Self-propelled flap gate combined water retaining structure

By adopting a combined water barrier structure of self-propelled flip gates in the river, and using the design of civil base plates and maintenance workshops, the water barrier effect is achieved under the large river width. The installation difficulty and maintenance problems of conventional gates are solved through convenient maintenance methods, extending the equipment life and reducing the failure rate.

CN222796340UActive Publication Date: 2025-04-25李彬
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202421495355.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2025-04-25
Estimated Expiration
2034-06-27

AI Technical Summary

Technical Problem

When the river channel is large and the partition pier cannot be built in the middle of the river channel, the width of the conventional gate needs to be very wide, resulting in high cost, difficult manufacturing and installation, and inconvenient operation. The flip gate is also difficult to maintain underwater due to long-term submersion, short life and high failure rate.

Method used

The self-propelled flip gate joint waterproof structure is adopted, including civil engineering base plate, maintenance factory and flip gate module. The extension length of the civil engineering base plate is the same as the width of the river channel. Multiple flip gate modules move along the civil engineering base plate and enter the maintenance factory for maintenance. The lifting equipment is used to lift the module above the water surface for maintenance.

Benefits of technology

In the case of large river width, water barrier is achieved through the combination of multiple flip gate modules, which overcomes the problems of high cost, difficulty in installation and inconvenient operation of conventional gates, and extends the equipment life through convenient maintenance and maintenance methods and reduces the failure rate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222796340U_ABST
    Figure CN222796340U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of hydraulic engineering, in particular to a self-propelled flap gate combined water retaining structure which comprises a civil engineering bottom plate, a maintenance plant and a flap gate module, the civil engineering bottom plate is arranged at the bottom of a river channel in the state that the extension direction is perpendicular to the water flow direction of the river channel, and the extension length of the civil engineering bottom plate is the same as the width of the river channel. The overhaul plant covers one end or two ends of the civil engineering bottom plate and communicates with the river channel, the internal space of the overhaul plant can contain at least one flap gate module, and hoisting equipment for assisting overhaul is erected at the position, higher than the water surface and the ground, of the internal space of the overhaul plant. The flap gate modules are sequentially arranged on the civil engineering bottom plate and block river water flow, and each flap gate module can move along the civil engineering bottom plate to enter the maintenance workshop. The self-propelled flap gate combined water retaining structure is suitable for occasions where the river channel is wide and partition piers cannot be built in the middle of the river channel, and is convenient to overhaul.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy projects, in particular to a self-propelled flap gate combined water retaining structure. Background Art

[0002] In water conservancy projects, gates can be opened and closed by operating equipment to drive the movable gate body, thereby achieving the purpose of water discharge and water blocking. They are key equipment that can ultimately achieve the predetermined functions of the project construction.

[0003] Conventional gates are usually integral, and their width is equivalent to the river channel that needs to be blocked. When the river channel is wide and it is impossible to build a pier in the middle of the river channel due to navigation and other reasons, the width of the conventional gate needs to be made very wide, which not only increases the cost, but also brings difficulties to manufacturing, installation, operation, and maintenance. In order to solve the problem that "when the river channel is wide and it is impossible to build a pier in the middle of the river channel, the width of the conventional gate is wide", multiple flap gates that can rotate and rise around the bottom hinge are often combined to achieve the purpose of blocking water.

[0004] However, since the bottom hinge of the flap gate is fixedly installed on the civil engineering bottom plate at the bottom of the river channel, the flap gate and the equipment that operates its opening and closing (usually a hydraulic cylinder) are submerged underwater for a long time, making it difficult to inspect and maintain. As a result, the life span is short and the failure rate is also high. Utility Model Content

[0005] In order to solve the above technical problems, the utility model provides a self-propelled flap gate combined water retaining structure suitable for occasions where the river channel is wide and it is impossible to build a partition pier in the middle of the river channel, and which is easy to maintain.

