Attached type lifting scaffold cross-layer lifting auxiliary steel frame device
By extending the wall point on the frame of the attached lift scaffolding, the problem that the wall support cannot tie the climbing frame during the jumping layer is solved, and the smooth progress of climbing and saving time and labor are achieved.
Patent Information
- Application Number
- CN202421775156.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2034-07-25
AI Technical Summary
During the climbing process of the attached lift scaffolding, when encountering a jump layer, the original wall-attached support cannot tie the climbing frame, resulting in the need to remove and reinstall the scaffolding and wall-attached support, which is time-consuming and labor-intensive.
An attached lifting scaffolding span-layer lifting auxiliary steel frame device is designed. By extending the wall point on the frame body, the frame height is adjusted to the jump height minus six meters, thereby avoiding the steps of dismantling and reinstallation.
It realizes that there is no need to remove and reinstall the scaffolding and wall support in the jump structure, and successfully completes the climb, saving time and labor.
Smart Images

Figure CN222797012U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of scaffolds for building construction, and particularly relates to an auxiliary steel frame device for lifting a cross-layer of an attached lifting scaffold. Background Art
[0002] According to Article 4.4.8 of the Safety Technical Specifications for Tool-Type Scaffolding in Construction (JGJ202-2010) for attached lifting scaffolding, the cantilever height of the frame shall not be greater than 2 / 5 of the frame height and shall not exceed 6m. Since the climbing of the attached lifting scaffold is similar to that of the ordinary steel pipe scaffold, wall connecting parts need to be installed at certain intervals in the vertical and horizontal directions during the installation process. During the climbing process of the attached lifting scaffold, a wall support is generally installed vertically for each layer. The wall support is installed and fixed on the attached wall of the building. After the attached lifting scaffold climbs, it is interlocked and fixed with the climbing frame to play a pulling role; since the attached lifting scaffold is an integral lifting type, when a certain section of the structure has a leap floor, and the leap floor height exceeds 6m, the original position of the wall support cannot pull the climbing frame. At this time, if the attached lifting scaffold is to be completed The climbing of the scaffolding needs to be removed and the scaffolding pieces and wall supports of the matching structure need to be reinstalled. When the leap floor structure is adjusted to only one layer, it is time-consuming and labor-intensive to adjust the scaffolding pieces and wall supports of the climbing frame. Utility Model Content
[0003] The purpose of the utility model is to overcome the shortcomings of the prior art and to provide an attached lifting scaffolding cross-layer lifting auxiliary steel frame device, which can smoothly climb and save time and effort by extending the wall attachment points of the climbing frame.
[0004] The purpose of the utility model is achieved through the following technical scheme. This attached lifting scaffolding cross-layer lifting auxiliary steel frame device includes a frame and a base. The frame is a rectangular frame structure. The front and rear sides of the upper end of the frame are equipped with mounting plates. The mounting plates face the attached lifting scaffolding. Bolt holes are provided on the mounting plates. The wall-attached support is installed and fixed on the mounting plates through the matching installation of the bolt holes and the bolt assemblies. The base is fixed to the bottom rear side of the frame by welding. The base is fixed to the floor slab by a screw fixing unit. An oblique support is fixed between the mounting plate and the base on the rear side of the frame by welding. The height of the frame is the height of the leap floor minus six meters.
[0005] The beneficial effects of the utility model are as follows: compared with the prior art, a frame and a base are arranged and fixed on the floor slab by means of a screw fixing unit, and the wall-mounted support is installed and fixed on the mounting plate of the frame, and the height of the frame is the height of the leap floor minus six meters; in this way, it is possible to avoid dismantling part of the scaffolding plates and reinstalling the scaffolding plates and wall-mounted supports of an adaptable structure, and by extending the wall-mounted point of the climbing frame, climbing can be carried out smoothly and saves time and effort.
[0006] Preferably, the frame includes four channel steels, which are welded end to end to form a rectangular frame structure, and the notches of the four channel steels are all facing the inside of the frame; this is more convenient to form, has lower cost, and can ensure strength.
[0007] Preferably, a plurality of reinforcing steel plates distributed at equal intervals are welded and fixed between the two vertically distributed channel steels; by adding reinforcing steel plates, the strength of the frame is further enhanced, thereby improving the stability of the overall device.
