Scaffold for large-span structure construction
By designing scaffolding with rotating connections and fixed pins, the problems of long disassembly and easy parts loss in the existing technology of scaffolding for large-span structure construction have been solved, rapid disassembly and assembly and stability have been achieved, and construction efficiency has been improved.
Patent Information
- Application Number
- CN202420552071.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-20
- Publication Date
- 2025-05-02
- Estimated Expiration
- 2034-03-20
AI Technical Summary
The existing scaffolding for large-span structure construction takes too long during disassembly and assembly, and many parts are prone to be lost, which affects the construction progress.
A scaffolding including a first pedal, a second pedal and a support frame is designed to achieve rapid disassembly and stability through the design of rotating connections and fixing pins, reducing the possibility of component loss.
It realizes rapid disassembly and assembly of scaffolding, shortens construction time, enhances structural stability, and reduces component loss.
Smart Images

Figure CN222822787U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of scaffolds, in particular to a scaffold for large-span structure construction. Background Art
[0002] A large number of scaffolds are required during the construction of large-span structures. Scaffolds are a kind of work platform set up to ensure the smooth progress of each construction process. The existing scaffolds are not very convenient to disassemble and assemble, so it takes a lot of time to disassemble and assemble, which will delay the construction progress. In addition, the existing scaffolds have many parts after being disassembled, so it is very easy for a part to be lost when the scaffolds are disassembled.
[0003] For example, a Chinese invention patent disclosed in the publication number of Chinese patent CN109113317B and the authorization announcement date of December 8, 2020 discloses a scaffold for construction, including a hollow plate, a No. 1 support column, and a No. 2 support column. The lower end of the hollow plate is clamped with a No. 1 support beam and a No. 2 support beam on both sides, and the No. 1 support beam and the No. 2 support beam are clamped with connecting beams on both sides of the lower ends. The two ends of the connecting beam pass through the No. 1 support column and the No. 2 support column respectively. A connecting ring is fixedly connected to one side of the connecting beam, and a pull rope is tied to the outer surface of the connecting ring.
[0004] However, in actual use, the above-mentioned scaffolding is provided with too many parts, so that people will increase the operation steps when disassembling and assembling, which will consume a lot of time and affect the construction progress. In addition, since the above-mentioned scaffolding has many parts, when people disassemble the scaffolding and all the parts are piled together, it is very easy for parts to be lost, so that the scaffolding cannot be assembled smoothly. Utility Model Content
[0005] The utility model aims to provide a scaffold for large-span structure construction to solve the problem that the disassembly and assembly time of the existing scaffold is too long.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a scaffold for large-span structure construction, comprising a first pedal, a second pedal and a support frame, one end of the first pedal is rotatably connected to the second pedal, one end of the first pedal and the second pedal are both rotatably connected to the support frame, the first pedal is located at one end of the second pedal and is provided with a baffle, the second pedal is located at one end of the first pedal and is provided with a first groove matching the baffle, the support frame is located below the first pedal and is rotatably connected to a first support rod, the support frame is located below the second pedal and is rotatably connected to a second support rod, and the first support rod is rotatably connected to the second support rod.
[0007] Preferably, the second support rod is fixedly connected to a first connection block at one end of the first support rod, the first support rod is provided with a second groove matching the first connection block at one end of the second support rod, and the first connection block is movably connected to the second groove.
[0008] Preferably, the first support rod is fixedly connected with second connecting blocks at both ends of the second groove, and the first connecting block and the second connecting block are both provided with matching through holes, and fixing pins are movably inserted in the through holes.
[0009] Preferably, a connecting rope is provided at one end of the first support rod, and one end of the connecting rope is fixedly connected to a fixing pin.
[0010] Preferably, four fixing columns are fixedly connected to the top of the support frame, and four sleeves are fixedly connected to the bottom of the support frame.
