Tool support of coating worker construction platform
By designing a tool bracket for the coating construction platform, the problems of unfixed tool placement and untidy construction site are solved, and the tools are easily stored and operated safely are achieved, reducing rework and waste.
Patent Information
- Application Number
- CN202421577596.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2025-04-18
- Estimated Expiration
- 2034-07-05
AI Technical Summary
During the external coating and construction of rail passenger car bodies, the tools are not fixed, inconvenient to use, and the construction site is not tidy, making it easy to cause tool discarding, collision and other accidents, resulting in rework and waste of manpower and material resources.
Design a tool bracket for the coating construction platform, including the storage structure of putty scrapers and putty scrapers and the storage structure of new and old sandpapers. They are both open structures, suspended on the crossbar of the three-dimensional operating platform or the mobile lifting platform, to meet the height requirements of workers.
It effectively solves the problem of unfixed tool placement, reduces bent operations, reduces the risk of waist damage, improves the cleanliness and safety of the construction site, and reduces rework and waste.
Smart Images

Figure CN222768420U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of external painting construction of rail passenger car bodies, in particular to a tool support for a painting construction platform. Background Art
[0002] During the exterior painting process of modern rail passenger cars, the construction is completed on a three-dimensional operating platform or a mobile lifting platform. The operator will carry or use one or more painting tools during the operation, so the following problems may occur:
[0003] 1. The putty scraping process requires many tools, and the placement is not fixed, which is inconvenient to use;
[0004] 2. It is inconvenient to replace the old sandpaper with the new one, and you need to bend down frequently, which has caused accidents;
[0005] 3. Waste sandpaper is discarded at random, and the construction site is not tidy;
[0006] 4. The putty scraper and the pallet are placed randomly. The putty knife is sharp and will get caught on the operator and the grinder wires.
[0007] 5. Many problems often arise during construction, resulting in rework of products and unnecessary waste of manpower and material resources.
[0008] Therefore, based on the above technical problems, technicians in this field urgently need to develop a tool bracket for a painting construction platform. Utility Model Content
[0009] The utility model aims to provide a tool bracket for a painting construction platform. Two tool brackets are used to temporarily store putty scrapers, putty scrapers, new and old sandpapers and other tools, which are convenient to use. The height of the bracket is stipulated with reference to ergonomics, which avoids frequent bending during use and reduces waist injuries.
[0010] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0011] The utility model discloses a tool support for a coating construction platform, which is suspended on a crossbar of a three-dimensional operating platform or a mobile lifting platform. The tool support is divided into:
[0012] A putty scraping tool storage structure for temporarily storing putty scrapers and putty scrapers; and
[0013] A sandpaper storage structure for temporarily storing new and old sandpaper;
[0014] The putty scraping tool storage structure and the sandpaper storage structure are both configured as open structures, and corresponding tools are placed in corresponding storage structures.
[0015] Furthermore, the putty scraping tool storage structure includes:
[0016] bracket; and
[0017] A bracket hanging plate is arranged on the back of the bracket, the number of the bracket hanging plates is two, and the two bracket hanging plates are symmetrically arranged along the upper end of the back of the bracket;
[0018] The interior of the bracket is formed with a space for accommodating the putty scraper and the putty scraper plate.
[0019] Further, the bracket is configured as an isosceles triangle structure;
[0020] The bracket comprises:
[0021] An isosceles triangle back plate, with side baffles disposed on the sides of the back plate; and
[0022] Isosceles triangle front plate;
[0023] The front plate is connected to the front side of the back plate through the side baffles, and the size of the front plate is smaller than that of the back plate;
[0024] The space between the front plate and the back plate is a space for storing the putty scraper and the putty scraper, and the front side and the upper part of the space are open structures.
[0025] Furthermore, the bracket suspension plate is configured as an L-shaped structure, and the bracket suspension plate can be overlapped on the cross bar of the three-dimensional operating platform or the mobile lifting platform.
[0026] Furthermore, the sandpaper storage structure includes:
[0027] storage cylinder; and
[0028] A storage tube hanging plate is arranged on the back of the storage tube, and the number of the storage tube hanging plate is one;
[0029] The inner space of the storage cylinder is formed as a space for accommodating new and old sandpapers.
[0030] Furthermore, the upper portion and the front side of the storage tube are both open structures.
[0031] Furthermore, the storage tube hanging plate is configured as an L-shaped structure, and the storage tube hanging plate can be overlapped on the cross bar of the three-dimensional operating platform or the mobile lifting platform.
[0032] Further, the bracket is configured as an isosceles right triangle structure with a side length of 20 cm, and the thickness of the bracket is 5 cm;
[0033] The height of the front plate of the bracket is 1 / 2 of the height of the back plate.
[0034] Furthermore, the storage tube is a cylindrical structure with a diameter of 20 cm, and the opening width of the front side of the storage tube is 5 cm.
