Simple and convenient construction protection device

By designing a simple construction protection device for bridge baffle construction, the problem of workers lacking protection when vibrating concrete is solved, and the effect of improving construction safety is achieved.

CN222847216UActive Publication Date: 2025-05-09CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421859652.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2025-05-09
Estimated Expiration
2034-08-02

AI Technical Summary

Technical Problem

During the construction of bridge baffle, workers lack effective protective measures when vibrating concrete, resulting in greater safety hazards.

Method used

A simple construction protection device is designed, including multiple sleeves, connecting rods, connecting members and tie ropes. Through the combination of these components, a safe and effective protection system and tie point for seat belts is formed.

Benefits of technology

By providing fixed points and seat belt mount points, the device significantly reduces safety hazards during construction, shortens the protection and installation time, and improves the safety of workers' operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222847216U_ABST
    Figure CN222847216U_ABST
Patent Text Reader

Abstract

The utility model relates to a simple and convenient construction protection device, which relates to the technical field of bridge structures, is used for protecting a bridge steel template, and comprises a plurality of sleeves vertically connected to the steel template, connecting rods inserted into the sleeves, and a plurality of connecting rods inserted into the connecting rods, the at least one connecting component vertically connected to the connecting rod is inserted into the steel sleeve through the steel pipe, so that the structure is convenient to install, carry and transport, and is suitable for the cast-in-place beam baffle which is constructed by using a steel formwork; in order to solve the problems of lack of protection measures, nowhere to pull a lifeline and incapability of meeting the standard requirements in the prior art, the hanging wire rope and the connecting component can be repeatedly used, and a safe and effective protection system and a safety belt hanging point can be formed, so that potential safety hazards in the construction process are greatly reduced, meanwhile, the protection building time is shortened, and the construction efficiency is improved. The device has the characteristics of convenience in assembly and disassembly, wide application range and convenience in turnover.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of bridge structures, in particular to a simple construction protection device. Background Art

[0002] At present, in elevated railway bridge projects, most bridge structures are cast-in-place concrete structures. It is difficult to cast the bridge baffle and the bridge body at one time. They need to be cast separately. The bridge baffle construction is carried out after the bridge body construction is completed. During the pouring of the bridge baffle concrete, the concrete in the steel formwork needs to be vibrated. However, during the pouring of the baffle, there are protection measures missing, lifelines have nowhere to be laid or they are not in compliance with the specifications, resulting in the workers being unable to be protected during the concrete vibrating process, which poses a major safety hazard. Therefore, measures need to be provided to solve the problem that workers cannot be protected during the concrete vibrating process. Utility Model Content

[0003] The utility model aims to overcome the defects of the prior art, provide a simple construction protection device, and solve the problem that the existing workers cannot be protected during the concrete vibrating process, which poses a major safety hazard.

[0004] The technical solution to achieve the above purpose is: a simple construction protection device for protecting bridge steel formwork, the protection device comprising:

[0005] A plurality of sleeves vertically connected to the steel formwork, the sleeves being arranged at intervals along the setting direction of the steel formwork;

[0006] A connecting rod plugged into the sleeve;

[0007] at least one connecting member vertically connected to the connecting rod;

[0008] A hooking wire rope connected to the connecting member.

[0009] The technical solution of the utility model is further improved in that: a plurality of clamping columns are connected to the connecting rod.

[0010] The technical solution of the utility model is further improved in that: the height of the clamping column on the connecting rod is equal to the length of the sleeve body.

[0011] The technical solution of the utility model is further improved in that: the sleeve is cylindrical.

[0012] The technical solution of the utility model is further improved in that: the connecting rod is in the shape of a round rod that is matched with the diameter of the sleeve.

[0013] A further improvement of the technical solution of the utility model is that the connecting member is arranged in a "X" shape.

[0014] The technical solution of the utility model is further improved in that: the connecting rod is connected to two connecting components, and the hanging wire ropes are also provided with two.

[0015] The technical solution of the utility model is further improved in that: the hanging wire rope is set by a steel wire rope.

[0016] The technical solution of the utility model is further improved in that: the steel template is surrounded by a circle, the hanging wire rope passes through the corresponding connecting member and is arranged in a ring shape, and the two ends of the hanging wire rope are butt-connected.

