Mobile integral bathroom water circulation system

By designing a mobile integrated bathroom water circulation system, the water recycling is realized, and the problem of waste of water resources in traditional bathroom displays is solved, and the flexibility and convenience of demonstration activities are improved.

CN223119156UActive Publication Date: 2025-07-18GUANGDONG LANGZHUYUAN ENGINEERING TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422317181.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2025-07-18
Estimated Expiration
2034-09-23

AI Technical Summary

Technical Problem

Traditional bathroom display activities require reliance on on-site water sources and drainage pipeline systems, resulting in increased waste of water resources and difficulty in placement, especially in temporary or outdoor occasions, installation of drainage pipelines is complicated and expensive.

Method used

Design a mobile integrated bathroom water circulation system, including a water tank, a recycling part and a conveying part, to realize the recycling of water, and recycle the used water into the water tank through the water pump and the connecting pipeline, and transport the water in the water tank to the bathroom structure for use.

Benefits of technology

Significantly reduce water waste, improve the flexibility and convenience of demonstration activities, and eliminate the need to rely on on-site drainage piping systems, suitable for temporary or outdoor occasions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223119156U_ABST
    Figure CN223119156U_ABST
Patent Text Reader

Abstract

The utility model provides a movable integral bathroom water circulation system, and relates to the technical field of bathroom water circulation, the movable integral bathroom water circulation system comprises a movable bathroom, a bathroom structure is arranged in the movable bathroom, a floor drain is further arranged in the movable bathroom, a water circulation component is arranged between the floor drain and the structure, and the water circulation component comprises a water tank. A recycling part is arranged between the water tank and the floor drain, and a conveying part is arranged between the water tank and the bathroom structure. According to the application, the water circulation component and the water tank are used for storing water, the conveying part is used for conveying water in the water tank to the bathroom structure for use in demonstration of the bathroom structure, and the recycling part can recycle the water used in the demonstration process into the water tank to realize water circulation, so that the waste of water resources is greatly reduced; the bathroom demonstration device can be conveniently moved to a place where bathroom demonstration or demonstration needs to be carried out without depending on an on-site drainage pipeline system, and the flexibility and convenience of demonstration activities are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bathroom water circulation, and more specifically, to a mobile integrated bathroom water circulation system. Background Art

[0002] Traditional bathroom display activities usually rely on on-site water sources and drainage pipe systems. This means that during the display process, a large amount of clean water is consumed for each demonstration, and the generated wastewater needs to be immediately discharged into the on-site drainage pipes. This method not only causes a great waste of water resources but also increases the difficulty and cost of on-site layout because the demonstration site must have complete water supply and drainage facilities. In addition, for certain specific occasions, such as temporarily built display spaces or outdoor environments, finding and installing suitable drainage pipes is a complex and expensive project. Therefore, we made improvements and proposed a mobile integrated bathroom water circulation system. Summary of the Invention

[0003] The purpose of the utility model is to address the problem of water resource waste during the demonstration of current bathroom products.

[0004] To achieve the above-mentioned invention purpose, the utility model provides a mobile integrated bathroom water circulation system to improve the above problems.

[0005] Specifically, this application is as follows:

[0006] A mobile integrated bathroom water circulation system includes a mobile bathroom, in which a bathroom structure is arranged. A floor drain is also arranged in the mobile bathroom. A water circulation component is arranged between the floor drain and the structure. The water circulation component includes a water tank. A recovery part is arranged between the water tank and the floor drain, and a conveying part is arranged between the water tank and the bathroom structure.

[0007] As a preferred technical solution of this application, the recovery part includes a first water pump. A fourth connecting pipe is connected between the first water pump and the water tank, and a third connecting pipe is connected to the water inlet end of the first water pump.

[0008] As a preferred technical solution of this application, the recovery part further includes a first connecting pipe connected to the floor drain. The first connecting pipe is connected to a second connecting pipe, and the end of the third connecting pipe far from the first water pump is inserted into the second connecting pipe.

