Temporary fixing device for vertical pump pipe of high-rise building
By setting up support frame vertical poles and transverse pull rod groups around the pump pipes of high-rise buildings, the construction quality problems caused by the collision between the pump pipe vibration and the floor slab are solved, and the stable fixation of the pump pipe and the protection of the floor slab are achieved.
Patent Information
- Application Number
- CN202421976629.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2025-05-06
- Estimated Expiration
- 2034-08-15
AI Technical Summary
During the concrete pumping process of high-rise buildings, the vibration of the pump pipe collided with the floor slab, which caused construction quality problems. The existing technology is difficult to effectively limit the vibration of the pump pipe and prevent floor slab damage.
A temporary fixing device for vertical pump pipes in high-rise buildings is designed. By setting up a support frame vertical rod around the pump pipe and setting up a transverse pull rod group on the support frame vertical rod, the lateral stiffness of the support frame vertical rod is enhanced, the vibration displacement of the pump pipe is restricted, and the floor slabs are prevented from colliding with the pump pipe.
It effectively enhances the fixity of the pump pipe, limits the vibration displacement of the pump pipe during the pouring process, prevents floor slabs from being damaged, and improves construction quality.
Smart Images

Figure CN222836407U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of construction, and in particular relates to a temporary fixing device for a vertical pump pipe of a high-rise building. Background Art
[0002] With the acceleration of my country's urbanization process, the amount of available construction land in cities is gradually decreasing. In order to make rational use of land resources, my country has vigorously promoted the construction of super high-rise buildings. Pumping concrete is widely used in the construction of high-rise and super high-rise buildings. During the process of pumping concrete, the vibration of the pump pipe passing through the floor slab will collide with the floor slab and cause damage to the floor slab. Therefore, effectively limiting the vibration of the pump pipe is an important measure to ensure the quality of the project. Therefore, how to solve the construction quality problem caused by the vibration of the pump pipe and the collision with the floor slab during the concrete pumping process is urgently needed. Utility Model Content
[0003] The utility model provides a temporary fixing device for vertical pump pipes in high-rise buildings, which can effectively solve the above problems.
[0004] The utility model is achieved in this way:
[0005] A temporary fixing device for vertical pump pipes in high-rise buildings, the fixing device is used between two adjacent upper and lower floor slabs, the upper floor slab and the lower floor slab are both provided with steel pads, the middle of the steel pads are penetrated by a circular hole, the pump pipe passes through the circular hole to connect the upper and lower floor slabs, the fixing device includes four groups of support frame uprights and a transverse tie rod group, the four groups of support frame uprights are vertically supported on the upper and lower groups of steel pads, and the four groups of support frame uprights are distributed in a rectangular shape around the pump pipe, and the transverse tie rod group is connected to the four groups of support frame uprights through vertical fasteners.
[0006] As a further improvement, the top internal threads of the four groups of support frame uprights are connected with telescopic rods.
[0007] As a further improvement, a channel steel is provided on the top of the telescopic rod, and the channel steel is adapted to the square steel pipe installed at the bottom of the upper floor.
[0008] As a further improvement, the transverse tie rod group includes a first transverse tie rod member arranged around the periphery of the four groups of support frame uprights and a second transverse tie rod member arranged on the left and right sides of the pump pipe.
[0009] As a further improvement, the front and rear ends of the second transverse tie rod are fixed to the first transverse tie rod by vertical fasteners.
[0010] As a further improvement, the outer side of the pump tube close to the second transverse tie rod is covered with a flexible material.
[0011] As a further improvement, a rubber strip is provided at the connection between the pump tube and the circular hole.
[0012] The beneficial effect of the utility model is that by arranging support frame uprights around the pump pipe and arranging a transverse tie rod group on the support frame uprights, the overall transverse stiffness of the support frame uprights is enhanced, and the pump pipe is limited at the same time, that is, the displacement of the pump pipe caused by vibration during the pouring process is limited, preventing the floor slab from colliding with the pump pipe and being damaged during the process of pumping concrete. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] In order to more clearly illustrate the technical solution of the implementation mode of the utility model, the drawings required for use in the implementation mode will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0014] Figure 1 It is a schematic diagram of the overall structure of a temporary fixing device for vertical pump pipes in high-rise buildings of the utility model;
[0015] Figure 2 The utility model is a front view structural schematic diagram of a temporary fixing device for a vertical pump pipe of a high-rise building.
[0016] Reference numerals:
[0017] 1-floor slab, 2-steel pad, 3-square steel pipe, 4-channel steel, 5-telescopic rod, 6-support frame upright, 7-pump pipe, 8-first transverse tie rod, 9-second transverse tie rod, 10-vertical fastener, 11-flexible material. DETAILED DESCRIPTION
[0018] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work belong to the scope of protection of the utility model. Therefore, the following detailed description of the embodiments of the utility model provided in the drawings is not intended to limit the scope of the utility model for which protection is sought, but merely represents the selected embodiments of the utility model. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work belong to the scope of protection of the utility model.
