Telescopic assembly type tower crane safety channel
By designing the safety channel of telescopic assembled tower crane, the problems of poor stability of the safety channel of traditional tower cranes and irregular channel base plate and protective measures are solved, and higher stability and safety are achieved and costs are reduced.
Patent Information
- Application Number
- CN202420694317.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-07
- Publication Date
- 2025-04-18
- Estimated Expiration
- 2034-04-07
AI Technical Summary
Traditional tower crane safety channel frame has poor stability, irregular channel base plate and protective measures, external interference with each other due to external force, and high-altitude installation is very risky.
A telescopic assembled tower crane safety channel is designed, including main beam, auxiliary beam, main beam cross brace, auxiliary beam cross brace, main beam railing, auxiliary beam railing, channel bottom plate and other components. It is fixed by nesting butt and positioning pin shafts to form a stable main frame frame, and the channel bottom plate is fixed by steel plate mesh snap-in, providing stable protective measures.
It achieves higher stability and safety, avoids the risk of high-altitude assembly, ensures the solid reliability of the channel base plate and the standardization of protective measures, and reduces the labor, safety and management costs of construction engineering units.
Smart Images

Figure CN222770531U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a telescopic assembled tower crane safety passage, belonging to the technical field of building construction. Background Art
[0002] The tower crane safety passage is a passage set up between the building and the tower crane so that the tower crane driver and other operators can safely and conveniently enter the tower crane horizontally from the building. At present, the traditional tower crane safety passage is assembled from steel pipe fasteners and fixed between the steel pipe scaffolding and the tower crane, which interferes with the force of the steel pipe scaffolding. It does not meet the requirements of the specifications and has certain safety hazards. It has become a high-probability deduction point in the inspection of various types of lifting equipment in recent years. In addition, the erection of the steel pipe assembled tower crane safety passage is usually carried out at high altitudes, which not only poses a greater operational risk, but also may cause fasteners to loosen, the load-bearing frame to be unstable, and the protective measures on both sides to be irregular during use, which poses a greater safety hazard. Utility Model Content
[0003] The utility model aims to overcome the deficiencies of the prior art and provide a telescopic assembled tower crane safety passage.
[0004] The technical solution provided by the utility model is as follows: a telescopic assembled tower crane safety passage, characterized in that it includes a main beam, the main beam is movably connected to a secondary beam, the two main beams are movably connected with evenly distributed main beam cross braces, each main beam is provided with a main beam cross brace bracket corresponding to the main beam cross brace, the main beam cross brace brackets on the two main beams are symmetrical to each other, the two ends of the main beam cross brace are respectively inserted into the symmetrical main beam cross brace brackets on the two main beams, and are fixed by the main beam cross brace fixing bolts; the two secondary beams are movably connected with evenly distributed secondary beam cross braces, the two ends of each secondary beam cross brace are connected with U-shaped secondary beam cross brace brackets, and the secondary beam cross brace brackets are connected to the main beam cross brace brackets. The support is fixed to the secondary beam through the U-shaped groove of the U-shaped secondary beam cross brace bracket, and the lower end is fixed with the secondary beam cross brace fixing bolts; the main beam cross brace and the secondary beam cross brace are covered with a number of channel bottom plates, the main beam is provided with a main beam railing fixing sleeve, the main beam railing is inserted into the main beam railing fixing sleeve, the secondary beam is provided with a secondary beam railing fixing sleeve, the secondary beam railing is inserted into the secondary beam railing fixing sleeve, the lower ends of the main beam railing and the secondary beam railing are locked with cotter pins, and the bottoms of the main beam railing and the secondary beam railing are provided with skirting boards; the main beam railing and the secondary beam railing are fixed to each other with railing connectors; the main beam is provided with a hanging point, and the lower end of the main beam is provided with a tower crane channel connecting lock.
[0005] Furthermore, the channel floor is composed of an angle iron frame and a steel plate mesh on the angle iron frame, and the angle iron frame of the channel floor is fixed to the main beam cross brace through the steel plate mesh buckle.
[0006] Furthermore, a safety door is installed between the ends of the secondary beam railings.
[0007] Furthermore, the main beam and the auxiliary beam are butt-jointed by nesting and fixed by a positioning pin shaft, and the lower end of the positioning pin shaft is fixed by a cotter pin.
[0008] Furthermore, the main beam has 6 cross braces and the secondary beam has 4 cross braces.
[0009] Furthermore, a rubber pad is provided inside the tower crane channel connecting lock.