[0035] In the above technical solution, the utility model provides a coating construction platform tool bracket, which has the following beneficial effects:
[0036] The tool bracket of the utility model is divided into a putty scraper storage structure and a sandpaper storage structure, which can be hung on the crossbar of the three-dimensional operating platform through a hanging plate. The hanging height meets the operating height requirements of workers and provides temporary storage space for putty scrapers, putty scrapers, and new and old sandpapers, effectively solving the problem of having too many tools but nowhere to store them, and is convenient to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. It is obvious that the drawings described below are only some embodiments recorded in the present utility model. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0038] Figure 1 A schematic diagram of a structure for storing a putty scraping tool of a tool support on a painting platform disclosed in an embodiment of the utility model;
[0039] Figure 2 It is a structural schematic diagram of a sandpaper storage structure of a tool support of a painting construction platform disclosed in an embodiment of the utility model;
[0040] Figure 3 The present invention is a structural schematic diagram of a tool support for a painting construction platform in use state disclosed in an embodiment of the present utility model.
[0041] Description of reference numerals:
[0042] 10. Storage structure for putty scraping tools; 20. Storage structure for sandpaper; 30. Three-dimensional operating platform or mobile lifting platform;
[0043] 1. Bracket; 2. Bracket hanging plate; 3. Storage cylinder; 4. Storage cylinder hanging plate;
[0044] 101. Back panel; 102. Front panel; 103. Side baffles. DETAILED DESCRIPTION
[0045] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0046] See also Figures 1 to 3 As shown;
[0047] A tool support for a coating construction platform in this embodiment is suspended on a crossbar of a three-dimensional operating platform or a mobile lifting platform 30. The tool support is divided into:
[0048] A putty scraping tool storage structure 10 for temporarily storing putty scrapers and putty scrapers; and
[0049] A sandpaper storage structure 20 for temporarily storing new and old sandpaper;
[0050] The putty scraping tool storage structure 10 and the sandpaper storage structure 20 are both configured as open structures, and corresponding tools are placed in corresponding storage structures.
[0051] Specifically, the present embodiment discloses a tool holder capable of storing small tools such as putty scrapers and putty scrapers, as well as new and old sandpapers, respectively. The tool holder is divided into a putty scraping tool storage structure 10 and a sandpaper storage structure 20 according to the types of tools stored. Both tool holders can be hung on the crossbar of a three-dimensional operating platform or a mobile lifting platform 30, and the hanging height is selected according to the height and operating height of the operator. The tool holder is convenient and flexible to use, and avoids the problem of having too many tools and nowhere to store them.
[0052] Preferably, the putty scraping tool storage structure 10 of this embodiment includes:
[0053] Bracket 1; and
[0054] A bracket hanging plate 2 is arranged on the back of the bracket 1, the number of the bracket hanging plates 2 is two, and the two bracket hanging plates 2 are symmetrically arranged along the upper end of the back of the bracket 1;
[0055] The interior of the bracket 1 is formed as a space for accommodating a putty scraper and a putty scraper.
[0056] Among them, the bracket 1 of this embodiment is configured as an isosceles triangle structure;
[0057] Bracket 1 includes:
[0058] An isosceles triangle back plate 101, with side baffles 103 disposed on the sides of the back plate 101; and
[0059] An isosceles triangle front plate 102;
[0060] The front plate 102 is connected to the front side of the back plate 101 through the side baffle 103, and the size of the front plate 102 is smaller than that of the back plate 101;
[0061] The space between the front plate 102 and the back plate 101 is a space for storing a putty scraper and a putty scraper, and the front side and the upper part of the space are open structures.
[0062] In addition, the bracket suspension plate 2 of the present embodiment is configured as an L-shaped structure, and the bracket suspension plate 2 can be overlapped on the cross bar of the three-dimensional operating platform or the mobile lifting platform 30.
[0063] This embodiment further defines the specific structure of the putty scraping tool storage structure 10, which is divided into a bracket 1 and a bracket hanging plate 2. The bracket 1 adopts an isosceles right triangle structure. Since the putty scraper and the putty scraper have a nearly quadrilateral structure, the bracket 1 designed with an isosceles right triangle structure can insert one end of the putty scraper and the putty scraper into the space to form a temporary storage. When storing, the putty scraper is stored first because the putty scraper is larger in size, and then the putty scraper is stored. The front plate 102 of the bracket 1 is smaller in size, so the position of the putty scraper can be clearly observed, so as to avoid scratching the operator when taking and placing.
[0064] Preferably, the sandpaper storage structure 20 of this embodiment includes:
[0065] Storage cylinder 3; and
[0066] A storage tube hanging plate 4 is arranged on the back of the storage tube 3, and the number of the storage tube hanging plate 4 is one;
[0067] The inner space of the storage tube 3 is formed as a space for accommodating new and old sandpapers.