[0006] The utility model adopts the following technical solutions:

[0007] The utility model provides a self-propelled flap gate combined water retaining structure, comprising a civil construction base plate, a maintenance workshop and a flap gate module, wherein the civil construction base plate is arranged at the bottom of a river channel in a state where the extension direction is perpendicular to the direction of water flow in the river channel, and the extension length of the civil construction base plate is the same as the width of the river channel, the maintenance workshop cover is arranged at one end or both ends of the civil construction base plate and is connected to the river channel, the internal space of the maintenance workshop can accommodate at least one flap gate module, and the internal space of the maintenance workshop is provided with auxiliary maintenance lifting equipment at a position above the water surface and the ground, a plurality of flap gate modules are arranged on the civil construction base plate in sequence to block the water flow in the river channel, and each flap gate module can move along the civil construction base plate to enter the maintenance workshop.

[0008] Preferably, the top of the civil engineering base plate is concave to form a rectangular groove, the bottom of the flap gate module is arranged in the rectangular groove, and the flap gate module is provided with multiple slides on the opposite sides of the bottom position, respectively. The multiple slides on each side are arranged in a straight line along the extension direction of the civil engineering base plate, and the multiple slides on each side are abutted against the side wall of the corresponding side of the rectangular groove.

[0009] Preferably, two gate running tracks are arranged in parallel and at intervals on the upstream and downstream sides of the civil engineering base plate, and the two side walls opposite to each other of the rectangular groove are concave to form two track mounting grooves, and the two gate running tracks are arranged in the two track mounting grooves one by one, and two running devices are correspondingly arranged on the opposite sides of the flap gate module, and the two running devices are pressed on the two gate running tracks one by one, and the running devices can move along the extension direction of the gate running tracks.

[0010] Preferably, the running device comprises a roller assembly and a driving device, the roller assembly is rollingly arranged on the gate running track along the extension direction of the gate running track, and the driving end of the driving device is drivingly connected to the driving wheel on the roller assembly.

[0011] Preferably, the internal space of the maintenance plant is provided with lifting equipment and a water pool in sequence from high to low, the lifting equipment is arranged above both the water surface and the ground, and the water pool is connected to the river.

[0012] Preferably, the flap gate module comprises a flap door body, a linear drive device and a cabin, one end of the flap door body is hinged to the top of the cabin, one end of the linear drive device is hinged to the top of the cabin, and the other end is hinged to the bottom of the flap door body.

[0013] Preferably, the flap door body is a hollow box body, and a reinforcing plate is provided at an internal interval of the flap door body.

[0014] Preferably, the cabin is a hollow box.

[0015] Preferably, a signal acquisition device, an electrical control device and a communication device are provided in the cabin; the signal acquisition device and the electrical control device are both connected to the linear drive device by signal, and the communication device is connected to the electrical control device by signal.

[0016] Preferably, a leakage drainage pump and a drainage pipe are provided in the cabin, one end of the drainage pipe is connected to the drainage outlet of the leakage drainage pump, and the other end is connected to the outside of the cabin.

[0017] Compared with the prior art, the beneficial effects of the utility model are:

[0018] The self-propelled flap gate combined water retaining structure of the utility model can be applied to occasions where the river channel width is large and it is impossible to build a pier in the middle of the river channel. In actual use scenarios, water retaining is achieved through the combination of multiple flap gate modules, which overcomes the problems of high cost, great difficulty in manufacturing and installation, and inconvenient operation of conventional integral gates. When the flap gate module needs to be repaired due to being submerged underwater for a long time, it can be moved along the civil engineering bottom plate into the maintenance workshop, and then the flap gate module to be repaired can be lifted to above the water surface for inspection and maintenance with the help of the lifting equipment in the maintenance workshop, which overcomes the problem of inconvenient inspection and maintenance of conventional flap gates. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a main structural diagram of a self-propelled flap gate combined with a water retaining structure in an embodiment of the utility model.

[0020] Figure 2 It is a top view of the structure of the self-propelled flap gate combined with the water retaining structure in the embodiment of the utility model.

[0021] Figure 3 It is a side structural diagram of a self-propelled flap gate combined with a water retaining structure in an embodiment of the utility model.

[0022] Figure 4 It is a partial enlarged view of the self-propelled flap gate combined with the water retaining structure at the track mounting groove position in the embodiment of the utility model.