[0010] The beneficial effects of the utility model are as follows: the utility model comprises a main beam, a secondary beam, a main beam cross brace, a secondary beam cross brace, a main beam railing, a secondary beam railing and a channel bottom plate. Before installation, it is only necessary to assemble the various components on the ground, and after the main beam and the secondary beam are nested and connected and fixed with positioning pins, the main and secondary beam cross braces are respectively fixed to the main and secondary beams through the main and secondary beam cross brace brackets and high-strength bolts. Compared with the traditional channel, the main frame frame thus formed has higher stability and avoids the risk of high-altitude assembly; the channel bottom plate is laid flat on the main beam and the secondary beam cross brace, and is firmly fixed with steel plate mesh buckles, so that the walking channel thus formed is solid and reliable, overcoming the drawbacks of non-compliant laying of traditional channel floors; the main and secondary beam railings are fixed to the main and secondary beams, the railings are connected and fixed to each other with railing connectors, the lower ends of the railings are locked with cotter pins to prevent falling off, and skirting boards are provided at the bottom of the railings, thereby forming stable protective measures on both sides of the walking channel, which can effectively prevent people and work tools from falling from heights, and overcome the problems of inadequate and non-standard protective measures on both sides of the traditional channel.
[0011] The utility model solves many drawbacks of the traditional steel pipe fastener type tower crane safety passage frame, such as poor stability, non-standard passage bottom plate and protective measures, external force interference between attached steel pipe scaffolding, and high risk of high-altitude erection. It has the characteristics of safety and compliance, convenience and efficiency, beautiful appearance, and reusability. Moreover, each component can be disassembled separately and stored in a classified manner, realizing standardization, modularization, and standardization, which can greatly reduce the labor cost, safety cost, and management cost of construction engineering units. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a structural schematic diagram of the utility model;
[0013] Figure 2 It is a side view of the utility model;
[0014] Figure 3 It is a top view of the bottom plate of the channel of the utility model;
[0015] Figure 4 This is a schematic diagram of the connection structure of the main beam cross brace and the main beam cross brace bracket of the utility model;
[0016] Figure 5 It is a schematic diagram of the connection structure of the auxiliary beam cross brace and the auxiliary beam cross brace bracket of the utility model;
[0017] Figure 6 It is a structural schematic diagram of the channel bottom plate of the utility model.
[0018] In the figure: 1. main beam; 2. secondary beam; 3. main beam cross brace; 4. secondary beam cross brace; 5. main beam handrail; 6. secondary beam handrail; 7. skirting board; 8. passage bottom plate; 9. safety door; 10 lifting point; 11. positioning pin shaft; 12. tower crane passage connection lock; 13. rubber pad; 14. handrail connector; 15. main beam cross brace bracket; 16. main beam handrail fixing sleeve; 17. main beam cross brace fixing bolt; 18. secondary beam cross brace bracket; 19. secondary beam handrail fixing sleeve; 20. secondary beam cross brace fixing bolt; 21 angle iron frame; 22 steel plate mesh. DETAILED DESCRIPTION
[0019] The specific implementation of the utility model is described in detail below with reference to the accompanying drawings:
[0020] like Figure 1-Figure 6 As shown, a telescopic assembled tower crane safety passage comprises a main beam 1, a secondary beam 2, a main beam cross brace 3, a secondary beam cross brace 4, a main beam railing 5, a secondary beam railing 6, and a passage bottom plate 8.
[0021] The main beam 1 is made of 60*80*3mm square tube, with a total of 2 pieces, and the auxiliary beam 2 is made of 50*70*3mm square tube, with a total of 2 pieces. The main beam 1 and the auxiliary beam 2 are nested and connected, and fixed with a positioning pin 11. The lower end of the positioning pin 11 is fixed with a cotter pin. The main beam 1 and the auxiliary beam 2 are pulled out and fixed by pin fixing. The use length can be determined by changing the pin connection position of the main and auxiliary beams according to needs.
[0022] There are evenly distributed main beam cross braces 3 (6 in this embodiment) movably connected between the two main beams 1. Each main beam 1 is provided with evenly distributed main beam cross brace brackets 15 corresponding to the main beam cross braces 3. The main beam cross brace brackets 15 on the two main beams 1 are symmetrical to each other. The two ends of the main beam cross brace 3 are respectively inserted into the symmetrical main beam cross brace brackets 15 on the two main beams 1 and fixed by the main beam cross brace fixing bolts 17. There are evenly distributed secondary beam cross braces 4 (4 in this embodiment) movably connected between the two secondary beams 2. Both ends of each secondary beam cross brace 4 are connected to U-shaped secondary beam cross brace brackets 18. The secondary beam cross brace 4 is clamped on the secondary beam 2 through the U-shaped groove of the U-shaped secondary beam cross brace bracket 18, and the lower end is fixed by the secondary beam cross brace fixing bolts 20.
[0023] The main beam cross brace 3 and the secondary beam cross brace 4 are covered with a plurality of channel bottom plates 8, which are formed by connecting an angle iron frame 21 and a steel plate mesh 22 on the angle iron frame 21. The angle iron frame 21 of the channel bottom plate 8 is firmly fixed to the main beam cross brace 3 by a steel plate mesh buckle.