[0068] The upper part and the front side of the storage tube 3 in this embodiment are both open structures.
[0069] The storage tube hanging plate 4 is configured as an L-shaped structure, and the storage tube hanging plate 4 can be overlapped on the crossbar of the three-dimensional operating platform or the mobile lifting platform 30.
[0070] Preferably, the bracket 1 of this embodiment is configured as an isosceles right triangle structure with a side length of 20 cm, and the thickness of the bracket 1 is 5 cm;
[0071] The height of the front plate 102 of the bracket 1 is 1 / 2 of the height of the back plate 101 .
[0072] Preferably, the storage tube 3 of this embodiment is a cylindrical structure with a diameter of 20 cm, and the width of the opening on the front side of the storage tube 3 is 5 cm.
[0073] The sandpaper storage structure 20 of this embodiment includes a storage tube 3 and a storage tube hanging plate 4. The storage tube 3 is a cylinder with an open front and upper portion for easy access to sandpaper and other small tools.
[0074] During manufacturing, the tool holder is made of laser-cut aluminum profiles with a thickness of 5 mm. The cross-section of the device needs to have its edges polished to prevent scratches during use. The upper hanging area of the device is made wider to increase strength and maximize the weighing capacity.
[0075] In the above technical solution, the utility model provides a coating construction platform tool bracket, which has the following beneficial effects:
[0076] The tool holder of the utility model is divided into a putty scraper storage structure 10 and a sandpaper storage structure 20, which can be hung on the crossbar of the three-dimensional operating platform through a hanging plate. The hanging height meets the operating height requirements of workers and provides temporary storage space for putty scrapers, putty scrapers, and new and old sandpapers, effectively solving the problem of having too many tools but nowhere to store them, and is convenient to use.
[0077] The above only describes some exemplary embodiments of the present invention by way of illustration. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.
Claims
1. A tool support for a painting work platform, the tool support being suspended on a crossbar of a three-dimensional operating platform or a mobile lifting platform (30), characterized in that: The tool holder is divided into: A putty scraping tool storage structure (10) for temporarily storing a putty scraper and a putty scraper; and A sandpaper storage structure (20) for temporarily storing new and old sandpaper; The putty scraping tool storage structure (10) and the sandpaper storage structure (20) are both configured as open structures, and corresponding tools are placed in corresponding storage structures.
2. A tool support for a painting construction platform according to claim 1, characterized in that: The putty scraping tool storage structure (10) comprises: a bracket (1); and A bracket hanging plate (2) arranged on the back of the bracket (1), the number of the bracket hanging plates (2) being two, and the two bracket hanging plates (2) being symmetrically arranged along the upper end of the back of the bracket (1); The interior of the bracket (1) is formed with a space for accommodating the putty scraper and the putty scraper plate.
3. A tool support for a painting construction platform according to claim 2, characterized in that: The bracket (1) is configured as an isosceles triangle structure; The bracket (1) comprises: An isosceles triangle-shaped back plate (101), with side baffles (103) provided on the sides of the back plate (101); and An isosceles triangle front plate (102); The front plate (102) is connected to the front side of the back plate (101) through the side baffle (103), and the size of the front plate (102) is smaller than that of the back plate (101); The space between the front plate (102) and the back plate (101) is a space for storing the putty scraper and the putty scraper, and the front side and the upper part of the space are open structures.
4. A coating construction platform tool support according to claim 2 or 3, characterized in that: The bracket suspension plate (2) is configured as an L-shaped structure, and the bracket suspension plate (2) can be overlapped on the crossbar of the three-dimensional operating platform or the mobile lifting platform (30).
5. A tool support for a painting construction platform according to claim 1, characterized in that: The sandpaper storage structure (20) comprises: A storage cylinder (3); and A storage tube hanging plate (4) arranged on the back of the storage tube (3), wherein the number of the storage tube hanging plate (4) is one; The internal space of the storage cylinder (3) is formed as a space for accommodating new and old sandpapers.
6. A tool support for a painting construction platform according to claim 5, characterized in that: The upper part and the front side of the storage cylinder (3) are both open structures.
7. A tool support for a painting construction platform according to claim 5 or 6, characterized in that: The storage tube suspension plate (4) is configured as an L-shaped structure, and the storage tube suspension plate (4) can be overlapped on the crossbar of the three-dimensional operating platform or the mobile lifting platform (30).
8. A tool support for a painting construction platform according to claim 3, characterized in that: The bracket (1) is configured as an isosceles right triangle structure with a side length of 20 cm, and the thickness of the bracket (1) is 5 cm; The height of the front plate (102) of the bracket (1) is 1 / 2 of the height of the back plate.
9. A tool support for a painting construction platform according to claim 5, characterized in that: The storage cylinder (3) is a cylindrical structure with a diameter of 20 cm, and the width of the opening on the front side of the storage cylinder (3) is 5 cm.