Heating and ventilation pipeline construction device

By designing a HVAC construction device including a base, a support seat and a mounting table, the three-point fixing technology of the clamping device is used to solve the problems of inaccurate pipe positioning and displacement, achieving high-precision pipeline docking and improving construction efficiency.

CN222798310UActive Publication Date: 2025-04-25SHANDONG XINYIDA CONSTR MANAGEMENT CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421727381.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2025-04-25
Estimated Expiration
2034-07-19

AI Technical Summary

Technical Problem

In the existing HVAC construction technology, the pipeline positioning is inaccurate and the three-side clamping positioning cannot be achieved, resulting in the pipeline being easily displaced during the construction process, affecting the construction efficiency and quality.

Method used

A HVAC construction device is designed, including a base, a support seat and a mounting table. At least two opposite clamping devices are provided on the mounting table. The support seat can be lifted and translated to adjust the height of the clamping device. The clamping device forms a three-point fixation to the pipe through the positioning assembly and the clamping assembly.

Benefits of technology

Through the three-point fixing technology, the positioning accuracy of the pipeline is significantly improved, the displacement of the pipeline during construction is avoided, and the construction efficiency and quality are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222798310U_ABST
    Figure CN222798310U_ABST
Patent Text Reader

Abstract

The utility model discloses a heating and ventilation pipeline construction device, and relates to the technical field of road construction. Comprising a base, supporting seats and a mounting table; the mounting table is provided with at least two oppositely-arranged clamping devices used for mounting pipelines. The supporting seat is connected between the base and the clamping and fixing device, and the supporting seat can enable the clamping and fixing device to do lifting motion relative to the base and can enable the clamping and fixing device to do translational motion relative to the base; the clamping and fixing device comprises a fixing seat and a positioning device connected into the fixing seat, the positioning device comprises a positioning assembly arranged at the bottom of the fixing seat and clamping assemblies arranged on the two sides of the fixing seat, and clamping and fixing of the periphery of the pipeline are jointly formed through the clamping assemblies and the positioning assembly; the positioning assembly is used for supporting the bottom of the pipeline, and the clamping assembly is used for clamping the two sides of the pipeline in the radial direction, so that three-point fixing of the pipeline is formed, it is ensured that the pipeline cannot move in the construction device, the positioning precision is further improved, and the working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of road construction, and in particular relates to a HVAC pipeline construction device. Background Art

[0002] HVAC pipelines include purification device ducts, central air conditioning ventilation ducts, industrial air supply and exhaust ventilation ducts, environmental protection system suction and exhaust ducts, mining gas extraction pipes, etc. In actual construction applications, due to the long pipeline laying path, one pipeline cannot meet the construction requirements, so multiple pipelines need to be spliced ​​to form a pipeline or pipeline network. How to complete the docking of pipelines during manufacturing, processing and construction is a technical problem. Most of the existing ones use cranes and then manually move and align them, which undoubtedly increases the labor intensity of workers and reduces the accuracy of docking. If there is a deviation in pipeline docking, it is easy to cause pipeline leakage, which is not conducive to the construction progress, and will also increase the difficulty of subsequent maintenance and overhaul. Therefore, how to achieve accurate docking of pipelines is a problem to be solved.

[0003] In the existing patents, for example, the application number is CN202320899496.5, and the patent name is a construction and installation bracket for HVAC pipelines. The inclined platform is installed above the lifting device. The lower angle of the inclined platform is used to place the pipes, and a baffle is provided. It can only be installed through an open-shaped inclined platform. The inclined platform has an inclined bottom surface. The bottom surface and the baffle are used to place the pipes. The pipes are arranged in this way and need to enter the inclined platform for rolling. In addition, the pipes are only attached on two sides, and the pipes can still move in the axial direction, and accurate positioning cannot be achieved. In the process of docking along the axis, the docking surface can easily slip along the axial direction, resulting in inaccurate positioning. Utility Model Content

[0004] The utility model provides a heating channel road construction device to solve the problems in the prior art that the pipeline positioning is inaccurate, the pipeline cannot be clamped and positioned on three sides, and displacement does not occur.

