Split type pedestal pan
Through the split-shaped toilet body and the periphery, and the bonding between the skirt and the connection part and the plugging of the sewage section, the problems of low production efficiency of toilets and easy cracking at the bonding areas in the prior art are solved, and efficient and stable assembly is achieved and production yield is improved.
Patent Information
- Application Number
- CN202422308678.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2025-07-08
- Estimated Expiration
- 2034-09-20
AI Technical Summary
In the prior art, the toilet body of the toilet needs to be bonded multiple places when assembling the edge enclosure, which is difficult to operate, complex process, low production efficiency, and cracks are prone to occur at the bonding points, affecting structural strength and production yield.
Using a split design, the toilet main body and the periphery are formed integrally, and are fixed by the adhesive and fixing of the skirt and the connection part, and the plugging of the sewage discharge section to the support structure, reducing the number of bonding times, and using the support structure to support the positioning boss to achieve stable assembly of the toilet main body and the periphery.
It reduces the risk of cracks at the bonding site, improves production efficiency and yield, simplifies the assembly process, and improves the overall structural strength and production efficiency of the toilet.
Smart Images

Figure CN223074867U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of sanitary facilities, in particular to a split toilet bowl. Background Art
[0002] A toilet bowl usually includes a toilet body and a perimeter. The toilet body consists of a toilet bowl, a sewage pipe, a seat ring, etc. The toilet body is accommodated in a cavity inside the perimeter. The toilet body and the perimeter are integrally formed respectively and then fixed by bonding. In related technologies, when assembling the toilet body and the perimeter, multiple bonding operations are required to complete the fixation, which is difficult to operate, has a complex process, results in a low production efficiency of the toilet bowl, and the bonding areas are prone to blank cracking, affecting the overall structural strength of the toilet bowl and leading to a low production yield of the toilet bowl. Summary of the Invention
[0003] The utility model aims to solve at least one of the technical problems existing in the prior art. For this purpose, the utility model provides a split toilet bowl with fewer bonding times, which can improve the production efficiency and yield of the toilet bowl.
[0004] According to the split toilet bowl in the embodiment of the utility model, it includes:
[0005] A toilet body, including a bladder, a seat ring, and a sewage pipe. The seat ring is connected to the top of the bladder, and a part of the seat ring protrudes towards the outside of the bladder to form a connecting part. The sewage pipe includes a sewage guiding section and a sewage discharging section connected to the rear end of the sewage guiding section. The front end of the sewage guiding section communicates with the inner cavity of the bladder. The sewage discharging section extends downward, and a clamping boss is provided on the periphery of the sewage discharging section;
[0006] A perimeter, including a skirt and a support structure connected to the rear side of the skirt. The skirt has a first installation cavity inside. At least part of the bladder is accommodated in the first installation cavity. The bottom surface of the connecting part is bonded to the top surface of the skirt. The sewage discharging section is inserted into the support structure, and the clamping boss abuts against the top of the support structure;
[0007] Wherein, the toilet body and the perimeter are integrally formed respectively.
[0008] According to the split toilet bowl in the embodiment of the utility model, it has at least the following beneficial effects:
[0009] In the utility model, through the bonding and fixation between the skirt and the connecting part, as well as the insertion of the sewage discharging section into the support structure and the support of the support structure on the clamping boss, the assembly of the toilet body and the perimeter is completed. There is only one bonding position between the skirt and the connecting part for their assembly, with fewer bonding times, high assembly convenience, reducing the risk of blank cracking at the bonding areas, and improving the production efficiency and yield of the toilet bowl.
[0010] According to some embodiments of the present utility model, at least a part of the bottom of the sewage guiding section abuts against the top of the supporting structure.
[0011] According to some embodiments of the present utility model, a part of the sewage guiding section extends gradually upward from front to back to form a rising portion, the rear end of the rising portion communicates with the upper end of the sewage discharging section, and at least a part of the bottom of the rising portion abuts against the top of the supporting structure;
[0012] And / or, the bottom of a part of the sewage guiding section bulges downward to form a supporting protrusion, and the supporting protrusion abuts against the top of the supporting structure.
