Ground drilling grouting plugging machine
By using airbag tube and airbag cushion structure in the drilling grouting machine to fill the drilling gap, and combining the design of pressing handles and return springs, the problems of large grouting head and slurry splashing in the prior art are solved, achieving a more efficient sealing effect and less waste and pollution.
Patent Information
- Application Number
- CN202520193373.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-07
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2035-02-07
AI Technical Summary
The grouting head part of the existing drilling grouting machine is large in size and inconvenient to operate. The gap between the drilling hole and the slurry outlet tube causes the slurry to splash, causing waste and pollution, especially when the drilling holes are irregular.
A ground drilling grouting sealing machine is designed, adopting the airbag tube and airbag cushion structure, which fills the gap between the drilling hole and the slurry outlet tube through the expansion of the airbag tube and the airbag cushion to prevent the slurry from spraying outside the body; at the same time, through the cooperation of the pressing handle and the return spring, the downward pressure of the grouting head and the sealing of the airbag cushion are facilitated, and the sealing effect is improved.
It effectively prevents external spraying of the slurry, reduces waste and pollution, and improves the sealing effect of grouting, especially when the drilling holes are irregular, it can still be effectively filled and sealed.
Smart Images

Figure CN222796373U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of grouting, in particular to a ground drilling grouting plugging machine. Background Art
[0002] The grouting machine uses grouting filling technology to utilize the delamination voids formed in the overlying rock during the movement of the rock strata. The filling slurry is injected into the delamination voids at high pressure through a drill hole arranged on the ground. The high-pressure slurry compacts the lower rock strata, thereby increasing the delamination voids. The filling slurry after dehydration and compaction supports the overlying rock strata, slows down the spread of rock strata movement to the surface, effectively controls surface collapse, and ensures that surface structures are not damaged.
[0003] However, the existing drilling grouting machine has some limitations. The grouting head is relatively large, which is inconvenient in actual operation and difficult to move and align with the borehole. In addition, there is a gap between the borehole and the grouting pipe. When the grouting mechanism is started, the slurry will be ejected instantly, causing the slurry to splash out of the gap, which not only wastes the slurry but also pollutes the surrounding ground. This phenomenon is more frequent when the borehole passes through the wall irregularly. Therefore, a ground drilling grouting plugging machine is proposed to solve the above problems. Utility Model Content
[0004] The utility model aims to solve the shortcomings in the prior art and proposes a ground drilling grouting plugging machine.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] A ground drilling grouting plugging machine comprises a drilling grouting machine body, and a drilling mechanism and a grouting mechanism arranged on the drilling grouting machine body, wherein the grouting mechanism comprises a grouting head; and further comprises a first mounting frame, wherein a movable second mounting frame is mounted on the top of the first mounting frame, wherein the grouting head is detachably mounted in the grouting head, wherein a plurality of legs are fixedly connected to the top of the first mounting frame, wherein movable wheels are arranged at the bottom ends of the plurality of legs, and an adjusting mechanism is mounted on the first mounting frame, so that a grouting pipe on the grouting head can fill the drilling gap during grouting plugging.
[0007] As a further description of the above technical solution: the adjustment mechanism includes an airbag tube, to which an integral airbag cushion is fixedly connected, the slurry outlet pipe is installed on the outer wall of the slurry outlet pipe, and the airbag tube is connected to the inside of the airbag cushion.
[0008] As a further description of the above technical solution: a pressure tube is fixedly connected to the outer wall of the second mounting frame, a connecting tube is fixedly connected to the air outlet of the pressure tube, the connecting tube is connected to the airbag cushion, a detachable cover body is installed at the opening of the pressure tube, an extrusion rod extending into the pressure tube is slidably installed in the cover body, one end of the extrusion rod is fixedly connected to an extrusion plug, the other end of the extrusion rod is fixedly connected to a top block, and a recess is provided on the top wall of the top block.
[0009] As a further description of the above technical solution: a bracket is fixedly connected to the top of the first mounting frame, a pressure handle is hinged on the bracket, the pressure handle and the recess size match each other, the plurality of legs are arranged in a circular array with the grouting head as the center, and the second mounting frame is located between the two first mounting frames.
[0010] As a further description of the above technical solution: there are two first mounting frames, a plurality of support rods are fixedly connected between the two first mounting frames, and a plurality of the support rods are sleeved with return springs.
[0011] The utility model has the following beneficial effects:
[0012] 1. Compared with the prior art, the ground drilling grouting plugging machine is provided with an airbag tube and an airbag cushion of an integrated structure. When in use, the slurry outlet pipe wrapped with the airbag tube is inserted into the drill hole. When the connecting pipe sends air into the airbag tube and the airbag cushion of the integrated structure of the air box, the airbag tube and the airbag cushion are stretched open, so that the gap between the drill hole and the slurry outlet pipe can be filled to prevent the slurry from spraying outward. Moreover, since the airbag tube and the airbag cushion are made of elastic materials, when the two are expanded and filled, irregular drill holes can be filled, thereby further improving the filling effect.