[0005] The technical solution adopted by the utility model is:

[0006] A HVAC pipeline construction device comprises a base, a support base and a mounting platform; the mounting platform has at least two clamping devices arranged opposite to each other for mounting pipelines; the support base is connected between the base and the clamping devices, and the support base can perform lifting and translational movements relative to the base;

[0007] The clamping device includes a fixing seat and a positioning device, wherein the positioning device includes a positioning component arranged at the bottom of the fixing seat and clamping components arranged at both sides of the fixing seat, and the outer periphery of the pipeline is clamped together by the clamping component and the positioning component.

[0008] A HVAC pipeline construction device of the utility model also has the following additional technical features:

[0009] The fixing seat includes a first clamping plate and a second clamping plate slidably connected to one side of the first clamping plate; a frame structure for accommodating the pipeline is formed between the first clamping plate and the second clamping plate; clamping assemblies are connected to the opposite sides of the first clamping plate and the second clamping plate; an adjusting device is connected between the first clamping plate and the second clamping plate, and the adjusting device is used to adjust the distance between the second clamping plate and the first clamping plate.

[0010] The first clamping plate is provided with a moving groove, and the second clamping plate is provided with a strip-shaped protrusion matched with the moving groove, so that the second clamping plate moves relative to the first clamping plate by moving along the moving groove through the strip-shaped protrusion.

[0011] The adjusting device includes an adjusting rod, on which an external thread is arranged. The adjusting rod can be installed on the first clamping plate and the second clamping plate. One end of the adjusting rod extending out of the outer side of the first clamping plate is connected to a driving member, and the second clamping plate is driven to slide relative to the first clamping plate by the driving member.

[0012] The positioning assembly includes a positioning plate, and the positioning plate has an arc-shaped groove facing the side of the pipeline for fitting the circumference of the pipeline; or, the positioning assembly includes at least two rollers symmetrically distributed along the radial direction of the pipeline, and an installation position for positioning the pipeline is formed between the two rollers.

[0013] The clamping assembly comprises a clamping plate and a plurality of clamping blocks connected to the clamping plate through fasteners and facing the pipe side; the clamping blocks can be adjusted to a preset angle relative to the clamping plate through the fasteners.

[0014] The clamping block is symmetrically and obliquely connected to the clamping plate, and the clamping block has a clamping surface capable of clamping the circumference of the pipeline.

[0015] The support seat includes a lifting rod and a lifting plate connected to the top of the lifting rod, a clamping device is connected to the top of the lifting plate, and the lifting plate can perform lifting and lowering movements under the telescopic action of the lifting rod to adjust the installation height of the clamping device; or, the support seat includes a seat body, a moving component connected to the seat body, a folding lifting frame connected to the moving component and a connecting plate connected to the top of the folding lifting frame, the top of the connecting plate is connected to the clamping device; the folding lifting frame includes a folding structure formed by connecting a plurality of lifting rod components connected by hinges, and can perform lifting and lowering movements along the height direction.

[0016] The base includes a base body, a transverse slide rail connected to the base body, and a longitudinal track connected to the transverse slide rail; the longitudinal track can move laterally along the transverse slide rail, the longitudinal track is connected to at least two slide plates, and the slide plate is connected to a support base.

[0017] Casters are arranged near the edge of the bottom of the seat body to enable the base to move relative to the ground.

[0018] Due to the adoption of the above technical solution, the beneficial effects achieved by the utility model are as follows:

[0019] 1. In the present application, a HVAC pipeline construction device is provided, wherein a mounting platform is connected to the top of a support seat, and two relatively arranged clamping devices of the mounting platform can drive the clamping devices to adjust their height vertically through the support seat at the bottom to adapt to the installation of pipelines of different heights; a positioning device is provided in the fixing seat in the clamping device, and a positioning assembly of the positioning device is connected to the bottom of the fixing seat for supporting the bottom of the pipeline, and a clamping assembly of the positioning device is arranged on both sides of the fixing seat for clamping both sides of the radial direction of the pipeline, thereby forming a three-point fixation of the pipeline, avoiding the traditional two-point clamping that can only be achieved on the side of the pipeline, ensuring that the full point position of the pipeline will not be displaced in the construction device, thereby further improving the positioning accuracy and improving work efficiency.