[0013] According to some embodiments of the present utility model, the top of the supporting structure is provided with a first supporting portion and a second supporting portion located at the front end of the first supporting portion. The first supporting portion is horizontal, the second supporting portion inclines downward relative to the first supporting portion. The sewage discharging section is inserted into the first supporting portion, the clamping boss abuts against the top of the first supporting portion, and the bottom of the sewage guiding section abuts against the top of the second supporting portion.
[0014] According to some embodiments of the present utility model, at least a part of the sewage guiding section is located at the rear side of the bladder bag and extends upward from front to back to form a rising portion. The toilet body further includes a first strengthening structure, and the first strengthening structure is connected between the top of the rising portion and the rear side of the bladder bag.
[0015] According to some embodiments of the present utility model, the periphery further includes a supporting retaining wall and a second strengthening structure. The supporting retaining wall is connected to the rear end of the skirt edge and extends vertically. The supporting structure is located at the rear side of the supporting retaining wall, and the second strengthening structure is connected between the top of the supporting structure and the rear side of the supporting retaining wall.
[0016] According to some embodiments of the present utility model, the supporting retaining wall includes a first retaining wall and a second retaining wall. The first retaining wall is connected to the rear end of the skirt edge. The second retaining wall is connected to the rear end of the first retaining wall and protrudes relative to the first retaining wall towards the sewage pipe. The second strengthening structure is connected between the rear side of the second retaining wall and the top of the supporting structure. The first retaining wall is provided with a single-sided pulp structure and is lower than the top surface of the skirt edge.
[0017] According to some embodiments of the present utility model, there are two supporting retaining walls. The two supporting retaining walls are respectively connected to the two rear ends of the skirt edge, and the two supporting retaining walls are arranged at intervals. Each supporting retaining wall is connected with the second strengthening structure, and the sewage pipe is located between the two supporting retaining walls and the two second strengthening structures.
[0018] According to some embodiments of the present utility model, there is a gap between the inner surface of the skirt edge and the outer surface of the bladder bag;
[0019] And / or, a reinforcing portion is provided at the junction of the seat ring and the bladder bag, the reinforcing portion protrudes towards the skirt edge, and there is a gap between the reinforcing portion and the inner surface of the skirt edge.
[0020] According to some embodiments of the present utility model, a second installation cavity is provided inside the support structure, an opening communicating with the second installation cavity is provided at the front end of the support structure, and part of the sewage discharge section is inserted into the second installation cavity.
[0021] The additional aspects and advantages of the present utility model will be partly given in the following description, partly become obvious from the following description, or be understood through the practice of the present utility model. Description of the Drawings
[0022] The following further describes the present utility model in conjunction with the drawings and embodiments, where:
[0023] Figure 1 is a schematic diagram of an embodiment of the split toilet of the present utility model;
[0024] Figure 2 is Figure 1 a cross-sectional view of the split toilet in
[0025] Figure 3 is a schematic diagram of an embodiment of the toilet body;
[0026] Figure 4 is a schematic diagram of an embodiment of the periphery;
[0027] Figure 5 is Figure 2 an enlarged view of part A in
[0028] Figure 6 is Figure 2 an enlarged view of part B in
[0029] Reference numerals:
[0030] Toilet body 100, bladder bag 110, water guiding wall 111, washing wall 112, bladder tip 113, convex structure 114, seat ring 120, connecting portion 121, sewage discharge pipe 130, sewage guiding section 131, rising portion 1311, supporting convex 1312, sewage discharge section 132, clamping convex platform 133, reinforcing portion 140, first reinforcing structure 150;
[0031] Periphery 200, skirt 210, first installation cavity 211, foot portion 212, support structure 220, installation hole 221, first support portion 222, second support portion 223, second installation cavity 224, opening 225, support retaining wall 230, first retaining wall 231, second retaining wall 232, second strengthening structure 240;
[0032] Drain pipe fitting 300. Detailed implementation manner
[0033] The embodiments of the present invention will be described in detail below. The examples of the embodiments are shown in the drawings, where the same or similar reference numerals denote the same or similar elements or elements with the same or similar functions throughout. The embodiments described below by referring to the drawings are exemplary and are only used to explain the present invention, and should not be construed as a limitation to the present invention.