[0024] The main beam 1 is provided with a main beam railing fixing sleeve 16, and the main beam railing 5 is inserted into the main beam railing fixing sleeve 16 to achieve connection with the main beam 1. The sub-beam 2 is provided with a sub-beam railing fixing sleeve 19, and the sub-beam railing 6 is inserted into the sub-beam railing fixing sleeve 19 to achieve connection with the sub-beam 2, and the lower ends of the main beam railing 5 and the sub-beam railing 6 are locked with cotter pins to prevent them from falling out, and the bottoms of the main beam railing 5 and the sub-beam railing 6 are provided with skirting boards 7. All the main beam railings 5 and sub-beam railings 6 are fixed to each other with railing connectors 14. A safety door 9 is installed between the ends of the two sub-beam railings 6. The main beam 1 is provided with a hanging point 10, and the lower end of the main beam 1 is provided with a tower crane channel connection lock 12, and the tower crane channel connection lock 12 is provided with a rubber pad 13.
[0025] Each component of the utility model can be disassembled at ordinary times for easy classification and storage. When in use, it is necessary to first determine the horizontal distance between the tower crane and the building, select the appropriate telescopic length according to the horizontal distance, and then transport each component to the location of the tower crane, and complete the assembly work on the ground. The assembly order is as follows: After the main beam 1 and the auxiliary beam 2 are nested and connected and fixed with positioning pins to form two main limbs, the main beam cross brace 3 and the auxiliary beam cross brace 4 are respectively fixed to the main beam 1 and the auxiliary beam 2 through the main beam cross brace bracket 15, the auxiliary beam cross brace bracket 18, and high-strength bolts. After the components are assembled, the tower crane is used to lift the assembled safety passage to the expected installation height through the lifting point 10. One end of the passage is hung on the tower body through the tower crane passage connection lock, and the other end is inserted into the building, and no external force interference is generated with the external frame structure such as the steel pipe scaffolding. The passage should be horizontal or high outside and low inside, and the horizontal angle can be made not more than 8 degrees by appropriately raising the inner part of the building. At this point, the overall installation of the safety passage is completed.
[0026] It should be understood that the parts not elaborated in detail in this specification belong to the prior art. The above embodiments are only descriptions of the preferred implementation methods of the utility model, and are not intended to limit the scope of the utility model. Without departing from the design spirit of the utility model, various modifications and improvements made by ordinary engineers and technicians in this field to the technical solution of the utility model should fall within the protection scope determined by the claims of the utility model.
Claims
1. A telescopic assembled tower crane safety passage, characterized in that It includes a main beam, which is movably connected to a secondary beam. The two main beams are movably connected with evenly distributed main beam cross braces. Each main beam is provided with a main beam cross brace bracket corresponding to the main beam cross brace. The main beam cross brace brackets on the two main beams are symmetrical to each other. The two ends of the main beam cross brace are respectively inserted into the symmetrical main beam cross brace brackets on the two main beams and fixed by the main beam cross brace fixing bolts; the two secondary beams are movably connected with evenly distributed secondary beam cross braces. The two ends of each secondary beam cross brace are connected with U-shaped secondary beam cross brace brackets. The secondary beam cross brace is fixed by the U-shaped groove of the U-shaped secondary beam cross brace bracket On the secondary beam, the lower end is fixed with secondary beam cross brace fixing bolts; the main beam cross brace and the secondary beam cross brace are covered with several channel bottom plates, the main beam is provided with a main beam railing fixing sleeve, the main beam railing is inserted into the main beam railing fixing sleeve, the secondary beam is provided with a secondary beam railing fixing sleeve, the secondary beam railing is inserted into the secondary beam railing fixing sleeve, the lower ends of the main beam railing and the secondary beam railing are locked with cotter pins, and the bottoms of the main beam railing and the secondary beam railing are provided with skirting boards; the main beam railing and the secondary beam railing are fixed to each other with railing connectors; the main beam is provided with a hanging point, and the lower end of the main beam is provided with a tower crane channel connecting lock.
2. A telescopic assembled tower crane safety passage according to claim 1, characterized in that The channel bottom plate is composed of an angle iron frame and a steel plate mesh on the angle iron frame. The angle iron frame of the channel bottom plate is fixed to the main beam cross brace through the steel plate mesh buckle.
3. The telescopic assembled tower crane safety passage according to claim 1 is characterized in that A safety door is installed between the ends of the auxiliary beam railings.
4. The telescopic assembled tower crane safety passage according to claim 1 is characterized in that The main beam and the auxiliary beam are butt-jointed by nesting and fixed by a positioning pin shaft, and the lower end of the positioning pin shaft is fixed by a cotter pin.
5. The telescopic assembled tower crane safety passage according to claim 1 is characterized in that The main beam has 6 cross braces and the auxiliary beam has 4 cross braces.
6. The telescopic assembled tower crane safety passage according to claim 1 is characterized in that A rubber pad is arranged inside the tower crane channel connecting lock.