[0008] Preferably, the base includes two symmetrically distributed channel steels, with a gap between the two channel steels for the screw fixing unit to insert, and the webs of the two channel steels are relatively distributed and a number of connecting blocks are welded and fixed between the two; on the premise of meeting the strength and usage functions, this molding is more convenient, the cost is lower, and the strength can be guaranteed.
[0009] Preferably, at least two screw mounting positioning plates are welded and fixed to the upper part of the base; by adding screw mounting positioning plates, the screw fixing unit can fix the auxiliary steel frame device on the floor.
[0010] Preferably, the screw fixing unit includes a screw and a nut, one end of the screw is located on the floor slab and is integrally fixed by concrete pouring when the floor slab is cast, and the other end of the screw passes through the screw mounting positioning plate and is tightened and fixed by the nut; through the arrangement of the above structure, the screw fixing unit is more convenient to install and is not easy to be pulled out; thereby, the auxiliary steel frame device has better stability during use.
[0011] Preferably, a channel steel diagonal brace is fixed between the welding points of the frame and the base and the diagonal brace; this further improves the strength of the auxiliary steel frame device.
[0012] Preferably, two bolt holes are provided in the shape of long strips and are arranged transversely on the two mounting plates; in this way, the wall-mounted support is adjustable on the mounting plate, so that the wall-mounted support and the climbing frame of the attached lifting scaffold can be aligned to ensure safety.
[0013] Preferably, lifting ears are welded and fixed on both the left and right sides of the frame to facilitate the lifting of the auxiliary steel frame device. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the main structure of the utility model with an attached lifting scaffold.
[0015] Figure 2 It is a left-side structural schematic diagram of the auxiliary steel frame device of the utility model.
[0016] Figure 3 It is a right view structural schematic diagram of the auxiliary steel frame device of the utility model.
[0017] Figure 4 It is a bottom view structural schematic diagram of the auxiliary steel frame device of the utility model.
[0018] The numbers in the accompanying drawings are: 1, frame; 2, base; 3, mounting plate; 4, attached lifting scaffold; 5, wall support; 6, screw fixing unit; 7, floor; 8, diagonal support; 9, channel steel diagonal support; 10, lifting ear; 11, channel steel; 12, reinforcing steel plate; 21, gap; 22, connecting block; 23, screw installation positioning plate; 31, bolt hole; 61, screw; 62, nut. DETAILED DESCRIPTION
[0019] The following is a detailed introduction to the utility model in conjunction with the accompanying drawings: Figures 1 to 4 As shown, the utility model includes a frame 1 and a base 2. The frame 1 is a rectangular frame structure. Mounting plates 3 are installed on both the front and rear sides of the upper end of the frame 1. The mounting plate 3 faces the attached lifting scaffold 4. Bolt holes 31 are provided on the mounting plate 3. The wall-mounted support 5 is installed and fixed on the mounting plate 3 through the matching installation of the bolt hole 31 and the bolt assembly. The base 2 is fixed to the bottom rear side of the frame 1 by welding. The base 2 is fixed to the floor slab 7 by a screw fixing unit 6. An inclined support 8 is fixed between the mounting plate 3 and the base 2 on the rear side of the frame 1 by welding; the height of the frame 1 is the height of the leap floor minus six meters.
[0020] The frame body 1 includes four channel steels 11 , which are welded end to end to form the frame body 1 with a rectangular frame structure, and the notches of the four channel steels 11 are all facing the inner side of the frame body 1 .
[0021] A plurality of reinforcing steel plates 12 distributed at equal intervals are welded and fixed between two vertically distributed channel steels 11 .
[0022] The base 2 includes two symmetrically distributed channel steels 11 , with a gap 21 for the screw fixing unit 6 to pass through left between the two channel steels 11 , and the webs of the two channel steels 11 are relatively distributed and a plurality of connecting blocks 22 are welded and fixed therebetween.
[0023] At least two screw-mounted positioning plates 23 are welded and fixed to the upper portion of the base 2 .
[0024] The screw fixing unit 6 includes a screw 61 and a nut 62 . One end of the screw 61 is located on the floor 7 and is fixed by integrally forming the floor with concrete. The other end of the screw 61 passes through the screw mounting positioning plate 23 and is tightened and fixed by the nut 62 .
[0025] A channel steel diagonal brace 9 is fixed between the welding point between the frame 1 and the base 2 and the diagonal brace 8 .
[0026] Two bolt holes 31 are provided in a strip shape and are arranged transversely on the two mounting plates 3 .
[0027] Lifting ears 10 are welded and fixed on both left and right sides of the frame 1 .