[0034] In the description of the present invention, it should be understood that for the orientation description, such as up, down, front, back, left, right, etc., the orientation or positional relationship indicated is based on the orientation or positional relationship shown in the drawings. It is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as a limitation to the present invention.
[0035] In the description of the present invention, the meaning of several is more than one, the meaning of multiple is more than two, greater than, less than, exceeding, etc. are understood as not including the present number, and above, below, within, etc. are understood as including the present number. If there is a description of first and second, it is only for the purpose of distinguishing technical features and should not be understood as indicating or implying relative importance or implicitly indicating the quantity of the indicated technical features or implicitly indicating the sequence relationship of the indicated technical features.
[0036] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installation, connection, etc. should be understood in a broad sense. Those skilled in the art can reasonably determine the specific meanings of the above terms in the present invention in combination with the specific content of the technical solution.
[0037] In the description of the present invention, the description referring to terms such as "one embodiment", "some embodiments", "schematic embodiments", "examples", "specific examples", or "some examples", etc. means that the specific features, structures, materials, or characteristics described in connection with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic descriptions of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described can be combined in a suitable manner in any one or more embodiments or examples.
[0038] For the convenience of understanding, in the present utility model, it is defined that when the toilet is in use, the side facing the user is the front, the side facing away from the user is the rear, the side for the user to squat or sit is the upper side, and the opposite side is the lower side.
[0039] Referring to Figures 1 to 4 , the split toilet in the present utility model includes a toilet body 100 and a periphery 200 that are separately formed. The toilet body 100 and the periphery 200 are integrally formed separately and then assembled to form the split toilet. Exemplarily, the toilet body 100 and the periphery 200 are respectively formed by high-pressure grouting using molds, and after being separately formed, they are assembled by bonding or other means, and then the split toilet is obtained through high-temperature firing.
[0040] The toilet body 100 includes a bladder 110, a seat ring 120, and a sewage pipe 130. The inner cavity of the bladder 110 forms a toilet bowl, and the sewage pipe 130 communicates with the inner cavity of the bladder 110. The dirt generated after washing in the bladder 110 is discharged into the sewage pipe 130 and discharged through the sewage pipe 130; specifically, the sewage pipe 130 includes a sewage guiding section 131 and a sewage discharging section 132. The sewage discharging section 132 is connected to the rear end of the sewage guiding section 131. The front end of the sewage guiding section 131 communicates with the inner cavity of the bladder 110. The dirt in the bladder 110 is discharged into the sewage guiding section 131 through the bladder tip 113 and further discharged from the sewage discharging section 132.
[0041] The periphery 200 includes a skirt 210 and a support structure 220 connected to the rear side of the skirt 210. A first installation cavity 211 is provided inside the skirt 210. At least a part of the bladder 110 is accommodated in the first installation cavity 211. The skirt 210 shields the outer surface of the bladder 110 to protect the bladder 110. The seat ring 120 is connected to the top of the bladder 110. As Figure 5 , a part of the seat ring 120 protrudes outwardly towards the bladder 110 to form a connecting portion 121. The bottom surface of the connecting portion 121 is bonded to the top surface of the skirt 210. The seat ring 120 is supported by the skirt 210 and adhesively fixed to the skirt 210.
[0042] As Figures 2 to 4 , the sewage discharging section 132 of the sewage pipe 130 extends downward. An installation hole 221 is provided at the top of the support structure 220. The sewage discharging section 132 can be inserted into the installation hole 221 of the support structure 220 from top to bottom. A clamping boss 133 is provided on the circumferential side of the sewage discharging section 132. After a part of the sewage discharging section 132 is inserted into the support structure 220, the clamping boss 133 abuts against the top of the support structure 220. The support structure 220 supports the sewage pipe 130. And because the sewage discharging section 132 is inserted into the support structure 220, the sewage discharging section 132 and the support structure 220 are mutually limited in the horizontal plane, so that the toilet body 100 and the periphery 200 have relatively high assembly stability.
