Prefabricated vertical shaft pipe piece ring

By adopting prefabricated vertical shaft shaft pipe sheet rings and using a combination structure of steel plate cylinders, flange rings, concrete and anchors, the problems of excessive wall thickness, large construction project volume and poor water insulation in the prior art are solved, and the effects of thinner walls, high strength, good water insulation and convenient installation are achieved.

CN222863394UActive Publication Date: 2025-05-13TIANHE MECHANICAL EQUIP MFG
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420844519.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-23
Publication Date
2025-05-13
Estimated Expiration
2034-04-23

AI Technical Summary

Technical Problem

Due to the low compressive strength of concrete, the existing shaft shaft shaft pipe segment ring needs to increase the wall thickness to meet the strength requirements, resulting in an increase in the excavation diameter of the shaft, a large construction project volume, and weak water barrier on the inner and outer walls, making it inconvenient to install accessories.

Method used

Prefabricated shaft shaft pipe sheet rings are used, including steel plate cylinders, flange rings, concrete and anchors. The steel plate cylinder is welded by multi-layer arc steel pipe sheets. The flange ring connects the top and bottom ends of the steel plate cylinder. The concrete is poured into the cavity of the flange ring and the steel plate cylinder. The anchor card is used to anchor the concrete to enhance the overall strength.

Benefits of technology

Under the same strength, the wall thickness is thinner, which reduces the impact on the excavation diameter of the shaft and does not increase the construction project volume. The inner and outer walls of the wellbore are steel plates, which have better water insulation. It can be welded directly when installing accessories, which is more convenient.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222863394U_ABST
    Figure CN222863394U_ABST
Patent Text Reader

Abstract

The utility model provides a prefabricated vertical shaft pipe piece ring which comprises a steel plate cylinder, a flange ring, concrete and an anchor clamp. The concrete is poured in a cavity defined by the lower end face of an upper flange ring and the upper end face of a lower flange ring of the flange ring and the outer wall face of a steel plate inner cylinder and the inner wall face of a steel plate outer cylinder of the steel plate cylinder. The projection of the anchor clamps in the vertical direction is in a U shape, the free ends of the anchor clamps are connected to the outer wall face of the steel plate inner cylinder or the inner wall face of the steel plate outer cylinder, the multiple anchor clamps are evenly distributed around the axis of the steel plate cylinder and divided into multiple layers from bottom to top, and the anchor clamps of the adjacent layers are distributed in a staggered mode and can be matched with the anchor clamps to anchor concrete. The integral strength is improved, the wall thickness of the prefabricated vertical shaft segment ring is thinner under the same strength, the influence on the vertical shaft excavation diameter is reduced, the work amount of vertical shaft construction is not increased, after a shaft is manufactured, the inner wall face and the outer wall face of the shaft are steel plates, the waterproof performance is relatively better, and when accessories are installed in the shaft, direct welding connection can be achieved, and more convenience is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of vertical shaft construction, in particular to a prefabricated vertical shaft shaft segment ring. Background Art

[0002] Vertical shafts are widely used in the ventilation of underground pipelines in the fields of coal, subway, etc. and for the entry and exit of personnel and materials. After the vertical shaft is completed, it is necessary to use concrete, brickwork and other methods to make the shaft to prevent the shaft wall from collapsing. In order to improve construction efficiency, most of the existing shafts are made of prefabricated pipe rings. Traditional pipe rings are mostly made of reinforced cages cast in concrete, and the compressive strength of concrete is relatively low, so the wall thickness can only be increased to meet the strength requirements of the shaft. Under the same inner diameter, the outer diameter of the thick-walled pipe ring is larger, so the excavation diameter of the vertical shaft needs to be increased, which will greatly increase the engineering workload of the vertical shaft construction. At the same time, after the shaft is made, the inner and outer walls are both concrete surfaces, and the water-proofing property is relatively weak. When installing other accessories on the inner wall, it is necessary to drill holes and anchor them, which is not convenient. Utility Model Content

[0003] The purpose of the utility model is to overcome one or more disadvantages in the prior art and to provide a prefabricated vertical shaft segment ring.