[0023] Figure 5 It is a structural schematic diagram of a flap gate module on a self-propelled flap gate combined with a water retaining structure in an embodiment of the utility model.

[0024] The reference numerals are described as follows:

[0025] 1. Civil construction floor 301, traveling device

[0026] 101, rectangular groove 302, flap door body

[0027] 102, track mounting groove 303, linear drive device

[0028] 2. Maintenance workshop 304, engine room

[0029] 201. Lifting equipment 4. Slide plate

[0030] 202, pool 5, gate walking track

[0031] 3. Flap gate module DETAILED DESCRIPTION

[0032] The following is a further detailed description of the specific implementations of the present invention in conjunction with the accompanying drawings. These implementations are only used to illustrate the present invention, but not to limit the present invention.

[0033] In the description of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0034] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0035] In addition, in the description of the present invention, unless otherwise specified, “plurality” means two or more.

[0036] See also Figures 1 to 3 The present embodiment provides a self-propelled flap gate combined water retaining structure, comprising a civil construction base plate 1, a maintenance building 2 and a flap gate module 3. The civil construction base plate 1 is arranged at the bottom of the river channel in a state where the extension direction is perpendicular to the direction of the river flow, and the extension length of the civil construction base plate 1 is the same as the width of the river channel. The maintenance building 2 is covered at one end or both ends of the civil construction base plate 1 and is connected to the river channel. The internal space of the maintenance building 2 can accommodate at least one flap gate module 3, and the internal space of the maintenance building 2 is provided with a lifting device 201 for auxiliary maintenance at a position above the water surface and the ground. Multiple flap gate modules 3 are arranged in sequence on the civil construction base plate 1 and block the river flow, and each flap gate module 3 can move along the civil construction base plate 1 into the maintenance building 2.

[0037] The self-propelled flap gate combined water retaining structure of the present embodiment is applicable to occasions where the river channel width is large and it is impossible to build a pier in the middle of the river channel. In actual use scenarios, water retaining is achieved through the combination of multiple flap gate modules 3, which overcomes the problems of high cost, difficulty in manufacturing and installation, and inconvenient operation of conventional integral gates. When the flap gate module 3 needs to be repaired due to being submerged underwater for a long time, it can be moved along the civil engineering bottom plate 1 into the maintenance building 2, and then the flap gate module 3 to be repaired can be lifted above the water surface for inspection and maintenance with the help of the lifting equipment 201 in the maintenance building 2, which overcomes the problem of inconvenient inspection and maintenance of conventional flap gates.

[0038] It should be noted that, when the flap gate module 3 is to be repaired, multiple flap gate modules 3 need to be moved into the maintenance building 2 in turn and lifted out of the water surface for maintenance by the lifting equipment 201. Therefore, if the width of the on-site river channel permits, it is preferred to set up maintenance buildings 2 at both ends of the civil engineering base plate 1 to improve the maintenance efficiency.

[0039] Preferably, see Figures 3 to 5 The top of the civil engineering bottom plate 1 is concave to form a rectangular groove 101, the bottom of the flap gate module 3 is arranged in the rectangular groove 101, and the flap gate module 3 is provided with a plurality of slide plates 4 on opposite sides of the bottom position, the plurality of slide plates 4 on each side are arranged in a straight line along the extension direction of the civil engineering bottom plate 1, and the plurality of slide plates 4 on each side are in contact with the side wall of the corresponding side of the rectangular groove 101. The setting of the slide plates 4 can resist the horizontal water pressure acting on the flap gate module 3 on the one hand, and can also prevent the flap gate module 3 from deflecting during the movement along the civil engineering bottom plate 1 on the other hand.

[0040] Preferably, in this embodiment, the slide plate 4 is made of a material with a low friction coefficient, and the low friction property of the material reduces the friction between the slide plate 4 and the civil engineering base plate 1, so that the flap gate module 3 moves along the civil engineering base plate 1 more smoothly.

