Rapid construction equipment for joint tape

By designing fast construction equipment for seam belts, the use of frames and transmission components to clean and dry dust and moisture in the cracks, the problems of cumbersome operation and low degree of automation in the prior art are solved, and work efficiency and degree of automation are improved.

CN222878479UActive Publication Date: 2025-05-16BEIJING JIAGE WEIYE ROAD CONSTR TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421827067.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2025-05-16
Estimated Expiration
2034-07-31

AI Technical Summary

Technical Problem

When cleaning dust and blowing moisture in cracks, the existing seam tape laying device needs to start the motor and exhaust fan separately, which increases the manufacturing cost and operation steps, has low automation and reduces working efficiency.

Method used

A fast construction equipment for seam belts is designed to drive bevel gears and transmission components through frame movement to realize the cleaning of dust in the cracks and blow-drying of moisture, simplifying operation steps and improving the degree of automation.

Benefits of technology

It realizes that the cracks can be cleaned and blown dry, saving costs, simplifying operation steps, and improving work efficiency and automation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222878479U_ABST
    Figure CN222878479U_ABST
Patent Text Reader

Abstract

The utility model discloses rapid construction equipment for seam tape pasting, which comprises a vehicle frame, a plurality of groups of wheels are rotatably arranged at the bottom of the vehicle frame at intervals, each group comprises two wheels, a connecting rod is fixedly arranged between the two wheels, a first bevel gear is fixedly sleeved on the connecting rod, two rotating rods are rotatably arranged at the bottom of the vehicle frame, and a second bevel gear is fixedly sleeved on the rotating rods. The rotating rods are fixedly sleeved with second bevel gears, the second bevel gears are meshed with the corresponding first bevel gears, a brush rod is rotationally arranged at the bottom of the frame, a brush plate is fixedly arranged at the bottom of the brush rod, a first transmission assembly is arranged between the brush rod and one of the rotating rods, and a heating cylinder is fixedly arranged at the bottom of the frame. A connecting shaft is rotationally arranged in the heating cylinder, fan blades are fixedly arranged at the bottom of the connecting shaft, and a second transmission assembly is arranged between the connecting shaft and the other rotating rod. Cracks can be cleaned and dried by pushing the frame to move, so that the cost is saved, and the operation steps are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of seam tapes, in particular to rapid seam tape construction equipment. Background Art

[0002] After the asphalt pavement is built, various forms of cracks will appear. The cracks that appear in the early stage have basically no effect on the performance of the asphalt pavement, but with the intrusion of surface rainwater, the pavement strength decreases, and under the action of a large amount of traffic load, the asphalt pavement will suffer structural damage. Therefore, when cracks appear on the asphalt pavement, seam tape is usually used to repair the cracks.

[0003] A Chinese patent document with publication number CN221029506U discloses a technical solution adopted by a seam tape paving device: comprising a moving plate, a first electric push rod is fixedly connected to the left side of the top of the moving plate, the output end of the first electric push rod penetrates the moving plate and is fixedly connected to a dust box, both sides of the bottom of the dust box are connected to dust pipes, the bottom of the dust pipe is fixedly connected to a cleaning brush, the top of the dust box is connected to a delivery pipe, the top of the delivery pipe penetrates the moving plate and is connected to a filter box, the right side of the filter box is connected to a suction fan, a metal filter is fixedly connected between the top and bottom of the inner cavity of the filter box, a second electric push rod is fixedly connected to the right side of the bottom of the moving plate, the output end of the second electric push rod is fixedly connected to a support plate, the front of the support plate is movably connected to a support roller, the left side of the second electric push rod is fixedly connected to a support frame, and a material roller is movably connected between the front and rear sides of the inner cavity of the support frame. The dust at the crack is cleaned by the cooperation of various components.