[0004] In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model is that the prefabricated vertical shaft segment ring comprises:

[0005] A steel plate cylinder, wherein the steel plate cylinder is welded by multiple layers of arc-shaped steel pipe segments, and the weld seams of adjacent layers of arc-shaped steel pipe segments are arranged in a staggered manner. The steel plate cylinder comprises a steel plate inner cylinder and a steel plate outer cylinder arranged coaxially with the steel plate inner cylinder;

[0006] Flange ring, the flange ring comprises an upper flange ring connected to the top of the steel plate inner cylinder and the steel plate outer cylinder and a lower flange ring connected to the bottom of the steel plate inner cylinder and the steel plate outer cylinder, the inner wall surface of the upper flange ring and the lower flange ring is flush with the inner wall surface of the steel plate inner cylinder, and the outer wall surface of the upper flange ring and the lower flange ring is flush with the outer wall surface of the steel plate outer cylinder;

[0007] Concrete, the concrete is poured into a cavity surrounded by the lower end surface of the upper flange ring, the upper end surface of the lower flange ring, the outer wall surface of the steel plate inner cylinder and the inner wall surface of the steel plate outer cylinder;

[0008] Anchor cards are arranged in the cavity for anchoring the concrete, the projection of the anchor cards in the up and down directions is U-shaped, the free end of the anchor cards is connected to the outer wall surface of the inner cylinder of the steel plate or the inner wall surface of the outer cylinder of the steel plate, there are multiple anchor cards, the multiple anchor cards are evenly distributed around the axis of the steel plate cylinder and are divided into multiple layers from bottom to top, and the anchor cards of adjacent layers are staggered.

[0009] Preferably, the upper flange ring is provided with a plurality of long strip-shaped pouring openings, and the plurality of pouring openings are evenly distributed along the axis of the upper flange ring.

[0010] Further preferably, the prefabricated vertical shaft segment ring also includes a hook, the lower end of the hook extends into the cavity and is inserted into the concrete, the lower end of the hook is connected to the outer wall surface of the steel plate inner cylinder and / or the inner wall surface of the steel plate outer cylinder through a hook support plate, and the upper end of the hook passes through the upper flange ring and extends upward.

[0011] Further preferably, the hook is in an inverted U shape, the free end of the hook is located at its lower end, and the plane where the hook is located passes through the axis line of the inner cylinder of the steel plate or the outer cylinder of the steel plate.

[0012] Further preferably, the upper flange ring is provided with a hook hole for the upper end of the hook to pass upwardly, there are a plurality of the hook holes which are evenly distributed around the axis of the upper flange ring, and the hook holes are staggered with the casting port.

[0013] Further preferably, the prefabricated vertical shaft segment ring also includes an inter-section grouting pipe, which is located in the cavity and inclined downward and inward, the upper end of the inter-section grouting pipe passes through the outer wall surface of the steel plate outer cylinder, and the lower end of the inter-section grouting pipe passes through the lower surface of the lower flange ring, there are multiple inter-section grouting pipes and they are evenly distributed around the axial line of the lower flange ring, and when two adjacent sections of the prefabricated vertical shaft segment rings are butt-jointed, the lower opening of the inter-section grouting pipe of the prefabricated vertical shaft segment ring located above is aligned with the pouring port of the prefabricated vertical shaft segment ring located above.

[0014] Preferably, the upper flange ring is provided with upper flange bolt connection holes, and there are multiple upper flange connection bolt holes, which are divided into an inner group of upper flange connection bolt holes close to the inner wall surface of the upper flange ring and an outer group of upper flange connection bolt holes close to the outer wall surface of the upper flange ring. The multiple upper flange bolt connection holes in the inner group of upper flange connection bolt holes are evenly distributed along the axis of the upper flange ring, and the multiple upper flange bolt connection holes in the outer group of upper flange connection bolt holes are evenly distributed along the axis of the upper flange ring.

[0015] Further preferably, upper flange bolt mounting holes corresponding to the upper flange bolt connection holes are opened on the steel plate inner cylinder and the steel plate outer cylinder, and the upper surface of the concrete after pouring is lower than the lower edge of the upper flange bolt mounting holes.

[0016] Preferably, the lower flange ring is provided with lower flange bolt connection holes, and the lower flange connection bolt holes have multiple parts and are divided into an inner group of lower flange connection bolt holes close to the inner wall surface of the lower flange ring and an outer group of lower flange connection bolt holes close to the outer wall surface of the lower flange ring. The multiple lower flange bolt connection holes in the inner group of lower flange connection bolt holes are evenly distributed along the axis of the lower flange ring, and the multiple lower flange bolt connection holes in the outer group of lower flange connection bolt holes are evenly distributed along the axis of the lower flange ring.