[0020] 2. As a preferred embodiment of the utility model, the fixing seat includes a first clamping plate and a second clamping plate slidably connected to one side of the first clamping plate; the first clamping plate and the second clamping plate are connected to the opposite sides thereof with clamping assemblies; at least one of the first clamping plate or the second clamping plate is connected to an adjusting device for adjusting the spacing between the second clamping plate and the first clamping plate so as to clamp the pipeline on both sides along the radial direction of the pipeline.

[0021] The second clamping plate can move relative to the first clamping plate and can form a frame structure for accommodating the pipe with the first clamping plate, thereby achieving the purpose of being able to adapt to pipes of different diameters according to actual application conditions. When the pipe diameter is larger, the distance between the second clamping plate and the first clamping plate can be appropriately farther. When the pipe diameter is smaller, the distance between the second clamping plate and the first clamping plate can be appropriately smaller, thereby improving the adaptability of the construction device. Since the first clamping plate and the second clamping plate have clamping assemblies on the opposite side, by adjusting the clamping assemblies on the first clamping plate or the second clamping plate or on the first clamping plate and the second clamping plate, the clamping assemblies on the first clamping plate and the second clamping plate can clamp the pipe together, thereby further achieving precise positioning of the pipe.

[0022] 3. As a preferred embodiment of the present invention, the first clamping plate is in an L-shaped structure, the second clamping plate is in an I-shaped structure, the bottom end of the second clamping plate is slidably connected to the lateral side of the first clamping plate, and the middle part of the second clamping plate is connected to an adjustment device.

[0023] A frame structure is formed between the first clamping plate and the second clamping plate, and the second clamping plate can move relative to the first clamping plate to adapt to pipes of different sizes. On the one hand, it can reduce the movement space of the pipe and further improve the fixation of the pipe. On the other hand, it can shorten the distance between the clamping components on the first clamping plate and the second clamping plate relative to the pipe, and then the adjustment time can be further shortened by adjusting the clamping components, which can strengthen the clamping and fixation of the pipe and improve the positioning accuracy.

[0024] 4. As a preferred embodiment of the utility model, the adjusting device includes an adjusting rod, an external thread is arranged on the adjusting rod, a threaded hole is opened on the second clamping plate corresponding to the adjusting rod, so that the adjusting rod can be inserted into the threaded hole, and one end of the adjusting rod extending out of the outer side of the second clamping plate is connected to a driving member, and the second clamping plate is driven by the driving member to slide relative to the first clamping plate.

[0025] The adjusting rod is threadedly connected to the second clamping plate, and the position of the adjusting rod is fixed. Therefore, by rotating the adjusting rod, the second clamping plate threadedly connected to the adjusting rod can be moved relative to the axial direction of the adjusting rod, thereby adjusting the distance between the second clamping plate and the first clamping plate, thereby further achieving the fixation of different pipes.

[0026] 5. As a preferred embodiment of the present invention, the positioning assembly includes a positioning plate, and the positioning plate has an arc-shaped groove on one side facing the pipeline for fitting the circumference of the pipeline; or, the positioning assembly includes at least two rollers symmetrically distributed along the radial direction of the pipeline, and an installation position for positioning the pipeline is formed between the two rollers.