[0028] The workflow of the utility model is:
[0029] S1. Confirm the installation height of the auxiliary frame. According to the project drawings, confirm the height of the part that needs to be lifted and the installation span of the upper and lower rail frames to ensure that the installation conditions meet the requirements of the construction method;
[0030] S2. Auxiliary structure in-depth production. According to the project drawings, the frame 1 and the base 2 are subjected to force calculation and compounding, and the steel structure drawings are in-depth designed. Each material is cut according to size to ensure that the frame size is correct after welding and installation.
[0031] S3. Determine the installation position of the auxiliary steel frame and complete the pre-embedding of the casing. Determine the on-site guide rail layout according to the on-site construction drawings and the detailed drawings of the attached lifting scaffolding, and complete the pre-embedding of the screw 61 of the screw fixing unit 6 of the auxiliary steel structure according to the plan layout;
[0032] S4. Installation of auxiliary steel frame. After pouring is completed, use bolts to install the auxiliary steel frame device to the corresponding wall attachment position and fix it with bolts;
[0033] S5. Stability and deviation inspection. After all auxiliary steel frame devices are installed, check the stability of the steel structure and make sure that the bolts are secure before putting it into use. Check the axis of the installation position to make sure that it corresponds to the attachment point of the attached lifting scaffolding.
[0034] S6. After confirming that the installation is correct, lift the attached lifting scaffolding as a whole.
[0035] The above are only specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be based on the protection scope of the claims.
Claims
1. An attached lifting scaffolding cross-layer lifting auxiliary steel frame device, comprising a frame body (1) and a base (2), characterized in that: The frame (1) is a rectangular frame structure. The upper end of the frame (1) is provided with mounting plates (3) on both sides, the mounting plates (3) face the attached lifting scaffold (4). The mounting plates (3) are provided with bolt holes (31). The wall-mounted support (5) is mounted and fixed on the mounting plates (3) by the matching installation of the bolt holes (31) and the bolt assembly. The base (2) is fixed to the bottom rear side of the frame (1) by welding. The base (2) is fixed to the floor slab (7) by a screw fixing unit (6). An inclined support (8) is fixed between the mounting plate (3) and the base (2) at the rear side of the frame (1) by welding. The height of the frame (1) is the height of the leap floor minus six meters.
2. The cross-layer lifting auxiliary steel frame device for the attached lifting scaffold according to claim 1 is characterized in that: The frame (1) comprises four channel steels (11), which are welded end to end to form a frame (1) with a rectangular frame structure, and the notches of the four channel steels (11) are all facing the inner side of the frame (1).
3. The cross-layer lifting auxiliary steel frame device for the attached lifting scaffold according to claim 2 is characterized in that: A plurality of reinforcing steel plates (12) distributed at equal intervals are welded and fixed between the two vertically distributed channel steels (11).
4. The cross-layer lifting auxiliary steel frame device for the attached lifting scaffold according to claim 1 is characterized in that: The base (2) comprises two symmetrically distributed channel steels (11), a gap (21) is left between the two channel steels (11) for the screw fixing unit (6) to pass through, and the webs of the two channel steels (11) are relatively distributed and a plurality of connecting blocks (22) are welded and fixed between the two.
5. The cross-layer lifting auxiliary steel frame device for attached lifting scaffolding according to claim 1 is characterized in that: At least two screw-mounting positioning plates (23) are welded and fixed to the upper part of the base (2).
6. The cross-layer lifting auxiliary steel frame device for the attached lifting scaffold according to claim 5 is characterized in that: The screw fixing unit (6) comprises a screw (61) and a nut (62), one end of the screw (61) is located on the floor slab (7) and is fixed by integral molding when the floor slab is cast with concrete, and the other end of the screw (61) passes through the screw mounting positioning plate (23) and is tightened and fixed by the nut (62).
7. The cross-layer lifting auxiliary steel frame device for the attached lifting scaffold according to claim 1 is characterized in that: A channel steel diagonal brace (9) is fixed between the welding point between the frame (1) and the base (2) and the diagonal brace (8).
8. The cross-layer lifting auxiliary steel frame device for attached lifting scaffolding according to claim 1 is characterized in that: Two bolt holes (31) are provided and are in the shape of long strips and are arranged transversely on the two mounting plates (3).
9. The cross-layer lifting auxiliary steel frame device for the attached lifting scaffold according to claim 1 is characterized in that: Lifting ears (10) are welded and fixed on both left and right sides of the frame (1).