[0043] In this utility model, through the bonding and fixing of the skirt 210 and the connecting part 121, as well as the insertion of the sewage discharge section 132 into the support structure 220 and the support of the support structure 220 for the clamping boss 133, the assembly of the toilet body 100 and the periphery 200 is completed. There is only one bonding position between the skirt 210 and the connecting part 121 in the assembly of the two, with fewer bonding times, high assembly convenience, reduced risk of blank cracking at the bonding position, and improved production efficiency and yield of the toilet. In addition, the toilet is only composed of two parts, the toilet body 100 and the periphery 200. During the molding process of the toilet, there are fewer mold blocks required. The seat ring 120 is directly integrally formed with the bladder 110 and can be formed by one mold without additional auxiliary small-piece molds, which can greatly reduce the operation process difficulty and mold cost of high-pressure grouting molding.
[0044] It can be understood that the skirt 210 surrounds the outer periphery of the bladder 110. The seat ring 120 is connected to the top of the bladder 110 and extends along the contour of the top of the bladder 110. The positions of the skirt 210 and the seat ring 120 correspond. The entire top surface of the skirt 210 is in contact with the connecting part 121. The contact area between the top surface of the skirt 210 and the connecting part 121 is large, enabling the toilet body 100 to be stably supported by the skirt 210, and the bonding strength between the two is high.
[0045] Furthermore, when the toilet body 100 and the periphery 200 are assembled, a circle of bonding paste is applied along the circumferential direction of the skirt 210 at the top of the skirt 210 and / or the bottom of the connecting part 121. When the seat ring 120 gradually approaches the top of the skirt 210, the sewage discharge section 132 is inserted into the mounting hole 221. When the connecting part 121 is bonded to the top of the skirt 210, the clamping boss 133 abuts against the top of the support structure 220, simultaneously realizing the bonding of the seat ring 120 and the skirt 210 and the support of the support structure 220 for the sewage pipe 130.
[0046] In addition, as Figure 5 shown, the width of the connecting part 121 is set to be greater than the thickness of the skirt 210. The outer surface of the connecting part 121 is flush with the outer surface of the skirt 210, so that there is a gap between the inner surface of the skirt 210 near the top and the outer surface of the bladder 110 near the top. This gap is adjacent to the bonding position between the connecting part 121 and the skirt 210, forming a stacking space for the bonding paste squeezed out during bonding, keeping the outer surface of the toilet clean and enabling heat dissipation and expansion of each part during the firing process to avoid firing defects.
[0047] Further, a reinforcing portion 140 is provided at the junction of the seat ring 120 and the bladder 110. The reinforcing portion 140 protrudes towards the skirt 210. The thickness of the toilet body 100 at the reinforcing portion 140 is relatively large, which can improve the support strength of the seat ring 120 and the overall strength of the toilet body 100. Moreover, the reinforcing portion 140 does not contact the inner surface of the skirt 210, and there is a certain gap between the two, which can accommodate the extruded excess adhesive paste and ensure uniform heat dissipation of each part during the firing process, preventing firing defects such as cracks.
[0048] Refer to Figure 2 、 Figure 3 And Figure 6 In the present utility model, at least a part of the bottom of the sewage guiding section 131 abuts against the top of the supporting structure 220. The sewage guiding section 131 and the sewage discharging section 132 of the sewage discharging pipe 130 are simultaneously supported by the supporting structure 220. The contact area between the supporting structure 220 and the sewage discharging pipe 130 is relatively large, and the sewage discharging pipe 130 is effectively supported by the supporting structure 220, reducing the risk of the sewage discharging pipe 130 pressing down during the drying and firing processes. It can be understood that since the rear part of the sewage guiding section 131 is adjacent to the sewage discharging section 132 and the supporting structure 220, the rear part of the sewage guiding section 131 and the clamping boss 133 can be set to abut against the top of the supporting structure 220.
