Movable trolley for improving wall brick paving construction
By designing a mobile car equipped with hook plates, clips and rollers, the efficiency and safety issues of tiles handling and plastering in wall tiling construction are solved, and a convenient and efficient construction process is achieved, reducing the risk of tiles damage.
Patent Information
- Application Number
- CN202422301689.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2025-06-13
- Estimated Expiration
- 2034-09-20
AI Technical Summary
In the construction of wall tiling, it is difficult for the existing technology to efficiently and safely carry and plaster ceramic tiles, resulting in heavy burden on staff, low efficiency and easy damage to the tiles.
A mobile car is designed, including support frames, legs and rollers, equipped with hook plates, clips and limit nuts, which can hook and fix ceramic tiles, and facilitate transportation and plastering construction through rollers and legs.
This device makes the transfer and plastering process of ceramic tiles more time-saving, reduces the risk of tiles damage, improves work efficiency, and provides a flexible construction platform to reduce the burden on staff.
Smart Images

Figure CN222973413U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a tile handling trolley, in particular to a mobile trolley for improving the wall tiling construction, belonging to the technical field of interior decoration. Background Art
[0002] Tiles on the wall are more and more popular among people. Compared with the traditional painted wall, it has good waterproof and anti-seepage effects and is beautiful and generous. Since a single wall tile is relatively large and very heavy, when workers are laying interior wall tiles, they generally place two bricks against the wall, lay cotton cloth on the bricks, and then stack the tiles against the wall on the bricks. When workers need to tile a certain wall surface, they will use manual handling to move the tiles one by one to the construction wall surface. This method is time-consuming and laborious, and there is a risk of damaging the tiles if there is a slight carelessness during the handling process. Summary of the Utility Model
[0003] The technical problem to be solved by the utility model is to overcome the deficiencies of the prior art and provide a mobile trolley for improving the wall tiling construction, which is convenient for workers to transfer and plaster the wall tiles, reduces the burden on workers, improves work efficiency, and avoids damage to the tiles during the transfer process.
[0004] The technical solution adopted by the utility model to solve the technical problem is:
[0005] A mobile trolley for improving the wall tiling construction, including a support frame, legs and rollers. Handles are respectively arranged on both sides of the right end of the support frame. A bracket is arranged at the bottom of the front end of the support frame, and rollers are arranged at the bottom of the bracket. Cross braces are arranged at intervals between the inner walls of the support frame. Fixed sleeves are respectively arranged on both sides of the bottom of the support frame, and hook plates penetrate through each fixed sleeve, and a connecting handle is arranged between the right ends of the two hook plates. The connecting handle penetrates through a stud, and limit nuts are arranged on the studs on both sides of the connecting handle. The left end of the stud is fixedly connected to the right end face of the support frame. Wall tile clamping components are slidably connected to both side faces of the support frame.
[0006] A second limit nut matching the stud on the left side of the connecting handle is arranged on the stud, and a first limit nut matching the stud on the right side of the connecting handle is arranged on the stud.
[0007] There are two hook plates, which are respectively located on both sides of the bracket.
[0008] Legs are respectively vertically arranged on both sides of the bottom of the right end of the support frame, and diagonal braces are arranged between the legs and the support frame.
[0009] The wall tile clamping assembly is composed of a displacement vertical plate, a support column and a clamping member. Displacement tracks are respectively arranged on the two side surfaces of the support frame. The displacement vertical plate is slidably connected with the displacement track through a slider, and a connecting rod is arranged between the bottoms of the left and right displacement vertical plates, and the connecting rod is located below the hook plate. A support column penetrates through the bottom end of the displacement vertical plate, a support block is arranged at the outer end of the support column, and a clamping member penetrates through the support block.
[0010] The clamping member is distributed in an L shape, and a matching limit nut is screwed on the clamping member below the support block. The clamping member is located above the support frame.
[0011] The support column is fixedly connected with the displacement vertical plate through a bolt, and the displacement vertical plate is fixedly connected with the support frame through a bolt.
[0012] The positive and beneficial effects of the utility model are as follows:
[0013] 1. By arranging a hook plate at the bottom of the support frame and telescoping the hook plate, the bottom of the ceramic tile can be hooked. With the cooperation of the clamping member, the ceramic tile can be fixed, which is convenient for the staff to transport and construct the ceramic tile, saving time and effort and having simple operation.