[0004] The disadvantage of the above disclosed solution is that when cleaning the dust in the cracks and drying the moisture, the motor and the exhaust fan need to be started separately, which not only increases the manufacturing cost, but also has complicated operation steps, low degree of automation, and reduces work efficiency. Utility Model Content

[0005] The technical problem to be solved by the utility model is to overcome the existing defects and provide a rapid construction device for sealing seams. The cracks can be cleaned and the moisture can be blown away by moving the frame, which not only saves costs but also saves operation steps, and can effectively solve the problems in the background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a kind of rapid construction equipment for sealing tape, comprising a frame, a plurality of groups of wheels are rotatably arranged at the bottom of the frame at intervals, each group includes two wheels, a connecting rod is fixedly arranged between the two wheels, a first bevel gear is fixedly sleeved on the connecting rod, two rotating rods are rotatably arranged at the bottom of the frame, a second bevel gear is fixedly sleeved on the rotating rod, the second bevel gear is meshed with the corresponding first bevel gear, a brush rod is rotatably arranged at the bottom of the frame, a brush plate is fixedly arranged at the bottom of the brush rod, a first transmission assembly is arranged between the brush rod and one of the rotating rods, a heating cylinder is fixedly arranged at the bottom of the frame, a plurality of heating rods are fixedly arranged inside the heating cylinder, a connecting shaft is rotatably arranged inside the heating cylinder, a fan blade is fixedly arranged at the bottom of the connecting shaft, a second transmission assembly is arranged between the connecting shaft and another rotating rod, and the frame is also respectively provided with a laying assembly for laying the sealing tape and a dust suction assembly for absorbing dust in the cracks.

[0007] Furthermore, the first transmission assembly and the second transmission assembly have the same structure. The first transmission assembly includes a first pulley and a second pulley. The first pulley is fixedly mounted on one of the rotating rods, and the second pulley is fixedly mounted on the brush rod. Belts are mounted on the second pulley and the first pulley.

[0008] Furthermore, the laying assembly includes a first cylinder, which is fixedly arranged on a frame, a first connecting frame is fixedly arranged on one side of the first cylinder, a material roller is rotatably arranged inside the first connecting frame, a second connecting frame is fixedly arranged at the output end of the first cylinder, and a support roller is actively arranged inside the second connecting frame.

[0009] Furthermore, a connecting plate is fixedly provided on a side of the first cylinder away from the first connecting frame, a second cylinder is fixedly provided on the connecting plate, and a cutting knife is fixedly provided on an output end of the second cylinder.

[0010] Furthermore, the dust suction assembly includes a dust collector, which is fixedly arranged on the top of the frame, a dust suction pipe is fixedly connected to the dust collector, and a dust suction plate is fixedly arranged on the bottom of the dust suction pipe.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] Since the second bevel gear is fixedly mounted on the rotating rod, the second bevel gear is meshed with the corresponding first bevel gear, a first transmission assembly is arranged between the brush rod and one of the rotating rods, and a second transmission assembly is arranged between the connecting shaft and the other rotating rod. Therefore, when in use, the frame is pushed to move, the frame drives the connecting rod to rotate through the wheel, the connecting rod drives the first bevel gear to rotate, the first bevel gear drives the corresponding second bevel gear to rotate, the second bevel gear drives one of the rotating rods to rotate, the rotating rod drives the first pulley to rotate, the first pulley drives the second pulley to rotate through the belt, the second pulley drives the brush plate to rotate, and the brush plate cleans the dust in the crack. Since the other rotating rod rotates and drives the connecting shaft to rotate through the second transmission assembly, the connecting shaft drives the fan blade to rotate, so the fan blade rotates to blow out the hot air in the heating cylinder, thereby drying the moisture in the cracks of the road surface, and increasing the firmness of the seam tape and the cracks. Thus, it is realized that the cracks can be cleaned and dried by pushing the frame to move, which not only saves costs, but also saves operation steps, has a high degree of automation, and improves work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a three-dimensional diagram of the structure of the utility model;

[0014] Figure 2 It is a stereogram of the structure of the utility model from different viewing angles;

[0015] Figure 3 It is a three-dimensional diagram of the structural laying components of the utility model.