[0027] The positioning component is connected to the bottom of the fixing seat, and is used for when the pipe is placed in the frame formed by the first clamping plate and the second clamping plate, the lower part of the circumference of the pipe can be abutted and connected to the positioning component, so that the first positioning of the pipe is achieved through the positioning component. The purpose of providing an arc-shaped groove on the positioning component is to abut against the circular circumference of the pipe, or the purpose of designing the positioning component as at least two symmetrically arranged rollers is to be able to fully abut against the circumference of the pipe using the circumferential surface of the roller. Since the rollers are located on both sides of the pipe in the radial direction, the pipe is positioned between the two rollers, thereby further achieving accurate positioning of the pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0029] Figure 1This is a schematic diagram of the main structure of a HVAC pipeline construction device in one implementation mode of the utility model;

[0030] Figure 2 It is a left structural schematic diagram of a HVAC pipeline construction device in one embodiment of the utility model;

[0031] Figure 3 It is a structural schematic diagram of a clamping device of a HVAC pipeline construction device under one implementation mode of the utility model;

[0032] In the figure,

[0033] 1 base;

[0034] 2 support seat, 21 lifting rod, 22 lifting plate;

[0035] 3. Mounting table;

[0036] 4 clamping device, 41 fixing seat, 411 first clamping plate, 412 second clamping plate, 42 positioning device, 421 positioning assembly, 4211 positioning plate, 422 clamping assembly, 4221 clamping plate, 4222 clamping block;

[0037] 5 adjusting device, 51 adjusting rod, 52 driving member;

[0038] 6 arc grooves, 7 casters. DETAILED DESCRIPTION

[0039] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

[0040] In addition, in the description of the present invention, it should be understood that the terms "top", "bottom", "inside", "outside", "axial", "radial", "circumferential", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0041] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or a communication; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0042] In the present utility model, unless otherwise clearly specified and limited, the first feature "above" or "below" the second feature may be that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. In the description of this specification, the description with reference to the terms "implementation method", "example", "one embodiment", "example" or "specific example" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in an appropriate manner in any one or more embodiments or examples.

[0043] In order to more clearly illustrate the overall concept of the present invention, a detailed description is given below in the form of examples in conjunction with the accompanying drawings.

[0044] The utility model relates to a HVAC pipeline construction device, such as Figure 1-3 As shown, it includes a base 1, a support base 2 and a mounting platform 3; the mounting platform 3 has at least two relatively arranged clamping devices 4 for mounting the pipeline; the support base 2 is connected between the base 1 and the clamping device 4, and the support base 2 can perform lifting and translational movements relative to the base 1; the clamping device 4 includes a fixed base 41 and a positioning device 42, and the positioning device 42 includes a positioning component 421 arranged at the bottom of the fixed base 41 and a clamping component 422 arranged on both sides of the fixed base 41, and the clamping component 422 and the positioning component 421 jointly form a clamp on the periphery of the pipeline.

[0045] The mounting platform 3 is connected to the top of the support seat 2, and the two relatively arranged clamping devices 4 of the mounting platform 3 can drive the clamping devices 4 to adjust their height vertically through the support seat 2 at the bottom to adapt to the installation of pipelines at different heights; the fixing seat 41 in the clamping device 4 has a positioning device 42, and the positioning component 421 of the positioning device 42 is connected to the bottom of the fixing seat 41 to support the bottom of the pipeline, and the clamping components 422 of the positioning device 42 are arranged on both sides of the fixing seat 41 to clamp the two sides of the radial direction of the pipeline, thereby forming a three-point fixation of the pipeline, avoiding the traditional two-point clamping that can only be achieved on the side of the pipeline, ensuring that the full point position of the pipeline will not be displaced in the construction device, thereby further improving the positioning accuracy and improving work efficiency.

[0046] As a preferred embodiment, the fixing seat 41 includes a first clamping plate 411 and a second clamping plate 412 slidably connected to one side of the first clamping plate 411; a frame structure for accommodating the pipeline is formed between the first clamping plate 411 and the second clamping plate 412; the clamping assembly 422 is connected to the opposite sides of the first clamping plate 411 and the second clamping plate 412; an adjusting device 5 is connected between the first clamping plate 411 and the second clamping plate 412, which is used to adjust the distance between the second clamping plate 412 and the first clamping plate 411, so as to clamp the pipeline on both sides along the radial direction of the pipeline.