[0013] 2. Compared with the prior art, this ground drilling grouting and plugging machine is provided with a pressure handle and a return spring. By pressing the pressure handle, the air in the pressure tube enters the integrated airbag tube and airbag cushion through the connecting tube; in this process, the downward pressure of the grouting head facilitates the operation of the slurry tube, which is beneficial to aiming and inserting the drill hole; at the same time, the airbag cushion is driven to contact the ground during the downward pressure of the grouting head, and the ground is sealed by the airbag cushion, and the drill hole gap is sealed by the airbag tube, thereby further improving the sealing effect. In addition, during the extrusion of the airbag cushion, its own air is squeezed into the airbag tube, which is beneficial to the expansion of the airbag tube. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a schematic diagram of the overall structure of a ground drilling grouting plugging machine proposed by the utility model;
[0015] Figure 2 for Figure 1 The enlarged structural diagram at A in the middle;
[0016] Figure 3 This is a schematic diagram of the pressure pipe structure of a ground drilling grouting plugging machine proposed by the utility model;
[0017] Figure 4 The utility model provides a schematic diagram of the air bag tube structure of a ground drilling grouting plugging machine.
[0018] Legend:
[0019] 1. Grouting head; 2. First mounting frame; 3. Support legs; 4. Moving wheels; 5. Support rod; 6. Reset spring; 7. Second mounting frame; 8. Pressure pipe; 9. Cover body; 10. Connecting pipe; 11. Extrusion rod; 12. Extrusion plug; 13. Notch; 14. Top block; 15. Slurry outlet pipe; 16. Airbag pipe; 17. Airbag cushion; 18. Press handle. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] Reference Figure 1-Figure 4 The utility model provides a ground drilling grouting plugging machine: it includes a drilling grouting machine body, and a drilling mechanism and a grouting mechanism arranged on the drilling grouting machine body, the grouting mechanism includes a grouting head 1, the drilling grouting machine, and the drilling mechanism and the grouting mechanism in the drilling grouting machine are all prior arts, which are not described in detail here; it also includes a first mounting frame 2, a movable second mounting frame 7 is installed on the top of the first mounting frame 2, the grouting head 1 is detachably installed in the grouting head 1, a plurality of legs 3 are fixedly connected to the top of the first mounting frame 2, and the bottom ends of the plurality of legs 3 are all provided with moving wheels 4, and an adjusting mechanism is installed on the first mounting frame 2, so that the slurry outlet pipe 15 on the grouting head 1 can fill the drilling gap during grouting plugging.
[0022] The regulating mechanism includes an airbag tube 16, to which an integral airbag cushion 17 is fixedly connected, a slurry outlet pipe 15 is mounted on the outer wall of the slurry outlet pipe 15, the airbag tube 16 and the airbag cushion 17 are internally connected, a pressure tube 8 is fixedly connected to the outer wall of the second mounting frame 7, a connecting tube 10 is fixedly connected to the air outlet of the pressure tube 8, the connecting tube 10 is connected to the airbag cushion 17, a detachable cover body 9 is mounted at the opening of the pressure tube 8, an extrusion rod 11 extending into the pressure tube 8 is slidably mounted in the cover body 9, one end of the extrusion rod 11 is fixedly connected to an extrusion plug 12, and the other end of the extrusion rod 11 is fixedly connected to a top block 14, and the top block A notch 13 is provided on the top wall 14, through which an airbag tube 16 and an airbag cushion 17 are arranged as an integrated structure. When in use, the slurry outlet pipe 15 wrapped with the airbag tube 16 is inserted into the drilled hole. When the connecting pipe 10 delivers air into the airbag tube 16 and the airbag cushion 17 of the air box integrated structure, the airbag tube 16 and the airbag cushion 17 are stretched open, so that the gap between the drilled hole and the slurry outlet pipe 15 can be filled to prevent the slurry from spraying outwards. Moreover, since the airbag tube 16 and the airbag cushion 17 are made of elastic materials, when the two are expanded and filled, irregular drilled holes can be filled, thereby further improving the filling effect.