[0041] Preferably, see Figure 3 and Figure 4 Two gate running tracks 5 are arranged in parallel and spaced on the upstream and downstream sides of the civil engineering bottom plate 1, and the two opposite side walls of the rectangular groove 101 are concave to form two track installation grooves 102. The two gate running tracks 5 are arranged in the two track installation grooves 102 one by one, and two running devices 301 are arranged on the opposite sides of the flap gate module 3. The two running devices 301 are pressed on the two gate running tracks 5 one by one, and the running devices 301 can move along the extension direction of the gate running tracks 5. The gate running tracks 5 are arranged in the track installation grooves 102 to prevent the flap gate module 3 from overturning under the action of water pressure.

[0042] Preferably, the running device 301 includes a roller assembly and a driving device, the roller assembly is arranged on the gate running track 5 in a rolling manner along the extension direction of the gate running track 5, and the driving end of the driving device is connected to the driving wheel on the roller assembly. Under the drive of the driving device, the roller assembly rolls and drives the flap gate module 3 to move along the gate running track 5.

[0043] Preferably, in this embodiment, the driving device adopts a driving electric motor or a driving hydraulic motor.

[0044] Preferably, in this embodiment, the driving devices on the two running devices 301 are synchronously controlled by a controller.

[0045] Preferably, see Figure 2 and Figure 3 The interior space of the maintenance workshop 2 is provided with a lifting device 201 and a pool 202 from high to low. The lifting device 201 is set above both the water surface and the ground, and the pool 202 is connected to the river. Each flap gate module 3 can move along the gate walking track 5 to the maintenance workshop 2. At this time, the flap gate module 3 is located in the lower pool 202 as a whole, and then the flap gate module 3 is hooked and lifted by the lifting device 201 above, and finally repaired and maintained above the water surface.

[0046] Preferably, in this embodiment, the lifting device 201 is a crane.

[0047] Preferably, see Figure 5 The flap gate module 3 includes a flap gate body 302, a linear drive device 303 and a cabin 304. One end of the flap gate body 302 is hinged at the top of the cabin 304, and one end of the linear drive device 303 is hinged at the top of the cabin 304, and the other end is hinged at the bottom of the flap gate body 302. When the flap gate module 3 is working, the linear drive device 303 pushes the flap gate body 302 to rotate around the hinge point with the cabin 304, thereby achieving the purpose of rotating and lifting the flap gate body 302 to block water, and rotating and lowering the flap gate body 302 to lie flat to discharge water.

[0048] Preferably, in this embodiment, the linear drive device 303 adopts a hydraulic cylinder.

[0049] Preferably, the flap door body 302 is a hollow box, and a reinforcing plate is arranged at the internal interval of the flap door body 302. Since the flap door body 302 does not completely block the water flow when it is in the water blocking state, some water still flows under the flap door body 302. The flap door body 302 adopts a hollow box structure to generate buoyancy, balance the water pressure acting on the flap door body 302 when blocking water, and reduce the force on the linear drive device 303; and the reinforcing plate is arranged at the internal interval of the flap door body 302 to increase the structural strength of the flap door body 302.

[0050] Preferably, the cabin 304 is a hollow box, so that the buoyancy generated by the box is used to balance the deadweight of the flap gate module 3 and reduce the movement resistance of the flap gate module 3.

[0051] Preferably, signal acquisition equipment, electrical control equipment and communication equipment are provided in the cabin 304. The signal acquisition equipment and the electrical control equipment are both connected to the linear drive device 303 by signal, and the communication equipment is connected to the electrical control equipment by signal, so that the position and operation status information of the flap gate module 3 can be collected and reported, and external instructions can be executed and the execution results can be fed back.

[0052] It should be noted that the signal acquisition equipment, electrical control equipment and communication equipment are all existing mature technologies, and the specific application forms will not be repeated here.

[0053] Preferably, a leakage drainage pump and a drainage pipe are provided in the cabin 304, one end of the drainage pipe is connected to the drainage port of the leakage drainage pump, and the other end is connected to the outside of the cabin 304. Once leakage is found in the cabin 304, the leakage drainage pump can be started to drain the accumulated water in the cabin 304 through the drainage pipe in time.

[0054] Preferably, in the present embodiment, each flap gate module 3 uses an independent lithium battery pack to power the linear drive device 303, the running device 301 and other various electrical equipment.