[0009] As a preferred technical solution of this application, the conveying part includes a fifth connecting pipe connected to the water tank. The fifth connecting pipe is connected to a second water pump. The second water pump is connected to a sixth connecting pipe, and the sixth connecting pipe is connected to the bathroom structure.

[0010] As a preferred technical solution of the present application, the bathroom structure includes a toilet installed in the mobile bathroom, and the discharge end of the toilet is connected to the second connecting pipe.

[0011] As a preferred technical solution of the present application, a seventh connecting pipe is connected between the toilet and the sixth connecting pipe.

[0012] As a preferred technical solution of the present application, the bathroom structure further includes a shower head installed in the mobile bathroom, and an eighth connecting pipe is connected between the shower head and the sixth connecting pipe.

[0013] As a preferred technical solution of the present application, the mobile bathroom includes a chassis, the toilet and the floor drain are both installed on the chassis, and a plurality of supports are installed at the bottom of the chassis.

[0014] As a preferred technical solution of the present application, a side plate is installed on the back of the chassis, back plates are installed on both sides of the chassis, and a top plate is installed between the tops of the back plates and the side plate.

[0015] As a preferred technical solution of the present application, reinforcing frames are installed on the outer sides of the top plate, the back plates and the side plate.

[0016] Compared with the prior art, the beneficial effects of the present utility model are:

[0017] In the solution of the present application:

[0018] In order to solve the problem of wasting water resources during the demonstration of bathroom products in the prior art, in the present application, through the provided water circulation components, the water tank is used for storing water, the conveying part is used to convey the water in the water tank to the bathroom structure for use during the demonstration of the bathroom structure, and the recycling part can recycle the water used during the demonstration back to the water tank to realize water circulation, greatly reducing water resource waste; the present application can be conveniently moved to the location where bathroom display or demonstration is required, without relying on the on-site drainage pipe system, improving the flexibility and convenience of the demonstration activity. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic structural diagram of the mobile integrated bathroom water circulation system provided by the present application;

[0020] Figure 2 It is a schematic structural diagram of the shower head of the mobile integrated bathroom water circulation system provided by the present application;

[0021] Figure 3 It is a front view structural diagram of the mobile integrated bathroom water circulation system provided by the present application;

[0022] Figure 4 It is a bottom view structural diagram of the mobile integrated bathroom water circulation system provided by the present application;

[0023] Figure 5 The rear view structural schematic diagram of the mobile integrated bathroom water circulation system provided for this application.

[0024] Indications in the figure:

[0025] 1. Mobile bathroom; 101. Chassis; 102. Side plate; 103. Rear plate; 104. Top plate; 105. Support; 106. Reinforcement frame;

[0026] 2. Toilet;

[0027] 3. Shower head;

[0028] 4. Floor drain; 401. First connecting pipe; 402. Second connecting pipe; 403. Water tank; 404. Third connecting pipe; 405. Fourth connecting pipe; 406. First water pump; 407. Fifth connecting pipe; 408. Second water pump; 409. Sixth connecting pipe; 410. Seventh connecting pipe; 411. Eighth connecting pipe. Detailed implementation manners

[0029] In order to enable those skilled in the art to better understand the solution of this utility model, the technical solutions in the embodiments of this utility model will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of this utility model. Obviously, the described embodiments are only a part of the embodiments of this utility model, rather than all of the embodiments. Based on the embodiments of this utility model, all other embodiments obtained by those of ordinary skill in the art without making creative efforts shall fall within the protection scope of this utility model.

[0030] As recorded in the background art, traditional bathroom display activities usually rely on on-site water sources and drainage pipe systems. This means that during the display process, a large amount of clean water is consumed for each demonstration, and the generated wastewater needs to be immediately discharged into the on-site drainage pipes. This method not only causes great waste of water resources, but also increases the difficulty and cost of on-site layout, because the demonstration site must have perfect water supply and drainage facilities. In addition, for certain specific occasions, such as temporarily built display spaces or outdoor environments, finding and installing suitable drainage pipes is a complex and expensive project.