[0016] In the figure: 1. frame; 2. wheel; 3. connecting rod; 4. first bevel gear; 5. rotating rod; 6. second bevel gear; 7. first pulley; 8. belt; 9. brush rod; 10. second pulley; 11. brush plate; 12. vacuum cleaner; 13. vacuum tube; 14. vacuum plate; 15. heating cylinder; 16. heating rod; 17. connecting shaft; 18. fan blade; 19. first cylinder; 20. first connecting frame; 21. material roller; 22. second connecting frame; 23. support roller; 24. connecting plate; 25. second cylinder; 26. cutting knife. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0018] See also Figure 1-Figure 3The utility model provides a technical solution: a rapid construction device for seam tape, comprising a frame 1, a plurality of groups of wheels 2 are rotatably arranged at intervals at the bottom of the frame 1, each group comprises two wheels 2, and a connecting rod 3 is coaxially fixedly arranged between the two wheels 2. The frame 1 comprises a top plate, a plurality of supporting legs are evenly fixedly arranged at the bottom of the top plate. The plurality of supporting legs correspond to the plurality of wheels 2 one by one, and the bottom of the supporting legs is rotatably connected to the corresponding wheels 2.

[0019] A first bevel gear 4 is fixedly sleeved on the connecting rod 3, and two rotating rods 5 are rotatably provided at the bottom of the frame 1, and the two rotating rods 5 are arranged vertically. A second bevel gear 6 is fixedly sleeved on the bottom of the rotating rod 5, and the second bevel gear 6 is meshed with the corresponding first bevel gear 4. A brush rod 9 is rotatably provided at the bottom of the top plate of the frame 1, and a brush plate 11 is fixedly provided at the bottom of the brush rod 9. A first transmission assembly is provided between the brush rod 9 and one of the rotating rods 5, and the first transmission assembly includes a first pulley 7 and a second pulley 10, the first pulley 7 is fixedly sleeved on one of the rotating rods 5, the second pulley 10 is fixedly sleeved on the brush rod 9, and a belt 8 is sleeved on the second pulley 10 and the first pulley 7.

[0020] A heating cylinder 15 is fixedly arranged at the bottom of the top plate of the frame 1, and a plurality of heating rods 16 are fixedly arranged inside the heating cylinder 15, and an electric heating wire is arranged inside the heating rod 16. The heating rod 16 plays the role of heating the air. A connecting shaft 17 is arranged vertically and rotatably inside the heating cylinder 15, and a fan blade 18 is fixedly arranged at the bottom of the connecting shaft 17. A second transmission assembly is arranged between the connecting shaft 17 and another rotating rod 5, and the second transmission assembly has the same structure as the first transmission assembly.

[0021] The top plate of the frame 1 is also provided with a laying component for laying the seam tape and a dust collecting component for absorbing dust in the cracks. The laying component includes a first cylinder 19, which is vertically fixedly arranged at the bottom of the top plate of the frame 1, and a first connecting frame 20 is fixedly arranged on one side of the first cylinder 19, and a material roller 21 is rotatably arranged inside the first connecting frame 20, and the seam tape can be installed on the material roller 21. A second connecting frame 22 is fixedly arranged at the output end of the first cylinder 19, and a supporting roller 23 is actively arranged inside the second connecting frame 22. The second connecting frame 22 and the first connecting frame 20 are both "U"-shaped.

[0022] A connecting plate 24 is fixedly provided on one side of the first cylinder 19 away from the first connecting frame 20 , and a second cylinder 25 is fixedly provided on the connecting plate 24 . The output end of the second cylinder 25 faces downward and a cutting knife 26 is fixedly provided thereon.

[0023] The dust collection assembly includes a dust collector 12, which is fixedly arranged on the top of the top plate of the frame 1. A dust collection pipe 13 is fixedly connected to the dust collector 12. The dust collection pipe 13 passes downward through the top plate of the frame 1 and extends to the bottom of the top plate. A dust collection plate 14 is fixedly arranged at the bottom of the dust collection pipe 13. The dust collection plate 14 is a box structure with an open bottom, and the interior of the dust collection plate 14 is connected to the dust collection pipe 13.

[0024] The working principle of the rapid construction equipment of the seam tape provided by the utility model is as follows:

[0025] When in use, the vacuum cleaner 12 and the heating rod 16 are started, and the heating rod 16 heats the air inside the heating cylinder 15. Then the frame 1 is pushed to move, the frame 1 drives the wheel 2 to rotate, the rotation of the wheel 2 drives the connecting rod 3 to rotate, the connecting rod 3 drives the first bevel gear 4 to rotate, the first bevel gear 4 drives the corresponding second bevel gear 6 to rotate, the second bevel gear 6 drives one of the rotating rods 5 to rotate, the rotating rod 5 drives the first pulley 7 to rotate, the first pulley 7 drives the second pulley 10 to rotate through the belt 8, the second pulley 10 drives the brush plate 11 to rotate, the brush plate 11 cleans the dust in the crack, and when the dust collecting plate 14 passes through the crack, the vacuum cleaner 12 absorbs the dust in the crack through the dust collecting plate 14.