[0011] Compared with the prior art, the beneficial effects of the utility model are:
[0012] The utility model can realize folding of the scaffolding by arranging a rotation connection between the first pedal, the second pedal and the support frame, thereby shortening the disassembly and assembly speed; the baffle and the first groove are designed so that when the first pedal and the second pedal are in a horizontal state, the baffle is just in contact with the first groove, and the first pedal and the second pedal will not continue to fold downward, thus providing sufficient supporting force for construction personnel; the stability of the entire scaffolding is enhanced by the design of the first support rod, the second support rod and the fixing pin; when the first support rod and the second support rod are in a horizontal state, the through holes on the first connecting block and the second connecting block will be aligned; at this time, inserting the fixing pin into the through hole can prevent the first support rod and the second support rod from continuing to fold; in addition, the fixing pin is designed so that the fixing pin is always connected to the first support rod, so that the fixing pin will not be lost. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;
[0014] Figure 2 for Figure 1 A schematic diagram of the partially enlarged structure at center A;
[0015] Figure 3 This is a schematic diagram of the structure of the first support rod in the utility model.
[0016] In the figure: 1. first pedal; 2. second pedal; 3. support frame; 4. baffle; 5. first groove; 6. first support rod; 7. second support rod; 8. first connecting block; 9. second groove; 10. second connecting block; 11. through hole; 12. fixing pin; 13. connecting rope; 14. fixing column; 15. sleeve. DETAILED DESCRIPTION
[0017] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. The described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments.
[0018] See also Figure 1-3 The utility model provides a technical solution: a scaffold for long-span structure construction, comprising a first pedal 1, a second pedal 2 and a support frame 3, one end of the first pedal 1 is rotatably connected to the second pedal 2, one end of the first pedal 1 and the second pedal 2 are both rotatably connected to the support frame 3, the first pedal 1 is located at one end of the second pedal 2 and is provided with a baffle 4, the second pedal 2 is located at one end of the first pedal 1 and is provided with a first groove 5 matched with the baffle 4, the support frame 3 is located below the first pedal 1 and is rotatably connected to a first support rod 6, the support frame 3 is located below the second pedal 2 and is rotatably connected to a second support rod 7, the first support rod 6 is rotatably connected to the second support rod 7,
[0019] In this embodiment, when the scaffolding needs to be installed, the two support rods are first pulled outward, and the angle between the first pedal 1 and the second pedal 2 will increase. When the first pedal 1 and the second pedal 2 are both in a horizontal state, the baffle 4 will overlap the first groove 5, and the first pedal 1 and the second pedal 2 will not continue to fold downward. In addition, when the first pedal 1 and the second pedal 2 are both in a horizontal state, the first support rod 6 and the second support rod 7 will also be in a horizontal state to improve the stability of the scaffolding. When people need to recycle the scaffolding, the two support frames 3 are brought close to each other, and the first pedal 1 and the second pedal 2 and the first support rod 6 and the second support rod 7 are folded together, so that the scaffolding can be quickly recycled.
[0020] like Figure 1-3 As shown, the second support rod 7 is located at one end of the first support rod 6 and is fixedly connected to the first connecting block 8. The first support rod 6 is located at one end of the second support rod 7 and is provided with a second groove 9 that cooperates with the first connecting block 8. The first connecting block 8 is movably connected to the second groove 9. In this embodiment, when the first support rod 6 and the second support rod 7 are in a horizontal state, the first connecting block 8 will overlap with the second groove 9, and the first support rod 6 and the second support rod 7 will not continue to fold downward.
[0021] like Figure 1-3As shown, the first support rod 6 is located at both ends of the second groove 9 and is fixedly connected with the second connecting blocks 10 respectively. The first connecting block 8 and the second connecting block 10 are both provided with matching through holes 11, and a fixing pin 12 is movably inserted in the through hole 11. In this embodiment, when the first support rod 6 and the second support rod 7 are in a horizontal state, the through holes on the first connecting block 8 and the second connecting block 10 will be aligned. At this time, the fixing pin 12 is inserted into the through hole 11, so that the structure of the entire scaffolding will be very stable.
[0022] like Figure 1-3 As shown, a connecting rope 13 is provided at one end of the first support rod 6, and one end of the connecting rope 13 is fixedly connected to the fixing pin 12. In this embodiment, the fixing pin 12 is always connected to the first support rod 6 through the design of the connecting rope 13, so that the fixing pin 12 will not be lost.