[0031] To solve this technical problem, this utility model provides a mobile integrated bathroom water circulation system.

[0032] Specifically, please refer to Figures 1 - 5 , the mobile integrated bathroom water circulation system specifically includes:

[0033] Mobile bathroom 1 is provided with a bathroom structure inside. A floor drain 4 is also provided inside the mobile bathroom 1. A water circulation component is arranged between the floor drain 4 and the structure. The water circulation component includes a water tank 403. A recovery part is arranged between the water tank 403 and the floor drain 4, and a conveying part is arranged between the water tank 403 and the bathroom structure.

[0034] The mobile integrated bathroom water circulation system provided by the present utility model. Through the arranged water circulation component, the water tank 403 is used for storing water, and the conveying part is used to convey the water in the water tank 403 to the bathroom structure for use during the demonstration of the bathroom structure. The recovery part can recover the water used during the demonstration process back to the water tank 403 to realize water circulation, greatly reducing water resource waste. This application can be conveniently moved to the location where bathroom display or demonstration is needed without relying on the on-site drainage pipe system, improving the flexibility and convenience of the demonstration activity.

[0035] In order to enable those skilled in the art to better understand the solution of the present utility model, the technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings.

[0036] It should be noted that, without conflict, the embodiments in the present utility model and the features and technical solutions in the embodiments can be combined with each other.

[0037] It should be noted that similar reference numerals and letters denote similar items in the following drawings. Therefore, once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings.

[0038] Example 1, please refer to Figures 1 - 5 The mobile integrated bathroom water circulation system includes a mobile bathroom 1. A bathroom structure is provided inside the mobile bathroom 1. A floor drain 4 is also provided inside the mobile bathroom 1. A water circulation component is arranged between the floor drain 4 and the structure. The water circulation component includes a water tank 403. A recovery part is arranged between the water tank 403 and the floor drain 4, and a conveying part is arranged between the water tank 403 and the bathroom structure. Through the arranged water circulation component, the water tank 403 is used for storing water, and the conveying part is used to convey the water in the water tank 403 to the bathroom structure for use during the demonstration of the bathroom structure. The recovery part can recover the water used during the demonstration process back to the water tank 403 to realize water circulation, greatly reducing water resource waste. This application can be conveniently moved to the location where bathroom display or demonstration is needed without relying on the on-site drainage pipe system, improving the flexibility and convenience of the demonstration activity.

[0039] Further, as Figure 1As shown in the figure, the recycling section includes a first water pump 406. A fourth connecting pipe 405 is connected between the first water pump 406 and the water tank 403. The water inlet end of the first water pump 406 is connected with a third connecting pipe 404. The first water pump 406 can transport the recycled water into the water tank 403 through the fourth connecting pipe 405.

[0040] Further, as Figure 1 and Figure 4 shown in the figure, the recycling section further includes a first connecting pipe 401 connected to the floor drain 4. The first connecting pipe 401 is connected with a second connecting pipe 402. One end of the third connecting pipe 404 away from the first water pump 406 is inserted into the second connecting pipe 402. The water generated during the demonstration process in the mobile bathroom 1 flows from the floor drain 4 into the second connecting pipe 402. The first water pump 406 can pump the water in the second connecting pipe 402 into the fourth connecting pipe 405 through the third connecting pipe 404 and store it in the water tank 403 through the fourth connecting pipe 405.

[0041] Embodiment 2 further optimizes the mobile integrated bathroom water circulation system provided in Embodiment 1. Specifically, as Figure 1 and Figure 5 shown in the figure, the conveying section includes a fifth connecting pipe 407 connected to the water tank 403. The fifth connecting pipe 407 is connected with a second water pump 408. The second water pump 408 is connected with a sixth connecting pipe 409. The sixth connecting pipe 409 is connected to the bathroom structure. The second water pump 408 can transport the water in the water tank 403 to the bathroom equipment through the fifth connecting pipe 407 and the sixth connecting pipe 409 for use during the demonstration of the bathroom equipment.

