21 and the second steel wire rope 22. The first plate body 5 is locked with the first steel wire rope 21 and the second steel wire rope 22 respectively by the fastener 7. By rotating the locking nut 71, the end face of the locking nut 71 is abutted against the surface of the first plate body 5, so that the connection between the first steel wire rope 21, the second steel wire rope 22 and the first plate body 5 is more stable. Then the two ends of the suspension rod 6 are respectively connected to the first plate body 5 and the second plate body 8 by the fastener 7. After the connection is completed, the ceiling keel root beam 9 is welded and connected to the ceiling conversion layer, so as to complete the connection between the grid ball 1 and the ceiling conversion layer. When it needs to be disassembled, it only needs to be disassembled by the fastener 7. The installation and disassembly are convenient, thereby improving the work efficiency of the maintenance of the grid ball 1.
[0042] Many other changes and modifications can be made without departing from the concept and scope of the utility model. It should be understood that the utility model is not limited to a specific embodiment, and the scope of the utility model is defined by the appended claims.
Claims
1. A connection structure connecting a grid ball (1) and a ceiling conversion layer, characterized in that: include A hoop member (2) is arranged on the mesh ball (1); A first plate body (5) is detachably connected to the hoop member (2) and is sleeved on the middle part of the grid ball (1); A connecting assembly (10) connects the first plate body (5) to the ceiling conversion layer.
2. The connection structure according to claim 1, characterized in that: The hoop member (2) comprises a first steel wire rope (21) and a second steel wire rope (22) which are cross-arranged on the grid ball (1); the first steel wire rope (21) and the second steel wire rope (22) are both detachably connected to the first plate body (5).
3. The connection structure according to claim 2, characterized in that: The first steel wire rope (21) and the second steel wire rope (22) are suspended on the surface of the indoor dome via a third steel wire rope (23), a plurality of the third steel wire ropes (23) are provided, and the plurality of the third steel wire ropes (23) are distributed at intervals along the direction of the first steel wire rope (21) and / or the second steel wire rope (22).
4. The connection structure according to claim 3, characterized in that: The intersection of the first steel wire rope (21) and the second steel wire rope (22) is locked by a steel wire rope lock (4).
5. The connection structure according to claim 2, characterized in that: The connection assembly (10) comprises a connection piece and a ceiling keel rooting beam (9), the connection piece is connected to the first plate body (5), and the ceiling keel rooting beam (9) is arranged on the connection piece and connected to the ceiling conversion layer.
6. The connection structure according to claim 5, characterized in that: The connecting member comprises a suspension rod (6) and a second plate body (8) connected to the suspension rod (6); the two ends of the suspension rod (6) are respectively connected to the first plate body (5) and the second plate body (8) via fasteners (7); the ceiling keel rooting beam (9) is arranged on the second plate body (8); and the grid ball (1) is in contact with the surface of the second plate body (8).
7. The connection structure according to claim 2, characterized in that: The first steel wire rope (21) and the second steel wire rope (22) are both connected to the first plate body (5) via a fastener (7).
8. The connection structure according to claim 6, characterized in that: The fastener (7) comprises a screw portion (72) and a locking nut (71) sleeved on the screw portion (72) and threadedly connected to the screw portion (72); ends of the first steel wire rope (21) and the second steel wire rope (22) are respectively connected to the screw portion (72); the first steel wire rope (21) and the second steel wire rope (22) are connected to the first plate body (5) via the screw portion (72) and the corresponding locking nut (71); The screw rod portions (72) are provided at both ends of the suspension rod (6), and the suspension rod (6) is respectively connected to the first plate body (5) and the second plate body (8) via the screw rod portions (72) and corresponding locking nuts (71).
9. The connection structure according to claim 6, characterized in that: The ceiling keel rooting beam (9) is arranged at the center of gravity of the second plate body (8).
10. The connection structure according to claim 6, characterized in that: A plurality of suspension rods (6) are arranged at intervals along the outer edge of the first plate body (5).