[0055] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principle of the present invention. These improvements and substitutions should also be regarded as the protection scope of the present invention.

Claims

1. A self-propelled flap gate combined with a water retaining structure, characterized in that: The invention comprises a civil engineering base plate (1), a maintenance workshop (2) and a flap gate module (3); the civil engineering base plate (1) is arranged at the bottom of a river channel in a state where its extension direction is perpendicular to the direction of the water flow in the river channel, and the extension length of the civil engineering base plate (1) is the same as the width of the river channel; the maintenance workshop (2) is covered at one end or both ends of the civil engineering base plate (1) and is connected to the river channel; the internal space of the maintenance workshop (2) can accommodate at least one flap gate module (3), and a lifting device (201) for auxiliary maintenance is set up in the internal space of the maintenance workshop (2) at a position above the water surface and the ground; a plurality of flap gate modules (3) are arranged in sequence on the civil engineering base plate (1) and block the water flow in the river channel; each flap gate module (3) can move along the civil engineering base plate (1) into the maintenance workshop (2).

2. The self-propelled flap gate combined water retaining structure according to claim 1 is characterized in that: The top of the civil engineering base plate (1) is concave to form a rectangular groove (101), the bottom of the flap gate module (3) is arranged in the rectangular groove (101), and the flap gate module (3) is provided with a plurality of slide plates (4) on two opposite sides of the bottom position, the plurality of slide plates (4) on each side are arranged in a straight line along the extension direction of the civil engineering base plate (1), and the plurality of slide plates (4) on each side are in contact with the side wall of the corresponding side of the rectangular groove (101).

3. The self-propelled flap gate combined water retaining structure according to claim 2 is characterized in that: Two gate running tracks (5) are arranged in parallel and spaced apart on the upstream and downstream sides of the civil engineering base plate (1); the two opposite side walls of the rectangular groove (101) are inwardly recessed to form two track mounting grooves (102); the two gate running tracks (5) are arranged in the two track mounting grooves (102) in a one-to-one correspondence; two running devices (301) are correspondingly arranged on the opposite sides of the flap gate module (3); the two running devices (301) are pressed in a one-to-one correspondence on the two gate running tracks (5), and the running devices (301) can move along the extension direction of the gate running tracks (5).

4. The self-propelled flap gate combined water retaining structure according to claim 3 is characterized in that: The running device (301) comprises a roller assembly and a driving device. The roller assembly is rollingly arranged on the gate running track (5) along the extension direction of the gate running track (5). The driving end of the driving device is drivingly connected to the driving wheel on the roller assembly.

5. The self-propelled flap gate combined water retaining structure according to claim 1 is characterized in that: The internal space of the maintenance workshop (2) is provided with a lifting device (201) and a water pool (202) in order from high to low, the lifting device (201) is arranged above both the water surface and the ground, and the water pool (202) is connected to a river.

6. The self-propelled flap gate combined water retaining structure according to claim 1 is characterized in that: The flap gate module (3) comprises a flap door body (302), a linear drive device (303) and a cabin (304), wherein one end of the flap door body (302) is hingedly arranged on the top of the cabin (304), and one end of the linear drive device (303) is hingedly arranged on the top of the cabin (304), and the other end of the linear drive device (303) is hingedly arranged on the bottom of the flap door body (302).

7. The self-propelled flap gate combined water retaining structure according to claim 6 is characterized in that: The flap door body (302) is a hollow box body, and a reinforcing plate is arranged at an internal interval of the flap door body (302).

8. The self-propelled flap gate combined water retaining structure according to claim 6 is characterized in that: The cabin (304) is a hollow box.

9. The self-propelled flap gate combined water retaining structure according to claim 8, characterized in that: The cabin (304) is provided with a signal acquisition device, an electrical control device and a communication device. The signal acquisition device and the electrical control device are both connected to the linear drive device (303) by signal, and the communication device is connected to the electrical control device by signal.

10. The self-propelled flap gate combined water retaining structure according to claim 8, characterized in that: A leakage drainage pump and a drainage pipe are provided in the cabin (304); one end of the drainage pipe is connected to the drainage port of the leakage drainage pump, and the other end is connected to the outside of the cabin (304).