[0017] Further preferably, lower flange bolt mounting holes corresponding to the lower flange bolt connecting holes are opened on the steel plate inner cylinder and the steel plate outer cylinder, and when the concrete is poured, rubber plugs are plugged in the lower flange bolt mounting holes so that after the concrete is poured, the lower flange bolt connecting holes remain connected to the lower flange bolt mounting holes.

[0018] Due to the application of the above technical solution, the utility model has the following advantages compared with the prior art:

[0019] The prefabricated vertical shaft segment ring provided by the utility model comprises a steel plate cylinder, a flange ring, concrete and an anchor clip. By pouring concrete into a cavity surrounded by the lower end face of the upper flange ring of the flange ring, the upper end face of the lower flange ring and the outer wall surface of the steel plate inner cylinder and the inner wall surface of the steel plate outer cylinder of the steel plate cylinder, the projection of the anchor clip in the up and down directions is U-shaped, the free end of the anchor clip is connected to the outer wall surface of the steel plate inner cylinder or the inner wall surface of the steel plate outer cylinder, the anchor clip is provided with multiple and evenly distributed around the axis line of the steel plate cylinder and is divided into multiple layers from bottom to top, the anchor clips of adjacent layers are staggered and can cooperate with the anchor clips to anchor concrete, thereby improving the overall strength, so that the wall thickness of the prefabricated vertical shaft segment ring is thinner at the same strength, reducing the influence on the shaft excavation diameter, and not increasing the engineering workload of the shaft construction. After the shaft is manufactured, the inner and outer wall surfaces are both steel plates, and the water-proof property is relatively better. When installing accessories in the shaft, they can be directly welded and connected, which is more convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a front view schematic diagram of a preferred embodiment of the utility model.

[0021] Figure 2 yes Figure 1 Schematic top view of .

[0022] Figure 3 , Figure 4 yes Figure 1 A three-dimensional schematic diagram of .

[0023] Figure 5 yes Figure 3 Schematic diagram after hiding some curved steel pipe segments and concrete.

[0024] Figure 6 yes Figure 2 Schematic cross-sectional view along the AA direction.

[0025] Figure 7 It is a schematic diagram of the preferred embodiment of the utility model when it is assembled into a wellbore.

[0026] Figure 8 yes Figure 7 Schematic diagram of the pressure on the side wall of the wellbore.

[0027] Among them: 1. Vertical shaft; 2. Wellhead pad; 3. Guide block; 4. Lifting wire rope; 11. Arc steel pipe segment; 12. Splicing weld; 13. Inner cylinder of steel plate; 14. Outer cylinder of steel plate; 15. Upper flange bolt mounting hole; 16. Lower flange bolt mounting hole; 21. Upper flange ring; 211. Casting port; 212. Hook hole; 213. Upper flange bolt connection hole; 214. Inner group of upper flange connection bolt holes; 215. Outer group of upper flange connection bolt holes; 22. Lower flange ring; 221. Lower flange bolt connection hole; 222. Inner group of lower flange connection bolt holes; 223. Outer group of lower flange connection bolt holes; 30. Concrete; 40. Anchor card; 50. Hook; 51. Hook support plate; 60. Inter-section grouting pipe; 61. Inter-section grouting pipe cover plate. DETAILED DESCRIPTION

[0028] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings so that the advantages and features of the present invention can be more easily understood by those skilled in the art.