[0023] like Figure 1 As shown, four fixing columns 14 are fixedly connected to the top of the support frame 3, and four sleeves 15 are fixedly connected to the bottom of the support frame 3. In this embodiment, when the construction height is high, multiple scaffolds can be installed on the scaffold. During operation, the sleeve 15 at the bottom of the scaffold to be installed is aligned with the supporting column at the top of the scaffold and installed, thereby increasing the height of the scaffold. In addition, through the design of the sleeve 15, people can install rollers at the bottom of the scaffold to facilitate the movement of the scaffold.
[0024] Working principle: during use, when the scaffolding needs to be installed, first pull the two support rods outward, then the angle between the first pedal 1 and the second pedal 2 will increase, and when the first pedal 1 and the second pedal 2 are both in a horizontal state, the baffle 4 will overlap into the first groove 5, and the first pedal 1 and the second pedal 2 will not continue to fold downward, and when the first pedal 1 and the second pedal 2 are both in a horizontal state, the first support rod 6 and the second support rod 7 will also be in a horizontal state, and the first connecting block 8 will overlap into the second groove 9, and the first support rod 6 and the second support rod 7 will not continue to fold downward, and at this time, the through holes provided on the first connecting block 8 and the second connecting block 10 will be aligned, and the first support rod 6 will be aligned. The fixing pin 12 connected by the connecting rope 13 at the end is inserted into the through hole 11, so that the structure of the whole scaffolding will be very stable. When the construction height is high, multiple scaffoldings can be installed on the scaffolding. During operation, the sleeve 15 at the bottom of the scaffolding to be installed is aligned with the supporting column at the top of the scaffolding and installed, so that the height of the scaffolding is increased. In addition, through the design of the sleeve 15, people can install rollers at the bottom of the scaffolding to facilitate the movement of the scaffolding. When people need to recycle the scaffolding, first remove the fixing pin 12 from the through hole 11, and then move the two support frames 3 close to each other, so that the first pedal 1 and the second pedal 2 and the first support rod 6 and the second support rod 7 are folded together, so that the scaffolding can be quickly recycled.
[0025] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes and modifications may be made to the embodiments without departing from the principles of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A scaffold for long-span structural construction, comprising a first pedal (1), a second pedal (2) and a support frame (3), characterized in that: One end of the first pedal (1) is rotatably connected to the second pedal (2); one end of the first pedal (1) and the second pedal (2) are both rotatably connected to a support frame (3); the first pedal (1) is provided with a baffle (4) at one end of the second pedal (2); the second pedal (2) is provided with a first groove (5) matching with the baffle (4) at one end of the first pedal (1); the support frame (3) is rotatably connected to a first support rod (6) located below the first pedal (1); the support frame (3) is rotatably connected to a second support rod (7) located below the second pedal (2); and the first support rod (6) is rotatably connected to the second support rod (7).
2. A scaffold for large-span structure construction according to claim 1, characterized in that: The second support rod (7) is located at one end of the first support rod (6) and is fixedly connected to a first connection block (8); the first support rod (6) is located at one end of the second support rod (7) and is provided with a second groove (9) that matches the first connection block (8); the first connection block (8) is movably connected to the second groove (9).
3. A scaffold for long-span structure construction according to claim 2, characterized in that: The first support rod (6) is located at both ends of the second groove (9) and is fixedly connected to second connection blocks (10), the first connection block (8) and the second connection block (10) are both provided with matching through holes (11), and a fixing pin (12) is movably inserted in the through hole (11).
4. A scaffold for long-span structure construction according to claim 3, characterized in that: A connecting rope (13) is provided at one end of the first support rod (6), and one end of the connecting rope (13) is fixedly connected to the fixing pin (12).
5. A scaffold for long-span structure construction according to claim 4, characterized in that: Four fixing columns (14) are fixedly connected to the top of the support frame (3), and four sleeves (15) are fixedly connected to the bottom of the support frame (3).