[0014] 2. By arranging rollers at the bottom of the front end of the support frame, when the ceramic tile needs to be transported, the rollers at the front end of the support frame are placed on the ground, the support frame is erected, and then the ceramic tile is moved to the hook plate. After the clamping member clamps and fixes the ceramic tile, the trolley is rotated to a horizontal state, and then the ceramic tile can be transported, avoiding the inconvenience brought by manual handling and reducing the damage rate of the ceramic tile.
[0015] 3. By arranging support legs on both sides of the rear end of the support frame, when the ceramic tile is transported to the construction site, the device forms a construction platform by using the support legs, and the staff can plaster the ceramic tile. It is flexible to use, improves work efficiency and is easy to promote. Description of the Drawings
[0016] Figure 1 is a schematic structural diagram of the utility model;
[0017] Figure 2 is a schematic structural diagram of the wall tile clamping assembly of the utility model;
[0018] Figure 3 is a storage diagram of the wall tile;
[0019] Wherein: 1 - support frame, 2 - handle, 3 - leg, 4 - diagonal brace, 5 - bracket, 6 - roller, 7 - fixed sleeve, 8 - hook plate, 9 - connecting handle, 10 - stud, 11 - first limit nut, 12 - second limit nut, 13 - displacement track, 14 - displacement vertical plate, 15 - connecting rod, 16 - support pillar, 17 - support block, 18 - clamping member, A - wall surface, B - brick, C - ceramic tile. Detailed implementation mode
[0020] The following further explains and illustrates the present utility model with reference to the accompanying drawings:
[0021] Embodiment, refer to Figure 1 - Figure 2 , a mobile trolley for improving the construction of wall tile laying, including a support frame 1, legs 3 and rollers 6. Handles 2 are respectively arranged on both sides of the right end of the support frame 1. A bracket 5 is arranged at the bottom of the front end of the support frame 1. Rollers 6 are arranged at the bottom of the bracket 5. Cross braces are arranged at intervals between the inner walls of the support frame 1. Fixed sleeves 7 are respectively arranged on both sides of the bottom of the support frame 1. Hook plates 8 penetrate through each fixed sleeve 7. A connecting handle 9 is arranged between the right ends of the two hook plates 8. The connecting handle 9 penetrates through a stud 10. Limit nuts are arranged on the studs 10 on both sides of the connecting handle 9. The left end of the stud 10 is fixedly connected to the right end face of the support frame 1. A wall tile clamping assembly is slidably connected to both side surfaces of the support frame 1.
[0022] A second limit nut 12 that matches is arranged on the stud 10 on the left side of the connecting handle 9. A first limit nut 11 that matches is arranged on the stud 10 on the right side of the connecting handle 9.
[0023] There are two hook plates 8, which are respectively located at positions on both sides of the bracket 5.
[0024] Legs 3 are respectively vertically arranged on both sides of the bottom of the right end of the support frame 1. A diagonal brace 4 is arranged between the legs 3 and the support frame 1.
[0025] The wall tile clamping assembly is composed of a displacement vertical plate 14, a support pillar 16 and a clamping member 18. Displacement tracks 13 are respectively arranged on both side surfaces of the support frame 1. The displacement vertical plate 14 is slidably connected to the displacement track 13 through a slider. A connecting rod 15 is arranged between the bottoms of the left and right displacement vertical plates 14. And the connecting rod 5 is located below the hook plate 8. A support pillar 16 penetrates through the bottom end of the displacement vertical plate 14. A support block 17 is arranged at the outer end of the support pillar 16. A clamping member 18 penetrates through the support block 17.
[0026] The clamping member 18 is distributed in an L shape. A limit nut that matches is screwed on the clamping member 18 below the support block 17. The clamping member 18 is located above the support frame 1.
[0027] The support column 16 is fixedly connected to the displacement vertical plate 14 by bolts, and the displacement vertical plate 14 is fixedly connected to the support frame 1 by bolts.
[0028] In the above description, there are two legs, and the heights of the legs and the rollers satisfy that the support frame can be in a horizontal state.
[0029] In the above description, the fixed sleeve is arranged at the bottom positions of the support frame and the cross brace.
[0030] In the above description, the size of the clamping member satisfies that the clamping member can tightly clamp and fix the upper end surface of the ceramic tile.