[0029] like Figures 1 to 8As shown, the prefabricated vertical shaft segment ring provided by the utility model comprises: a steel plate cylinder, a flange ring, concrete 30, and an anchor card 40, wherein the steel plate cylinder is welded by multiple layers of arc-shaped steel segments 11, and the weld seams 12 of adjacent layers of arc-shaped steel segments 11 are arranged alternately, and the steel plate cylinder comprises a steel plate inner cylinder 13 and a steel plate outer cylinder 14 coaxially arranged with the steel plate inner cylinder 13; the flange ring comprises an upper flange ring 21 connected to the top ends of the steel plate inner cylinder 13 and the steel plate outer cylinder 14, and a lower flange ring 22 connected to the bottom ends of the steel plate inner cylinder 13 and the steel plate outer cylinder 14, and the inner wall surfaces of the upper flange ring 21 and the lower flange ring 22 are aligned with the inner wall surfaces of the steel plate inner cylinder 13 The inner wall surfaces are flush with each other, and the outer wall surfaces of the upper flange ring 21 and the lower flange ring 22 are flush with the outer wall surface of the steel plate outer cylinder 14; the concrete 30 is poured in the cavity surrounded by the lower end surface of the upper flange ring 21, the upper end surface of the lower flange ring 22, the outer wall surface of the steel plate inner cylinder 13 and the inner wall surface of the steel plate outer cylinder 14; the anchor card 40 is arranged in the cavity for anchoring the concrete 30, and the projection of the anchor card 40 in the up and down directions is U-shaped, and the free end of the anchor card 40 is welded and connected to the outer wall surface of the steel plate inner cylinder 13. There are multiple anchor cards 40, and the multiple anchor cards 40 are evenly distributed around the axis of the steel plate inner cylinder 13 and are divided into multiple layers from bottom to top, and the anchor cards 40 of adjacent layers are staggered.

[0030] The advantage of this arrangement is that it can improve the overall strength, making the wall thickness of the prefabricated shaft segment ring thinner at the same strength, thereby reducing the impact on the shaft excavation diameter without increasing the amount of work required for shaft construction. After the shaft is manufactured, its inner and outer walls are both steel plates with relatively better water-proof properties. When installing accessories in the shaft, they can be directly welded and connected without the need for drilling and anchoring operations, which is more convenient.

[0031] To facilitate the pouring of the concrete 30 , in this embodiment, a plurality of long strip-shaped pouring openings 211 are provided on the upper flange ring 21 , and the plurality of pouring openings 211 are evenly distributed along the axis of the upper flange ring 21 .

[0032] In order to facilitate the connection of two adjacent sections of prefabricated vertical shaft segment rings and improve the connection firmness, in this embodiment, an upper flange bolt connection hole 213 is opened on the upper flange ring 21, and the upper flange connection bolt hole 213 has multiple and is divided into an upper flange connection bolt hole inner group 214 close to the inner wall surface of the upper flange ring 21 and an upper flange connection bolt hole outer group 215 close to the outer wall surface of the upper flange ring 21. The multiple upper flange bolt connection holes 213 of the upper flange connection bolt hole inner group 214 are evenly distributed along the axis of the upper flange ring 21, and the multiple upper flange bolt connection holes 213 of the upper flange connection bolt hole outer group 215 are evenly distributed along the axis of the upper flange ring 21; the lower flange ring 22 is opened with a lower flange bolt connection hole 221, and the lower flange connection bolt hole 221 has multiple and is divided into an upper flange connection bolt hole inner group 214 close to the inner wall surface of the upper flange ring 21. The inner group 222 of the lower flange connection bolt holes on the inner wall surface of the lower flange ring 22 and the outer group 223 of the lower flange connection bolt holes close to the outer wall surface of the lower flange ring 22, the multiple lower flange bolt connection holes 221 of the inner group 222 of the lower flange connection bolt holes are evenly distributed along the axis of the lower flange ring 22, and the multiple lower flange bolt connection holes 221 of the outer group 223 of the lower flange connection bolt holes are evenly distributed along the axis of the lower flange ring 22; when two adjacent sections of prefabricated vertical shaft segment rings are aligned, the upper flange bolt connection holes 213 of the prefabricated vertical shaft segment ring located at the bottom correspond to the lower flange bolt connection holes 221 of the prefabricated vertical shaft segment ring located at the top, and the connection can be conveniently achieved by inserting connecting bolts in the upper flange bolt connection holes 213 and the lower flange bolt connection holes 221.

[0033] To facilitate the locking of the connecting bolts, upper flange bolt mounting holes 15 corresponding to the upper flange bolt connecting holes 213 are further provided on the steel plate inner cylinder 13 and the steel plate outer cylinder 14. The upper surface of the concrete 30 after pouring is lower than the lower edge of the upper flange bolt mounting holes 15. At the same time, lower flange bolt mounting holes 16 corresponding to the lower flange bolt connecting holes 221 are also provided on the steel plate inner cylinder 13 and the steel plate outer cylinder 14. When the concrete 30 is poured, the lower flange bolt mounting holes 16 are plugged with rubber plugs, so that after the concrete 30 is poured, the lower flange bolt connecting holes 221 and the lower flange bolt mounting holes 16 remain connected.