[0047] The second clamping plate 412 can move relative to the first clamping plate 411 and can form a frame structure for accommodating the pipe between the first clamping plate 411, thereby achieving the purpose of being able to adapt to pipes of different diameters according to actual application conditions. When the pipe diameter is larger, the distance between the second clamping plate 412 and the first clamping plate 411 can be appropriately farther, and when the pipe diameter is smaller, the distance between the second clamping plate 412 and the first clamping plate 411 can be appropriately smaller, thereby improving the adaptability of the construction device. Since the first clamping plate 411 and the second clamping plate 412 have a clamping assembly 422 on the opposite side, by adjusting the clamping assembly 422 on the first clamping plate 411 or the second clamping plate 412 or on the first clamping plate 411 and the second clamping plate 412, the clamping assembly 422 on the first clamping plate 411 and the clamping assembly 422 on the second clamping plate 412 can clamp the pipe together, thereby further achieving precise positioning of the pipe.

[0048] Furthermore, the first clamping plate 411 is in an L-shaped structure, the second clamping plate 412 is in an I-shaped structure, the bottom end of the second clamping plate 412 is slidably connected to a lateral side of the first clamping plate 411, and an adjustment device 5 is connected between the first clamping plate and the second clamping plate.

[0049] Furthermore, a movable groove is provided on the first clamping plate 411, and a strip-shaped protrusion is provided on the second clamping plate 412. The strip-shaped protrusion can cooperate with the movable groove so that the second clamping plate 412 moves relative to the first clamping plate 411 by moving the strip-shaped protrusion along the movable groove; when in use, the strip-shaped protrusion of the second clamping plate 412 can be inserted into the movable groove and move in a straight line along the movable groove so that the second clamping plate 412 moves relative to the first clamping plate 411.

[0050] A frame structure is formed between the first clamping plate 411 and the second clamping plate 412, and the second clamping plate 412 can move relative to the first clamping plate 411 to adapt to pipes of different sizes. On the one hand, it can reduce the movement space of the pipe and further improve the fixation of the pipe. On the other hand, it can shorten the distance between the clamping components 422 on the first clamping plate 411 and the second clamping plate 412 relative to the pipe, and then by adjusting the clamping components 422, the adjustment time can be further shortened, which can strengthen the clamping and fixation of the pipe and improve the positioning accuracy.

[0051] Furthermore, the adjusting device 5 includes an adjusting rod 51, on which an external thread is arranged. The adjusting rod 51 can be passed through the first clamping plate 411 and the second clamping plate 412. One end of the adjusting rod 51 extending out of the outer side of the first clamping plate 411 is connected to a driving member 52, and the second clamping plate 412 is driven to slide relative to the first clamping plate 411 by the driving member 52.

[0052] The adjusting rod 51 is threadedly connected to the second clamping plate 412, and the position of the adjusting rod 51 is fixed. Therefore, by rotating the adjusting rod 51, the second clamping plate 412 threadedly connected to the adjusting rod 51 can be moved relative to the axial direction of the adjusting rod 51, thereby adjusting the distance between the second clamping plate 412 and the first clamping plate 411, thereby further realizing the fixation of different pipelines.

[0053] The structure of the positioning component 421 is not limited by the present application and can adopt any of the following implementations:

[0054] Embodiment 1: The positioning assembly 421 includes a positioning plate 4211, and the positioning plate 4211 is provided with an arc-shaped groove 6 facing one side of the pipeline for fitting the peripheral side of the pipeline. The positioning assembly 421 is connected to the bottom of the fixing seat 41, and is used for when the pipeline is placed in the frame formed by the first clamping plate 411 and the second clamping plate 412, the lower part of the peripheral side of the pipeline can be abutted and connected to the positioning assembly 421, so that the first positioning of the pipeline is achieved through the positioning assembly 421, and the arc-shaped groove is provided on the positioning assembly 421 for the purpose of abutting against the circular peripheral surface of the pipeline.