[0031] In the above description, there are two handles, which are extensions of the side frames of the support frame, and the displacement track extends to the handles.
[0032] Working principle:
[0033] When the device is not in use, the ceramic tile clamping assembly is located at the handle. When the device moves to the ceramic tile storage place, the support frame is erected. At this time, the legs are away from the ground. Then, the second limit nut is rotated to lower the hook plate until it is located at the bottom of the ceramic tile. The staff moves the ceramic tile slightly towards the support frame, then horizontally moves the ceramic tile clamping assembly, adjusts the extended length of the support column according to the width of the ceramic tile, and uses the clamping member to tightly clamp and fix the upper surface of the ceramic tile. Then, the position of the hook plate is adjusted so that the bottom of the hook plate hooks the bottom of the ceramic tile. Finally, the support frame is rotated to the horizontal state, and the ceramic tile is transported.
[0034] When the ceramic tile is transported to the wall for laying, plastering is carried out on the ceramic tile, and the ceramic tile is laid and constructed by using the lifting device.
[0035] The utility model is provided with rollers at the bottom of the front end of the support frame and legs at the bottom of the rear end of the support frame, which can not only transport the ceramic tiles but also carry out plastering construction on the ceramic tiles, facilitating the staff to carry out transportation construction on the ceramic tiles, avoiding the inconvenience brought by manual handling, reducing the damage rate of the ceramic tiles, lightening the burden of the staff, being flexible in use, simple in operation, and easy to popularize.
Claims
1. A mobile trolley for improving wall paving construction, comprising a support frame (1), legs (3) and rollers (6), characterized in that: Handles (2) are respectively arranged on both sides of the right end of the support frame (1), a bracket (5) is arranged at the bottom of the front end of the support frame (1), a roller (6) is arranged at the bottom of the bracket (5), and cross braces are arranged at intervals between the inner walls of the support frame (1). Fixed sleeves (7) are respectively arranged on both sides of the bottom of the support frame (1), and a hook plate (8) is passed through each fixed sleeve (7), and a connecting handle (9) is arranged between the right ends of the two hook plates (8), the connecting handle (9) passes through the stud (10), and limit nuts are arranged on the studs (10) on both sides of the connecting handle (9), the left end of the stud (10) is fixedly connected to the right end surface of the support frame (1), and wall tile clamping components are slidably connected to the two side surfaces of the support frame (1).
2. A mobile vehicle for improving wall paving construction according to claim 1, characterized in that: A matching second limiting nut (12) is provided on the stud (10) on the left side of the connecting handle (9), and a matching first limiting nut (11) is provided on the stud (10) on the right side of the connecting handle (9).
3. A mobile vehicle for improving wall paving construction according to claim 1, characterized in that: There are two hook plates (8), which are respectively located at two sides of the bracket (5).
4. A mobile vehicle for improving wall paving construction according to claim 1, characterized in that: Support legs (3) are respectively vertically arranged on both sides of the bottom of the right end of the support frame (1), and an oblique support (4) is arranged between the support leg (3) and the support frame (1).
5. The mobile vehicle for improving the wall paving construction according to claim 1 is characterized by: The wall tile clamping assembly is composed of a displacement vertical plate (14), a pillar (16) and a clamping piece (18). Displacement tracks (13) are respectively arranged on both side surfaces of the support frame (1). The displacement vertical plate (14) is slidably connected to the displacement track (13) via a slider. A connecting rod (15) is arranged between the bottoms of the left and right displacement vertical plates (14), and the connecting rod (15) is located below the hook plate (8). The bottom end of the displacement vertical plate (14) is penetrated by a pillar (16), and the outer end of the pillar (16) is provided with a support block (17), and the support block (17) is penetrated by a clamping piece (18).
6. A mobile vehicle for improving wall paving construction according to claim 5, characterized in that: The clamping member (18) is distributed in an L shape, and a matching limiting nut is screwed onto the clamping member (18) below the support block (17), and the clamping member (18) is located above the support frame (1).
7. A mobile vehicle for improving wall paving construction according to claim 5, characterized in that: The support column (16) is fixedly connected to the displacement vertical plate (14) by bolts, and the displacement vertical plate (14) is fixedly connected to the support frame (1) by bolts.