[0034] In order to fill the gap between the upper surface of concrete 30 and the lower surface of the upper flange ring 21 to ensure strength after the two adjacent prefabricated vertical shaft segment rings are connected, in this embodiment, the prefabricated vertical shaft segment ring also includes an inter-segment grouting pipe 60, which is located in the cavity and is inclined downward and inward. The upper end of the inter-segment grouting pipe 60 passes through the outer wall of the steel plate outer cylinder 14, and the lower end of the inter-segment grouting pipe 60 passes through the lower surface of the lower flange ring 22. There are multiple inter-segment grouting pipes 60 and they are evenly distributed around the axial line of the lower flange ring 22. When the two adjacent prefabricated vertical shaft segment rings are butt-jointed, the lower opening of the inter-segment grouting pipe 60 of the upper prefabricated vertical shaft segment ring is aligned with the pouring port 211 of the upper prefabricated vertical shaft segment ring. To facilitate the inter-segment grouting pipe 60 It is further configured that the upper end of the inter-section grouting pipe 60 is connected with an inter-section grouting pipe cover 61, and an opening is provided on the steel plate outer cylinder 14 for facilitating the insertion of the inter-section grouting pipe 60. After insertion, the inter-section grouting pipe cover 61 covers the opening and is welded to the outer wall of the steel plate outer cylinder 14, and a circular hole is provided on the lower flange ring 22 for facilitating the exposure of the lower opening of the inter-section grouting pipe cover 61. When pouring concrete 30, a rubber ring is inserted into the circular hole and the inter-section grouting pipe cover 61 for sealing. After the connection between the two adjacent sections of the prefabricated vertical shaft segment rings is completed, it is only necessary to cut the inter-section grouting pipe cover 61, and grouting can be injected into the prefabricated vertical shaft segment ring located below through the inter-section grouting pipe 60, thereby filling the gap between the upper surface of the internal concrete 30 and the lower surface of the upper flange ring 21 to ensure strength.

[0035] To facilitate lifting, the prefabricated vertical shaft segment ring also includes a hook 50, the lower end of the hook 50 extends into the cavity and is inserted into the concrete 30, the lower end of the hook 50 is connected to the outer wall surface of the steel plate inner cylinder 13 through a hook support plate 51, and the upper end of the hook 50 passes through the upper flange ring 21 and extends upward. Specifically, the hook 50 is in an inverted U shape, the free end of the hook 50 is located at its lower end, and the plane where the hook 50 is located passes through the axis of the steel plate inner cylinder 13. Furthermore, a hook hole 212 for the upper end of the hook 50 to pass upward is provided on the upper flange ring 21. There are multiple hook holes 212 and they are evenly distributed around the axis of the upper flange ring 21, and the hook holes 212 and the casting ports 211 are staggered.

[0036] The above embodiments are only for illustrating the technical concept and features of the utility model, and their purpose is to enable people familiar with this technology to understand the content of the utility model and implement it accordingly. They cannot be used to limit the protection scope of the utility model. All equivalent changes or modifications made according to the spirit of the utility model should be included in the protection scope of the utility model.

Claims

1. A prefabricated vertical shaft segment ring, characterized in that: include: A steel plate cylinder, wherein the steel plate cylinder is welded by multiple layers of arc-shaped steel pipe segments, and the weld seams of adjacent layers of arc-shaped steel pipe segments are arranged in a staggered manner. The steel plate cylinder comprises a steel plate inner cylinder and a steel plate outer cylinder arranged coaxially with the steel plate inner cylinder; Flange ring, the flange ring comprises an upper flange ring connected to the top of the steel plate inner cylinder and the steel plate outer cylinder and a lower flange ring connected to the bottom of the steel plate inner cylinder and the steel plate outer cylinder, the inner wall surface of the upper flange ring and the lower flange ring is flush with the inner wall surface of the steel plate inner cylinder, and the outer wall surface of the upper flange ring and the lower flange ring is flush with the outer wall surface of the steel plate outer cylinder; Concrete, the concrete is poured into a cavity surrounded by the lower end surface of the upper flange ring, the upper end surface of the lower flange ring, the outer wall surface of the steel plate inner cylinder and the inner wall surface of the steel plate outer cylinder; Anchor cards are arranged in the cavity for anchoring the concrete, the projection of the anchor cards in the up and down directions is U-shaped, the free end of the anchor cards is connected to the outer wall surface of the inner cylinder of the steel plate or the inner wall surface of the outer cylinder of the steel plate, there are multiple anchor cards, the multiple anchor cards are evenly distributed around the axis of the steel plate cylinder and are divided into multiple layers from bottom to top, and the anchor cards of adjacent layers are staggered.