[0023] The top of the first mounting frame 2 is fixedly connected to a bracket, and a pressure handle 18 is hinged on the bracket. The size of the pressure handle 18 and the recess 13 match. There are two first mounting frames 2, and a plurality of support rods 5 are fixedly connected between the two first mounting frames 2. The plurality of support rods 5 are sleeved with a return spring 6. By setting the pressure handle 18 and the return spring 6, since the grouting head 1 and the pressure tube 8 are both mounted on the second mounting frame 7, and the second mounting frame 7 is mounted on the first mounting frame 2, when in use, by pressing the pressure handle 18, the pressure handle 18 is inserted into the recess 13 during the downward rotation process, thereby squeezing the extrusion rod 11, so that the extrusion rod 11 drives the extrusion plug 12 to be squeezed in the pressure tube 8, thereby making the pressure The air in the tube 8 enters the integrated airbag tube 16 and airbag cushion 17 through the connecting tube 10; and the pressure handle 18 can also squeeze the grouting head 1 during the pressing process, so that the grouting head 1 is pressed down as a whole in the first mounting frame 2, and the return spring 6 is in a compressed state. During this process, the pressing down of the grouting head 1 facilitates the operation of the slurry outlet tube 15, which is beneficial for aiming and inserting the drill hole; at the same time, the grouting head 1 drives the airbag cushion 17 to contact the ground during the pressing down process, and the ground is blocked by the airbag cushion 17, and the drill hole gap is blocked by the airbag tube 16, thereby further improving the sealing effect. In addition, during the squeezing process of the airbag cushion 17, its own air is squeezed into the airbag tube 16, which is beneficial for the expansion of the airbag tube 16.
[0024] A plurality of legs 3 are arranged in a circular array with the grouting head 1 as the center, and the second mounting frame 7 is located between the two first mounting frames 2 .
[0025] Working principle: After drilling a hole using the drilling mechanism, when grouting is required, first insert the slurry discharge pipe 15 wrapped with the airbag tube 16 into the drilled hole, and then press the pressure handle 18. The pressure handle 18 is inserted into the recess 13 during the downward rotation, thereby squeezing the extrusion rod 11, so that the extrusion rod 11 drives the extrusion plug 12 to squeeze in the pressure tube 8, and then the air in the pressure tube 8 enters the integrated airbag tube 16 and airbag cushion 17 through the connecting tube 10. When the connecting tube 10 delivers air to the airbag tube 16 and airbag cushion 17 of the integrated structure of the air box, the airbag tube 16 and the airbag cushion 17 are stretched open, so that the gap between the drilled hole and the slurry discharge pipe 15 can be filled.
[0026] The pressing handle 18 can also squeeze the grouting head 1 during the pressing process, so that the grouting head 1 is pressed down as a whole in the first mounting frame 2. During this process, the pressing down of the grouting head 1 facilitates the operation of the slurry outlet pipe 15, thereby facilitating aiming and inserting the drill hole; during the pressing down of the grouting head 1, the airbag cushion 17 is driven to contact the ground, and the airbag cushion 17 blocks the ground.
[0027] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A ground drilling grouting plugging machine, comprising a drilling grouting machine body, and a drilling mechanism and a grouting mechanism arranged on the drilling grouting machine body, characterized in that: The grouting mechanism comprises a grouting head (1); and also comprises a first mounting frame (2), wherein a movable second mounting frame (7) is mounted on the top of the first mounting frame (2), wherein the grouting head (1) is detachably mounted inside the grouting head (1), wherein a plurality of legs (3) are fixedly connected to the top of the first mounting frame (2), wherein the bottom ends of the plurality of legs (3) are all provided with moving wheels (4), and an adjusting mechanism is mounted on the first mounting frame (2) so that a slurry outlet pipe (15) on the grouting head (1) can fill the drilled hole gap during grouting plugging.
2. A ground drilling grouting plugging machine according to claim 1, characterized in that: The regulating mechanism comprises an airbag tube (16), to which an integral airbag cushion (17) is fixedly connected, the slurry outlet pipe (15) is mounted on the outer wall of the slurry outlet pipe (15), and the airbag tube (16) and the airbag cushion (17) are internally communicated.
3. A ground drilling grouting plugging machine according to claim 2, characterized in that: The outer wall of the second mounting frame (7) is fixedly connected to a pressure tube (8), the air outlet of the pressure tube (8) is fixedly connected to a connecting tube (10), the connecting tube (10) is connected to the airbag cushion (17), a detachable cover body (9) is installed at the opening of the pressure tube (8), an extrusion rod (11) extending into the pressure tube (8) is slidably installed in the cover body (9), one end of the extrusion rod (11) is fixedly connected to an extrusion plug (12), the other end of the extrusion rod (11) is fixedly connected to a top block (14), and a notch (13) is provided on the top wall of the top block (14).
4. A ground drilling grouting plugging machine according to claim 3, characterized in that: The top end of the first mounting frame (2) is fixedly connected to a bracket, and a pressure handle (18) is hingedly connected to the bracket. The size of the pressure handle (18) matches that of the recess (13).
5. A ground drilling grouting plugging machine according to claim 4, characterized in that: There are two first mounting frames (2), a plurality of support rods (5) are fixedly connected between the two first mounting frames (2), and a return spring (6) is sleeved on each of the plurality of support rods (5).
6. A ground drilling grouting plugging machine according to claim 4, characterized in that: The plurality of legs (3) are arranged in a circular array with the grouting head (1) as the center, and the second mounting frame (7) is located between the two first mounting frames (2).
Citation Information
Cited By
Grouting device and grouting method for front coal seam roof water plugging
CN120925753A
A grouting device and grouting method for front coal seam roof water plugging
CN120925753B