[0049] In some embodiments, the bottom surface of the rear part of the sewage guiding section 131 is set as a flat surface, and at least a part of the top surface of the supporting structure 220 is set as a flat surface. The bottom surface of the rear part of the sewage guiding section 131 is in stable contact with the top surface of the supporting structure 220, and the supporting structure 220 can provide effective support to the sewage discharging pipe 130. Or, in other embodiments, the bottom surface of the rear part of the sewage guiding section 131 is set as a curved surface, and at least a part of the top surface of the supporting structure 220 is set as a curved surface. The bottom surface of the rear end of the sewage guiding section 131 is in stable contact with the top surface of the supporting structure 220 and can be mutually limited in the horizontal plane, and the supporting structure 220 can provide effective support to the sewage discharging pipe 130.
[0050] Further, a part of the sewage guiding section 131 gradually extends upward from front to back to form a rising portion 1311. The rear end of the rising portion 1311 is communicated with the upper end of the sewage discharging section 132, that is, the upper end of the sewage discharging section 132 is connected to the highest point of the sewage guiding section 131. Since the sewage discharging section 132 extends downward, an anti-siphon structure can be formed between the rear part of the sewage guiding section 131 and the sewage discharging section 132, ensuring the sewage discharging effect of the toilet; in addition, at least a part of the bottom of the rising portion 1311 abuts against the top of the supporting structure 220, so that the height change area of the sewage discharging pipe 130 is supported by the supporting structure 220 to prevent the sewage discharging pipe 130 from collapsing.
[0051] It can be understood that the rising part 1311 has a tendency to extend upward from front to back, and the sewage discharge section 132 is connected to the rear end of the rising part 1311 and extends downward. Then, the sewage discharge pipe 130 bulges at the connection position between the rising part 1311 and the sewage discharge section 132, and both the sewage discharge section 132 and the rising part 1311 are effectively supported by the support structure 220, which can reduce the risk of collapse at the connection position between the two.
[0052] In addition, the bottom of a part of the sewage guiding section 131 bulges downward to form a support protrusion 1312. The support protrusion 1312 abuts against the top of the support structure 220. The thickness of the sewage guiding section 131 at the support protrusion 1312 is relatively large, which improves the structural strength of the sewage discharge pipe 130 and reduces the probability of deformation and collapse of the sewage discharge pipe 130. Moreover, the support protrusion 1312 can be adapted to the top surface of the support structure 220, so that the sewage guiding section 131 has a sufficient contact area with the top surface of the support structure 220, and the sewage guiding section 131 can be effectively supported by the support structure 220.
[0053] Furthermore, a first support portion 222 and a second support portion 223 located at the front end of the first support portion 222 are provided on the top of the support structure 220. The first support portion 222 is horizontal, and the second support portion 223 is inclined downward relative to the first support portion 222. The sewage discharge section 132 is inserted into the first support portion 222, and the clamping boss 133 abuts against the top of the first support portion 222. The bottom of the sewage guiding section 131 abuts against the top of the second support portion 223. The inclined second support portion 223 can provide an obliquely upward supporting force to the sewage guiding section 131, and the second support portion 223 provides a forward limiting effect to the sewage guiding section 131. At the same time, the sewage discharge section 132 is inserted into the first support portion 222 and is mutually limited with the first support portion 222 in the horizontal plane. The cooperation of the first support portion 222 and the second support portion 223 can provide stable support to the sewage discharge section 132 and improve the assembly accuracy of the toilet main body 100 and the periphery 200.
[0054] It can be understood that for the case where the support protrusion 1312 is provided at the bottom of the sewage guiding section 131, the support protrusion 1312 abuts against the top of the second support portion 223, and the clamping boss 133 abuts against the top of the first support portion 222. The support protrusion 1312 is connected to the clamping boss 133, which can improve the overall structural strength of the sewage discharge pipe 130 and facilitate the grouting molding of the toilet main body 100.