[0055] Embodiment 2: The positioning assembly 421 includes at least two rollers symmetrically distributed along the radial direction of the pipeline, and an installation position for positioning the pipeline is formed between the two rollers. The purpose of designing the positioning assembly 421 as at least two symmetrically arranged rollers is to be able to fully abut the circumferential surface of the rollers against the circumferential side of the pipeline. Since the rollers are located on both sides of the pipeline in the radial direction, the pipeline is positioned between the two rollers, further realizing accurate positioning of the pipeline.

[0056] As a preferred embodiment, the clamping assembly 422 includes a clamping plate 4221 and a plurality of clamping blocks 4222 connected to the clamping plate 4221 through fasteners and facing the pipe side; the clamping blocks 4222 can adjust a preset angle relative to the clamping plate 4221 through fasteners.

[0057] Taking the clamping assembly 422 connected to the first clamping plate 411 as an example, the clamping assembly 422 is specifically described as follows: the clamping plate 4221 is a plate-shaped structure connected to the side of the first clamping plate 411 facing the second clamping plate 412, and a plurality of clamping blocks 4222 are connected to the side of the clamping plate 4221 facing the second clamping plate 412. The clamping blocks 4222 are evenly distributed along the length direction of the clamping plate 4221, and each clamping plate 4221 does not interfere with each other within the rotation radius; Figure 3 As shown, the present application preferably uses two clamping blocks 4222, and the clamping plate 4221 has a positioning groove on one side facing the second clamping plate 412, and connecting ends protruding from the positioning groove are formed between the two sides of the positioning groove and the clamping plate 4221, and the connecting ends are respectively connected to the clamping blocks 4222, and a first connecting hole is provided on the clamping block 4222, and a second connecting hole is provided on the connecting end, and the clamping block 4222 can be threadedly connected to the clamping plate 4221 by bolts inserted into the first connecting hole and the second connecting hole, and the rotation angle of the clamping block 4222 relative to the clamping plate 4221 can be adjusted according to actual needs, so that the angle of the clamping block 4222 can be adjusted to better fit the circumference of the pipe.

[0058] Furthermore, the clamping block 4222 is symmetrically and obliquely connected to the clamping plate 4221, and the clamping block 4222 has a clamping surface capable of clamping the circumference of the pipeline. Figure 3 As shown, the clamping block 4222 is symmetrically and obliquely connected to the clamping plate 4221, so that the clamping block 4222 can adapt to the angle of the pipe and better fit the outer circumference of the pipe to achieve clamping, thereby increasing the contact area between the clamping surface on the clamping block 4222 for clamping the pipe and the pipe, thereby increasing the clamping force on the pipe.

[0059] The structure of the support base 2 is not limited to the limitations of the present application, and any of the following implementations may be adopted:

[0060] Embodiment 1: The support seat 2 includes a lifting rod 21 and a lifting plate 22 connected to the top of the lifting rod 21. The top of the lifting plate 22 is connected to a clamping device 4. The lifting plate 22 can move up and down under the telescopic action of the lifting rod 21 to adjust the installation height of the clamping device 4.

[0061] The lifting rod 21 can adopt a hydraulic rod structure, and the top of the hydraulic rod is connected to a lifting plate 22 for connecting to the fixed seat 41. The number of support seats 2 needs to correspond to the number of fixed seats 41 of the clamping device 4. A support seat 2 needs to be connected under each fixed seat 41 to realize the lifting and lowering movement of the lifting plate 22, thereby realizing the height of the entire clamping device 4, so as to realize the docking of pipelines at different heights, making the pipeline positioning more accurate.

[0062] Embodiment 2: The support base 2 includes a base body, a moving component connected to the base body, a folding lifting frame connected to the moving component, and a connecting plate connected to the top of the folding lifting frame, and the top of the connecting plate is connected to the clamping device 4; the folding lifting frame includes a folding structure formed by connecting a plurality of hinged lifting rods 21 components, which can be lifted and lowered in the height direction.