[0017] The technical solution of the utility model is further improved in that: the sleeve is made of steel.

[0018] By using the above technical solution, the utility model has the following technical effects compared with the prior art:

[0019] The utility model provides a simple construction protection device, which is inserted into a steel sleeve by a steel pipe, so that the structure is easy to install and carry and transport. It is suitable for cast-in-place beam baffles constructed using steel formwork, and solves the problems of lack of protection measures, nowhere to lay lifelines and laying that does not meet the requirements of specifications during the construction of cast-in-place beam baffles.

[0020] The hanging wire rope and connecting components can be reused to form a safe and effective protection system and a safety belt hanging point, which greatly reduces the potential safety hazards in the construction process and shortens the time for setting up protection. It is easy to install and disassemble, has a wide range of applications, and is easy to turn around.

[0021] By providing the clamping column, the connecting rod inserted in the sleeve can be further restricted, so that the connecting rod is placed therein more stably.

[0022] The connecting member is arranged in a "J" shape to expand the welding range with the surface of the connecting rod, so that the connecting member is more firmly connected to the surface of the connecting rod. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a front view of a simple construction protection device of the utility model.

[0024] Figure 2 It is a right view of a simple construction protection device of the utility model.

[0025] Figure 3 The utility model is a top view of a simple construction protection device.

[0026] In the figure: 1. connecting rod; 2. sleeve; 3. clamping column; 4. connecting component; 5. hanging wire rope. DETAILED DESCRIPTION

[0027] The utility model is further described below in conjunction with the accompanying drawings and specific embodiments.

[0028] The utility model provides a simple construction protection device, which can be repeatedly used by tying a wire rope and a connecting member, and can form a safe and effective protection system and a safety belt tying point, which greatly reduces the safety hazards in the construction process. The simple construction protection device is described below.

[0029] See also Figure 1 , showing the front view of a simple construction protection device of the utility model. Figure 2 , showing the right side view of a simple construction protection device of the utility model. Figure 3 , showing a top view of a simple construction protection device of the utility model. Figures 1 to 3 , the structure of the construction protection device of the utility model is explained.

[0030] See also Figures 1 to 3 The utility model provides a simple construction protection device for bridge baffle protection, the protection device includes: a connecting rod 1, a sleeve 2, a connecting member 4, and a hanging wire rope 5. A plurality of sleeves 2 are vertically connected to the steel formwork, the sleeves 2 are spaced apart along the setting direction of the steel formwork, the connecting rod 1 is plugged into the sleeve 2, at least one connecting member 4 is vertically connected to the connecting rod 1, and the hanging wire rope 5 is connected to the connecting member 4.

[0031] Preferably, the connecting rod 1 is vertically mounted on the sleeve 2 so that the mooring wire rope 5 on the connecting member 4 can be looped around a plurality of connecting rods 1 .

[0032] In a specific implementation of the utility model, a plurality of clamping columns 3 are connected to the connecting rod 1 .

[0033] In a specific implementation of the present utility model, the height of the clamping column 3 on the connecting rod 1 is equal to the length of the sleeve 2 .

[0034] Furthermore, by providing the clamping column 3, the connecting rod 1 inserted in the sleeve 2 can be further restricted, so that the connecting rod 1 is placed therein more stably.

[0035] Furthermore, by inserting the connecting rod 1 into the sleeve 2, the two can be easily assembled and the time required for erection before construction is short.

[0036] In a specific implementation of the present invention, the sleeve 2 is cylindrical.

[0037] In a specific implementation of the present invention, the connecting rod 1 is in the shape of a round rod that matches the diameter of the sleeve 2 .

[0038] Furthermore, by setting the shape of the connecting rod 1 to match the diameter of the sleeve 2, it is more convenient to insert the connecting rod 1 into the sleeve 2.

[0039] In a specific implementation of the present utility model, the connecting member 4 is arranged in a cross shape.

[0040] Furthermore, the connection member 4 arranged in a cross shape can expand the welding range with the surface of the connecting rod 1, so that the connection member 4 is more firmly connected to the surface of the connecting rod 1.

[0041] In a specific implementation of the present utility model, two connecting members 4 are connected to the connecting rod 1, and two hanging wire ropes 5 are also provided.

[0042] Furthermore, the hanging wire rope 5 and the connecting member 4 can be repeatedly used, which is convenient for disassembly and has low cost.