[0019] In the description of the present invention, the terms "upper", "lower", "above", "both ends" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0020] Reference Figure 1-2 As shown, this embodiment provides a temporary fixing device for vertical pump pipes in high-rise buildings, the fixing device is used between two adjacent upper and lower floor slabs 1, the upper floor slab 1 and the lower floor slab 1 are both provided with steel pads 2, a circular hole is penetrated through the middle of the steel pad 2, the pump pipe 7 passes through the circular hole to connect the upper and lower floor slabs 1, the fixing device includes four groups of support frame uprights 6 and a transverse tie rod group, the four groups of support frame uprights 6 are vertically supported on the upper and lower groups of steel pads 2, and the four groups of support frame uprights 6 are distributed in a rectangular shape around the pump pipe 7, and the transverse tie rod group is connected to the four groups of support frame uprights 6 through vertical fasteners 10.
[0021] By arranging support frame uprights 6 around the pump pipe 7 and arranging a transverse tie rod group on the support frame uprights 6, the overall transverse stiffness of the support frame uprights 6 is enhanced, and the pump pipe 7 is also limited at the same time, that is, the displacement of the pump pipe 7 due to vibration during the pouring process is limited, thereby preventing the floor 1 from colliding with the pump pipe 7 and being damaged during the process of pumping concrete.
[0022] Furthermore, the tops of the four groups of support frame uprights 6 are internally threadedly connected with telescopic rods 5 .
[0023] By arranging the telescopic rod 5 on the top of the support frame upright 6, the height of the support frame upright 6 can be adjusted between floors of different heights, thereby enhancing the overall applicability of the fixing device.
[0024] Furthermore, a channel steel 4 is provided on the top of the telescopic rod 5 , and the channel steel 4 is adapted to the square steel pipe 3 installed at the bottom of the upper floor slab 1 .
[0025] By arranging the channel steel 4 on the top of the telescopic rod 5, that is, supporting the square steel pipe 3 arranged at the bottom of the floor 1 through the channel steel 4, the bearing force of the floor 1 can be better transferred to the support frame uprights 6, thereby achieving the effect of dispersing the load.
[0026] Furthermore, the transverse tie rod group includes a first transverse tie rod member 8 arranged around the periphery of the four groups of support frame uprights 6 and a second transverse tie rod member 9 arranged on the left and right sides of the pump pipe 7 .
[0027] The overall rigidity of the fixing device is enhanced by providing a transverse tie rod group, and the second transverse tie rod member 9 is used to clamp the left and right sides of the pump pipe 7, thereby restricting the displacement of the pump pipe 7 when pumping concrete.
[0028] Furthermore, the front and rear ends of the second transverse tie rod 9 are fixed to the first transverse tie rod 8 via vertical fasteners 10 .
[0029] Furthermore, the outer side of the pump tube 7 close to the second transverse tie rod 9 is covered with a flexible material 11 .
[0030] By covering the contact position between the pump tube 7 and the second transverse tie rod 9 with a flexible material 11, the pump tube 7 and the second transverse tie rod 9 are prevented from wearing each other, wherein the flexible material 11 may be a rubber ring.
[0031] Furthermore, a rubber strip is provided at the connection between the pump tube 7 and the circular hole.
[0032] By providing a rubber strip at the connection between the pump tube 7 and the circular hole, the airtightness of the connection between the pump tube 7 and the circular hole can be improved, and the friction between the pump tube 7 and the circular hole can be enhanced, thereby preventing the pump tube 7 from shaking between the circular holes.
[0033] The above description is only the preferred implementation of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A temporary fixing device for vertical pump pipes in high-rise buildings, characterized in that: The fixing device is used between two adjacent upper and lower floor slabs. The upper floor slab and the lower floor slab are both provided with steel pads. A circular hole is opened through the middle of the steel pads. The pump pipe passes through the circular hole to connect the upper and lower floor slabs. The fixing device includes four groups of support frame uprights and a transverse tie rod group. The four groups of support frame uprights are vertically supported on the upper and lower groups of steel pads, and the four groups of support frame uprights are distributed in a rectangular shape around the pump pipe. The transverse tie rod group is connected to the four groups of support frame uprights through vertical fasteners.
2. The temporary fixing device for vertical pump pipes in high-rise buildings according to claim 1 is characterized in that: The tops of the four groups of support frame uprights are internally threadedly connected with telescopic rods.
3. The temporary fixing device for vertical pump pipes in high-rise buildings according to claim 2 is characterized in that: A channel steel is arranged on the top of the telescopic rod, and the channel steel is adapted to the square steel pipe installed at the bottom of the floor slab on the upper layer.
4. The temporary fixing device for vertical pump pipes in high-rise buildings according to claim 1 is characterized in that: The transverse tie rod group includes a first transverse tie rod member arranged around the periphery of the four groups of support frame uprights and a second transverse tie rod member arranged on the left and right sides of the pump pipe.
5. The temporary fixing device for vertical pump pipes in high-rise buildings according to claim 4 is characterized in that: The front and rear ends of the second transverse tie rod are fixed to the first transverse tie rod by vertical fasteners.
6. The temporary fixing device for vertical pump pipes in high-rise buildings according to claim 4 is characterized in that: The outer side of the pump tube close to the second transverse tie rod is covered with a flexible material.
7. The temporary fixing device for vertical pump pipes in high-rise buildings according to claim 1 is characterized in that: A rubber strip is arranged at the connection between the pump tube and the circular hole.