[0055] In addition, as Figure 2 and Figure 3, at least a part of the sewage guiding section 131 is located at the rear side of the bile bag 110 and extends upward from front to back to form a rising part 1311. The toilet body 100 further includes a first strengthening structure 150. The first strengthening structure 150 is connected between the top of the rising part 1311 and the rear side of the bile bag 110. That is, one side of the first strengthening structure 150 is connected to the rear side of the bile bag 110, and the other side is connected to the top of the rising part 1311. The first strengthening structure 150 can strengthen the strength of both the bile bag 110 and the sewage discharge pipe 130 at the same time, playing a role in preventing the toilet body 100 from deforming and cracking.
[0056] Understandably, the bile bag 110 includes a water guiding wall 111 located at the bottom of the seat ring 120, a cleaning wall 112 located below the water guiding wall 111, and a bile tip 113 located below the cleaning wall 112. The front end of the sewage discharge pipe 130 is connected to the bile tip 113, and the inner surface of the cleaning wall 112 forms a cleaning surface; after the water flow enters the bile bag 110, it swirls on the surface of the water guiding wall 111, and then swirls and flushes the dirt on the cleaning surface, and then flows into the bile tip 113 and finally is discharged from the sewage discharge pipe 130. The first strengthening structure 150 is connected to the bottom of the rear side of the seat ring 120, the rear side of the water guiding wall 111, and the rear side of the cleaning wall 112, so that the entire bile bag 110 is structurally strengthened, further improving the structural strength of the bile bag 110.
[0057] A second installation cavity 224 is provided inside the support structure 220. The installation hole 221 communicates with the second installation cavity 224. Part of the sewage discharge section 132 is inserted into the second installation cavity 224 through the installation hole 221. An opening 225 communicating with the second installation cavity 224 is provided at the front end of the support structure 220. The second installation cavity 224 provides an installation space for the water discharge pipe fitting 300. The rear end of the water discharge pipe fitting 300 is connected to the lower end of the sewage discharge section 132. The water discharge pipe fitting 300 extends to the outside of the support structure 220 through the opening 225 and discharges the dirt discharged from the sewage discharge section 132.
[0058] In addition, the thickness of the part of the support structure 220 in the circumferential direction of the opening 225 can be increased to strengthen the overall support strength of the support structure 220 and at the same time improve the strength of the outer periphery 200 green body. The installation hole 221 is set as a circular hole, and the sewage discharge section 132 is set as a circular pipe to facilitate the assembly of the water discharge pipe fitting 300 and the sewage discharge section 132.
[0059] Such as Figure 3 , a convex structure 114 protruding outward is provided outside the water guiding wall 111 of the bile bag 110, and a block is bonded at the corresponding position on the inner wall of the skirt 210. After the toilet body 100 is assembled with the outer periphery 200, the convex structure 114 is supported by the block to improve the overall stability of the green body and prevent the green body from collapsing during the drying and firing processes.
[0060] Refer to Figure 4, in the present utility model, the skirt 210 is arranged at the front part of the periphery 200, the support structure 220 is arranged at the rear part of the periphery 200, the periphery 200 further includes a support retaining wall 230, the support retaining wall 230 extends vertically as a whole, the support retaining wall 230 is located between the skirt 210 and the support structure 220, and is used to connect the skirt 210 and the support retaining wall 230 into one body. The rear side of the skirt 210 is in an open state and forms two ends, and each end is connected to a support retaining wall 230; the periphery 200 further includes a second strengthening structure 240, the second strengthening structure 240 is connected to the top of the support structure 220 and the rear side of the support retaining wall 230, so that each component within the periphery 200 is connected into one body. The support retaining wall 230 and the support structure 220 support each other through the second strengthening structure 240, so that the structures of the support structure 220 and the support retaining wall 230 are strengthened, and the deformation of the support retaining wall 230 can be prevented.