[0043] In a specific implementation of the present invention, the hanging wire rope 5 is provided by a steel wire rope.

[0044] Furthermore, the provision of the hanging wire rope 5 can serve as a hanging point for the workers' safety belts, greatly reducing the potential safety hazards during the construction process and ensuring the personal safety of the workers.

[0045] In a specific implementation of the present invention, the steel template is surrounded by a circle, and the hanging wire rope 5 passes through the corresponding connecting member 4 to form a ring-shaped arrangement, and the two ends of the hanging wire rope 5 are butt-connected.

[0046] Furthermore, by connecting the rope ends at both ends of the hanging wire rope 5 to each other after the hanging wire rope 5 is looped around once, the entire hanging wire rope 5 can be tightened.

[0047] In a specific implementation of the present utility model, the sleeve 2 is made of steel.

[0048] Furthermore, the steel sleeve 2 has a longer service life and thus lower use cost.

[0049] like Figures 1 to 3 As shown, the installation process of a simple construction protection device of the utility model is described below.

[0050] First, the sleeve 2 is welded to the baffle, and then the connecting rod 1 is inserted into the sleeve 2 to support the connecting rod 1, and then the connecting component 4 is welded to the connecting rod 1 to fix it, and finally the hanging wire rope 5 is passed through the connecting component 4, and after the hanging wire rope 5 is wrapped around the connecting rod 1 for one circle, the rope ends at both ends of the hanging wire rope 5 are connected together, so that the hanging wire rope 5 can be used as a hanging point for the workers' safety belts, so that the whole forms a safe and effective protection system.

[0051] The beneficial effects of the simple construction protection device of the utility model are:

[0052] 1. During the construction process, the sleeve can be fixed on the outside of the steel formwork in advance to provide a fixed point for the lifeline and a hanging point for the safety belt. It is easy to use, efficient to install and disassemble, and provides reliable protection measures for the pouring and vibration of the baffle, which improves the safety of workers' operations. It is convenient to transport, has a wide range of applications, is easy to turn around, and is economical and practical.

[0053] 2. The hanging wire rope and connecting components can be reused to form a safe and effective protection system and a safety belt hanging point, which greatly reduces the potential safety hazards during the construction process and shortens the protection erection time. It is easy to install and dismantle, has a wide range of applications, and is easy to turn around.

[0054] The utility model is described in detail above in conjunction with the embodiments of the drawings. A person skilled in the art can make various variations of the utility model according to the above description. Therefore, some details in the embodiments should not constitute a limitation of the utility model, and the scope of protection of the utility model shall be defined by the scope of the attached claims.

Claims

1. A simple construction protection device for bridge steel formwork protection, characterized by: The protective device comprises: A plurality of sleeves (2) vertically connected to the steel template, wherein the sleeves (2) are arranged at intervals along the setting direction of the steel template; A connecting rod (1) plugged into the sleeve (2); At least one connecting member (4) vertically connected to the connecting rod (1); A hanging wire rope (5) connected to the connecting member (4).

2. A simple construction protection device according to claim 1, characterized in that: A plurality of clamping columns (3) are connected to the connecting rod (1).

3. A simple construction protection device according to claim 2, characterized in that: The height of the clamping column (3) on the connecting rod (1) is equal to the length of the sleeve (2).

4. A simple construction protection device according to claim 1, characterized in that: The sleeve (2) is cylindrical.

5. A simple construction protection device according to claim 1, characterized in that: The connecting rod (1) is in the shape of a round rod that matches the caliber of the sleeve (2).

6. A simple construction protection device according to claim 1, characterized in that: The connecting member (4) is arranged in a "X" shape.

7. A simple construction protection device according to claim 2, characterized in that: The connecting rod (1) is connected to two connecting components (4), and the hanging wire ropes (5) are also provided with two.

8. A simple construction protection device according to claim 1, characterized in that: The hanging wire rope (5) is provided by a steel wire rope.

9. A simple construction protection device according to claim 1, characterized in that: The steel template is surrounded by a circle, and the hanging wire rope (5) passes through the corresponding connecting member (4) to be arranged in a ring shape, and the two ends of the hanging wire rope (5) are butt-connected.

10. A simple construction protection device according to claim 1, characterized in that: The sleeve (2) is made of steel.