[0063] The moving assembly includes a lead screw rotatably connected to the seat body, opposite threads are formed on both sides of the lead screw, a first slider is connected to one side of the lead screw, and a second slider is connected to the other side of the lead screw, and the first slider and the second slider move relative to each other;

[0064] The folding lifting frame includes a plurality of lifting rod 21 assemblies, and the plurality of lifting rod 21 assemblies are hingedly connected in sequence along the height direction to form a foldable structure. Specifically, in the present application, two lifting rod 21 assemblies are preferably used, wherein the first group of lifting rod 21 assemblies includes a first lifting rod 21 and a second lifting rod 21, the middle parts of the first lifting rod 21 and the second lifting rod 21 are hingedly connected, the bottom end of the first lifting rod 21 is hingedly connected to the first slider, and the bottom end of the second lifting rod 21 is hingedly connected to the second slider; the second lifting rod 21 assembly includes a third lifting rod 21 and a fourth lifting rod 21; the bottom end of the third lifting rod 21 is hingedly connected to the top end of the second lifting rod 21, the middle part of the fourth lifting rod 21 is hingedly connected to the third lifting rod 21, and the bottom end of the third lifting rod 21 is hingedly connected to the top end of the first lifting rod 21;

[0065] When in use, the lead screw is rotated to make the first slider and the second slider move closer to each other, so that the first lifting rod 21 and the second lifting rod 21 are raised, thereby driving the third lifting rod 21 and the fourth lifting rod 21 to move upward, so that the folding structure is unfolded, driving the top connecting plate to move upward, and making the clamping device 4 move upward; on the contrary, when making a descending movement, the lead screw is rotated in the opposite direction to move the first slider and the second slider away from each other, so that the height of the first lifting rod 21 and the second lifting rod 21 is reduced, driving the height of the third lifting rod 21 and the fourth lifting rod 21 to decrease.

[0066] As a preferred embodiment, the base 1 includes a base body and a transverse slide rail connected to the base body and a longitudinal track connected to the transverse slide rail; the longitudinal track can move laterally along the transverse slide rail, the longitudinal track is connected to at least two slide plates, and the slide plates are connected to the support base 2.

[0067] Specifically, the slide plate is symmetrically connected to the longitudinal track to facilitate symmetrical installation of the support base 2 and achieve relative movement of the clamping device 4 for fixing the pipeline and achieving docking of two pipelines.

[0068] The transverse slide rail is arranged along the width direction of the base 1, and the longitudinal track is arranged along the length direction of the base 1. The longitudinal track is connected to the transverse slide rail, so that the longitudinal track can move along the width direction of the base 1. Since the support seat 2 is connected to the longitudinal track, when the lifting rod 21 and the lifting plate 22 are used as the support seat 2, the lifting rod 21 is connected to the slide plate of the longitudinal track, so that the lifting rod 21 can be moved in the transverse and longitudinal directions. When the seat body, the moving assembly, the folding lifting frame and the connecting plate are used as the support seat 2, the seat body is connected to the slide plate of the longitudinal track, so that the base 1 can be moved in the transverse and longitudinal directions, so that the position of the clamping device 4 can be adapted to the installation position of the pipeline;

[0069] Since at least two clamping devices 4 are provided, in order to realize the positioning of the clamping devices 4, at least two slides are connected to the longitudinal track, and each slide is connected to the support seat 2. The purpose is to connect at least two clamping devices 4 so that each clamping device 4 can be connected to a pipe respectively, and the two clamping devices 4 can be moved and adjusted along the longitudinal track to realize precise docking, improve the accuracy of docking, and improve work efficiency.

[0070] Furthermore, casters 7 are provided at the bottom of the base body of the base 1 near the edge so that the base 1 can move relative to the ground.

[0071] The parts not described in the present invention can be realized by adopting or drawing on the existing technology.

[0072] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.