2. The prefabricated vertical shaft segment ring according to claim 1, characterized in that: The upper flange ring is provided with a plurality of long strip-shaped pouring openings, and the plurality of pouring openings are evenly distributed along the axis of the upper flange ring.

3. The prefabricated vertical shaft segment ring according to claim 2, characterized in that: The prefabricated vertical shaft segment ring also includes a hook, the lower end of which extends into the cavity and is inserted into the concrete, the lower end of which is connected to the outer wall surface of the steel plate inner cylinder and / or the inner wall surface of the steel plate outer cylinder through a hook support plate, and the upper end of the hook passes through the upper flange ring and extends upward.

4. The prefabricated vertical shaft segment ring according to claim 3, characterized in that: The hook is in an inverted U shape, the free end of the hook is located at the lower end, and the plane where the hook is located passes through the axis line of the inner cylinder of the steel plate or the outer cylinder of the steel plate.

5. The prefabricated vertical shaft segment ring according to claim 4, characterized in that: The upper flange ring is also provided with a hook hole for the upper end of the hook to pass upward, there are a plurality of hook holes which are evenly distributed around the axis of the upper flange ring, and the hook holes are staggered with the pouring opening.

6. The prefabricated vertical shaft segment ring according to claim 2, characterized in that: The prefabricated vertical shaft segment ring also includes an inter-section grouting pipe, which is located in the cavity and is inclined downward and inward. The upper end of the inter-section grouting pipe passes through the outer wall of the steel plate outer cylinder, and the lower end of the inter-section grouting pipe passes through the lower surface of the lower flange ring. There are multiple inter-section grouting pipes and they are evenly distributed around the axial line of the lower flange ring. When two adjacent sections of the prefabricated vertical shaft segment rings are butt-jointed, the lower opening of the inter-section grouting pipe of the prefabricated vertical shaft segment ring located above is aligned with the casting port of the prefabricated vertical shaft segment ring located above.

7. The prefabricated vertical shaft segment ring according to claim 1, characterized in that: The upper flange ring is provided with upper flange bolt connection holes, and the upper flange connection bolt holes have multiple holes and are divided into an inner group of upper flange connection bolt holes close to the inner wall surface of the upper flange ring and an outer group of upper flange connection bolt holes close to the outer wall surface of the upper flange ring. The multiple upper flange bolt connection holes in the inner group of upper flange connection bolt holes are evenly distributed along the axis of the upper flange ring, and the multiple upper flange bolt connection holes in the outer group of upper flange connection bolt holes are evenly distributed along the axis of the upper flange ring.

8. The prefabricated vertical shaft segment ring according to claim 7, characterized in that: The steel plate inner cylinder and the steel plate outer cylinder are provided with upper flange bolt mounting holes corresponding to the upper flange bolt connection holes one by one, and the upper surface of the concrete after pouring is lower than the lower edge of the upper flange bolt mounting holes.

9. The prefabricated vertical shaft segment ring according to claim 1, characterized in that: The lower flange ring is provided with lower flange bolt connection holes, and the lower flange connection bolt holes have multiple holes and are divided into an inner group of lower flange connection bolt holes close to the inner wall surface of the lower flange ring and an outer group of lower flange connection bolt holes close to the outer wall surface of the lower flange ring. The multiple lower flange bolt connection holes in the inner group of lower flange connection bolt holes are evenly distributed along the axis of the lower flange ring, and the multiple lower flange bolt connection holes in the outer group of lower flange connection bolt holes are evenly distributed along the axis of the lower flange ring.

10. The prefabricated vertical shaft segment ring according to claim 9, characterized in that: The steel plate inner cylinder and the steel plate outer cylinder are provided with lower flange bolt mounting holes corresponding to the lower flange bolt connection holes one by one. When the concrete is poured, rubber plugs are plugged into the lower flange bolt mounting holes.