[0061] It should be noted that the above-mentioned "vertical direction" only indicates that the corresponding component has a tendency to extend up and down, and is not strictly limited to being perpendicular to the horizontal plane.
[0062] Furthermore, the second strengthening structure 240 is triangular as a whole. The first side of the second strengthening structure 240 is connected to the support retaining wall 230, the second side is connected to the support structure 220, and both ends of the third side of the second strengthening structure 240 are respectively connected to the support retaining wall 230 and the support structure 220, and this side is thickened or the projection of this side in the horizontal plane is set as a "T" shape, so that the second strengthening structure 240 can provide sufficient strength support to the support retaining wall 230 and the support structure 220. In addition, one end of the third side of the second strengthening structure 240 is connected to the top of the support retaining wall 230, and the other end is connected to the first support portion 222 of the support structure 220. On the one hand, the contact area between the second side and the support structure 220 is enlarged, and the first support portion 222 is in a horizontal state, so that the support structure 220 provides stable support to the second strengthening structure 240. On the other hand, the upper end of the support retaining wall 230 is supported by the second strengthening structure 240, and the deformation of the support retaining wall 230 can be effectively prevented.
[0063] In addition, there are two support retaining walls 230, and the two support retaining walls 230 are respectively connected to the two rear ends of the skirt 210. The two support retaining walls 230 are arranged at intervals, and each support retaining wall 230 is connected to a second strengthening structure 240. The sewage pipe 130 is located between the two support retaining walls 230 and the two second strengthening structures 240. The sewage pipe 130 passes through between the two ends at the rear side of the skirt 210, and then extends to the support structure 220 and cooperates with the support structure 220 for support. The support retaining wall 230 shields and positions the sewage pipe 130, so that the sewage discharge section 132 can be precisely matched with the support structure 220.
[0064] The supporting retaining wall 230 includes a first retaining wall 231 and a second retaining wall 232. The first retaining wall 231 is connected to the rear end of the skirt 210. The second retaining wall 232 is connected to the rear end of the first retaining wall 231 and is protruded toward the sewage pipe 130 relative to the first retaining wall 231. The second reinforcing structure 240 is connected to the rear side of the second retaining wall 232 and the top of the supporting structure 220, which is conducive to reducing the overall volume of the toilet. In addition, the first retaining wall 231 is set as a single-sided slurry structure and is lower than the skirt 210. The top surface of the first retaining wall 231, that is, the interior of the first retaining wall 231 has a cavity, and the first retaining wall 231 is formed by a single-sided slurry process to improve the supporting strength of the outer periphery 200 and reduce the probability of deformation, and the first retaining wall 231 is lower than the top surface of the skirt 210, so that the first retaining wall 231 does not contact the connecting portion 121, ensuring that the bonding position has only a double-sided slurry structure, so that the hardness and humidity of each bonding position are completely consistent during bonding, avoiding bonding defects caused by inconsistent hardness and humidity of the blank, and improving the production yield of the toilet.
[0065] In addition, if Figure 2 A foot 212 is provided at the bottom of the front side of the skirt 210, and the foot 212 is set to a single-sided slurry structure with a cavity to improve the overall structural strength of the toilet, and the remaining parts are set to a double-sided slurry structure; most of the structures of the toilet body 100 and the periphery 200 are double-sided slurry structures, and only the water inlet pipe and the sewage pipe 130 of the toilet body 100 are set to single-sided slurry structures, and only the foot 212 and the supporting retaining wall 230 of the periphery 200 are set to single-sided slurry structures. There are few single-sided slurry structures in the toilet, which can reduce the problem of single- and double-sided slurry cracks at the junction of the single and double slurry bodies caused by different curing time of the single- and double-sided slurry bodies, and there are many double-sided slurry structures in the toilet, which can ensure that the thickness and strength of each part in the toilet are consistent, thereby improving the overall quality of the toilet.