[0073] The above description is only an embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent substitution, improvement, etc. made within the spirit and principle of the present invention shall be included in the scope of the claims of the present invention.

Claims

1. A HVAC pipeline construction device, characterized in that: It comprises a base, a support base and a mounting platform; the mounting platform has at least two clamping devices arranged opposite to each other for mounting a pipeline; the support base is connected between the base and the clamping device, and the support base can perform lifting and translational movements relative to the base; The clamping device includes a fixing seat and a positioning device, wherein the positioning device includes a positioning component arranged at the bottom of the fixing seat and clamping components arranged at both sides of the fixing seat, and the outer periphery of the pipeline is clamped together by the clamping component and the positioning component.

2. A HVAC pipeline construction device according to claim 1, characterized in that: The fixing seat includes a first clamping plate and a second clamping plate slidably connected to one side of the first clamping plate; a frame structure for accommodating the pipeline is formed between the first clamping plate and the second clamping plate; clamping assemblies are connected to the opposite sides of the first clamping plate and the second clamping plate; an adjusting device is connected between the first clamping plate and the second clamping plate, and the adjusting device is used to adjust the distance between the second clamping plate and the first clamping plate.

3. A HVAC pipeline construction device according to claim 2, characterized in that: The first clamping plate is provided with a moving groove, and the second clamping plate is provided with a strip-shaped protrusion matched with the moving groove, so that the second clamping plate moves relative to the first clamping plate by moving along the moving groove through the strip-shaped protrusion.

4. A HVAC pipeline construction device according to claim 2, characterized in that: The adjusting device includes an adjusting rod, on which an external thread is arranged. The adjusting rod can be installed on the first clamping plate and the second clamping plate. One end of the adjusting rod extending out of the outer side of the first clamping plate is connected to a driving member, and the second clamping plate is driven to slide relative to the first clamping plate by the driving member.

5. A HVAC pipeline construction device according to claim 1, characterized in that: The positioning assembly includes a positioning plate, and the positioning plate has an arc-shaped groove facing the side of the pipeline for fitting the circumference of the pipeline; or, the positioning assembly includes at least two rollers symmetrically distributed along the radial direction of the pipeline, and an installation position for positioning the pipeline is formed between the two rollers.

6. A HVAC pipeline construction device according to claim 1, characterized in that: The clamping assembly comprises a clamping plate and a plurality of clamping blocks connected to the clamping plate through fasteners and facing the pipe side; the clamping blocks can be adjusted to a preset angle relative to the clamping plate through the fasteners.

7. A HVAC pipeline construction device according to claim 6, characterized in that: The clamping block is symmetrically and obliquely connected to the clamping plate, and the clamping block has a clamping surface capable of clamping the circumference of the pipeline.

8. A HVAC pipeline construction device according to claim 1, characterized in that: The support seat includes a lifting rod and a lifting plate connected to the top of the lifting rod, the top of the lifting plate is connected to a clamping device, and the lifting plate can move up and down under the telescopic action of the lifting rod to adjust the installation height of the clamping device; Alternatively, the support seat includes a seat body, a moving component connected to the seat body, a folding lifting frame connected to the moving component, and a connecting plate connected to the top of the folding lifting frame, and the top of the connecting plate is connected to the clamping device; the folding lifting frame includes a folding structure formed by connecting multiple hinged lifting rod assemblies, which can perform lifting and lowering movements in the height direction.

9. A HVAC pipeline construction device according to claim 1, characterized in that: The base includes a base body, a transverse slide rail connected to the base body, and a longitudinal track connected to the transverse slide rail; the longitudinal track can move laterally along the transverse slide rail, the longitudinal track is connected to at least two slide plates, and the slide plate is connected to a support base.

10. A HVAC pipeline construction device according to claim 9, characterized in that: Casters are arranged near the edge of the bottom of the seat body to enable the base to move relative to the ground.

Citation Information

Patent Citations

  • Construction installation support of heating and ventilation pipeline

    CN219380600U