[0026] When the fan blades 18 pass through the cracks, the other rotating rod 5 rotates through the second transmission assembly to drive the connecting shaft 17 to rotate, and the connecting shaft 17 drives the fan blades 18 to rotate. Therefore, the fan blades 18 rotate to blow out the hot air in the heating tube 15, thereby drying the moisture in the cracks in the road surface and increasing the firmness of the sealing tape and the cracks.

[0027] The first cylinder 19 is started to extend, and the output end of the first cylinder 19 drives the second connecting frame 22 to move downward, and the second connecting frame 22 drives the supporting roller 23 to move downward, and the supporting roller 23 contacts the seam tape with the crack, and the supporting roller 23 is driven to rotate by the frame 1 to complete the rapid mounting. The second cylinder 25 is started to drive the cutting knife 26 to move downward to cut the seam tape.

[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A rapid construction device for applying a seam tape, comprising a frame (1), characterized in that: The bottom of the vehicle frame (1) is provided with a plurality of groups of wheels (2) for rotation at intervals, each group comprising two wheels (2), a connecting rod (3) is fixedly provided between the two wheels (2), a first bevel gear (4) is fixedly sleeved on the connecting rod (3), two rotating rods (5) are rotatably provided at the bottom of the vehicle frame (1), a second bevel gear (6) is fixedly sleeved on the rotating rod (5), the second bevel gear (6) is meshed with the corresponding first bevel gear (4), a brush rod (9) is rotatably provided at the bottom of the vehicle frame (1), a brush plate (11) is fixedly provided at the bottom of the brush rod (9), and a brush plate (12) is fixedly provided at the bottom of the brush rod (9). ), a first transmission assembly is arranged between the brush rod (9) and one of the rotating rods (5), a heating cylinder (15) is fixedly arranged at the bottom of the frame (1), a plurality of heating rods (16) are fixedly arranged inside the heating cylinder (15), a connecting shaft (17) is rotatably arranged inside the heating cylinder (15), a fan blade (18) is fixedly arranged at the bottom of the connecting shaft (17), a second transmission assembly is arranged between the connecting shaft (17) and the other rotating rod (5), and the frame (1) is also respectively provided with a laying assembly for laying a seam tape and a dust suction assembly for absorbing dust in the cracks.

2. The rapid construction equipment of the joint tape according to claim 1 is characterized in that: The first transmission assembly and the second transmission assembly have the same structure. The first transmission assembly comprises a first pulley (7) and a second pulley (10). The first pulley (7) is fixedly sleeved on one of the rotating rods (5), and the second pulley (10) is fixedly sleeved on the brush rod (9). Belts (8) are sleeved on the second pulley (10) and the first pulley (7).

3. The rapid construction equipment of the joint tape according to claim 1 is characterized in that: The laying assembly comprises a first cylinder (19), the first cylinder (19) is fixedly arranged on the frame (1), a first connecting frame (20) is fixedly arranged on one side of the first cylinder (19), a material roller (21) is rotatably arranged inside the first connecting frame (20), a second connecting frame (22) is fixedly arranged at the output end of the first cylinder (19), and a supporting roller (23) is actively arranged inside the second connecting frame (22).

4. The rapid construction equipment of the joint tape according to claim 3 is characterized in that: A connecting plate (24) is fixedly arranged on one side of the first cylinder (19) away from the first connecting frame (20), a second cylinder (25) is fixedly arranged on the connecting plate (24), and a cutting knife (26) is fixedly arranged at the output end of the second cylinder (25).

5. The rapid construction equipment of the joint tape according to claim 1 is characterized in that: The dust collection assembly comprises a dust collector (12), the dust collector (12) is fixedly arranged on the top of the vehicle frame (1), a dust collection pipe (13) is fixedly connected to the dust collector (12), and a dust collection plate (14) is fixedly arranged at the bottom of the dust collection pipe (13).

Citation Information

Patent Citations

  • Seam tape paving device

    CN221029506U