[0066] The embodiments of the utility model are described in detail above in conjunction with the accompanying drawings, but the utility model is not limited to the above embodiments. Various changes can be made within the knowledge of ordinary technicians in the relevant technical field without departing from the purpose of the utility model. In addition, the embodiments of the utility model and the features in the embodiments can be combined with each other without conflict.
Claims
1. Split toilet, characterized in that, Comprising: A toilet main body, including a bladder package, a seat ring and a sewage discharge pipe. The seat ring is connected to the top of the bladder package, and a part of the seat ring protrudes outward from the bladder package to form a connection part. The sewage discharge pipe includes a sewage guiding section and a sewage discharging section connected to the rear end of the sewage guiding section. The front end of the sewage guiding section communicates with the inner cavity of the bladder package, the sewage discharging section extends downward, and a clamping boss is provided on the periphery of the sewage discharging section; An outer periphery, including a skirt and a support structure connected to the rear side of the skirt. A first installation cavity is provided inside the skirt. At least a part of the bladder package is accommodated in the first installation cavity. The bottom surface of the connection part is bonded to the top surface of the skirt. The sewage discharging section is inserted into the support structure, and the clamping boss abuts against the top of the support structure; Wherein, the toilet main body and the outer periphery are integrally formed respectively.
2. The split toilet according to claim 1, characterized in that, At least a part of the bottom of the sewage guiding section abuts against the top of the support structure.
3. The split toilet according to claim 2, wherein, A part of the sewage guiding section gradually extends upward from front to back to form a rising part. The rear end of the rising part communicates with the upper end of the sewage discharging section. At least a part of the bottom of the rising part abuts against the top of the support structure; And / or, a part of the bottom of the sewage guiding section protrudes downward to form a support protrusion, and the support protrusion abuts against the top of the support structure.
4. The split toilet according to claim 3, wherein The top of the support structure is provided with a first support part and a second support part located at the front end of the first support part. The first support part is horizontal, the second support part is inclined downward relative to the first support part. The sewage discharging section is inserted into the first support part, the clamping boss abuts against the top of the first support part, and the bottom of the sewage guiding section abuts against the top of the second support part.
5. The split toilet according to claim 1, characterized in that, At least a part of the sewage guiding section is located at the rear side of the bladder package and extends upward from front to back to form a rising part. The toilet main body further includes a first strengthening structure, and the first strengthening structure is connected between the top of the rising part and the rear side of the bladder package.
6. The split toilet according to claim 1, wherein, The outer periphery further includes a support retaining wall and a second strengthening structure. The support retaining wall is connected to the rear end of the skirt and extends vertically. The support structure is located at the rear side of the support retaining wall. The second strengthening structure is connected between the top of the support structure and the rear side of the support retaining wall.
7. The split toilet according to claim 6, wherein The support retaining wall includes a first retaining wall and a second retaining wall. The first retaining wall is connected to the rear end of the skirt. The second retaining wall is connected to the rear end of the first retaining wall and protrudes towards the sewage discharge pipe relative to the first retaining wall. The second strengthening structure is connected between the rear side of the second retaining wall and the top of the support structure. The first retaining wall is set as a single-sided pulp structure and is lower than the top surface of the skirt.
8. The split toilet according to claim 6, characterized in that, There are two support retaining walls. The two support retaining walls are respectively connected to the two rear ends of the skirt. The two support retaining walls are arranged at intervals. Each support retaining wall is connected with the second strengthening structure. The sewage discharge pipe is located between the two support retaining walls and the two second strengthening structures.
9. The split toilet according to claim 1, characterized in that, There is a gap between the inner surface of the skirt and the outer surface of the bladder package; And / or, a reinforcing portion is provided at the junction of the seat ring and the bladder bag, the reinforcing portion protrudes toward the skirt, and there is a gap between the reinforcing portion and the inner surface of the skirt.
10. The split toilet according to claim 1, characterized in that, A second installation cavity is provided inside the support structure, an opening communicating with the second installation cavity is provided at the front end of the support structure, and a part of the sewage discharge section is inserted into the second installation cavity.