[0042] Further, as Figure 1 and Figure 4 shown in the figure, the bathroom structure includes a toilet 2 installed in the mobile bathroom 1. The discharge end of the toilet 2 is connected to the second connecting pipe 402. The water discharged from the toilet 2 is recycled by the second connecting pipe 402. It should be noted that the toilet 2 is not actually used during the demonstration, so there is no urine or feces. Therefore, the water generated during the demonstration of the toilet 2 can be directly recycled.

[0043] Further, as Figure 1 and Figure 5 shown in the figure, a seventh connecting pipe 410 is connected between the toilet 2 and the sixth connecting pipe 409. The setting of the seventh connecting pipe 410 enables the sixth connecting pipe 409 to transport water to the toilet 2.

[0044] Further, as Figure 2 and Figure 5 shown in the figure, the bathroom structure further includes a shower head 3 installed in the mobile bathroom 1. An eighth connecting pipe 411 is connected between the shower head 3 and the sixth connecting pipe 409. The setting of the eighth connecting pipe 411 enables the sixth connecting pipe 409 to transport water to the shower head 3.

[0045] Example 3, the mobile integrated bathroom water circulation system provided in Example 1 or 2 is further optimized, specifically, as follows Figure 1 As shown, the mobile bathroom 1 includes a chassis 101 , the toilet 2 and the floor drain 4 are mounted on the chassis 101 , and a plurality of supports 105 are mounted at the bottom of the chassis 101 , and the supports 105 can support the mobile bathroom 1 .

[0046] Further, such as Figure 1 As shown, a side panel 102 is installed on the back of the chassis 101, a back panel 103 is installed on both sides of the chassis 101, a top panel 104 is installed between the back panel 103 and the top of the side panel 102, and the chassis 101, the side panels 102, the back panel 103 and the top panel 104 are connected by bolts. Specifically, the bottom of the side panels 102 and the back panel 103 are connected to the top of the chassis 101 by bolts, the top of the side panels 102 and the back panel 103 are connected to the bottom of the top panel 104 by bolts, and the back panel 103 is also connected to the side edges of the side panels 102 by bolts. This arrangement allows the various components that make up the mobile bathroom 1 to be disassembled and assembled, which is convenient for movement and transportation.

[0047] Further, such as Figure 1 As shown, reinforcement frames 106 are installed on the outer sides of the top plate 104 , the back plate 103 and the side plates 102 . The provision of the reinforcement frames 106 can improve the structural strength of the top plate 104 , the back plate 103 and the side plates 102 .

[0048] The use process of the mobile integrated bathroom water circulation system provided by the utility model is as follows:

[0049] The second water pump 408 transports the water in the water tank 403 to the sixth connecting pipe 409 through the fifth connecting pipe 407, the sixth connecting pipe 409 transports the water to the shower head 3 through the eighth connecting pipe 411, and the sixth connecting pipe 409 transports the water to the toilet 2 through the seventh connecting pipe 410. The water generated during the demonstration of the shower head 3 flows into the second connecting pipe 402 from the floor drain 4, and the water discharged from the toilet 2 also flows into the second connecting pipe 402. The first water pump 406 pumps the water in the second connecting pipe 402 into the fourth connecting pipe 405 through the third connecting pipe 404 and transports it to the water tank 403 for storage, so as to realize water circulation.

[0050] In the present utility model, unless otherwise clearly specified and defined, terms such as "installation", "connection", "linkage", "fixation" and the like shall be understood in a broad sense. For example, it may be a fixed connection, a detachable connection or an integral body; it may be a mechanical connection, an electrical connection or communication with each other; it may be a direct connection or an indirect connection through an intermediate medium, and it may be the internal communication between two components or the interaction relationship between two components, unless otherwise clearly defined. For those of ordinary skill in the art, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0051] Obviously, the embodiments described above are only a part of the embodiments of the present utility model, rather than all of the embodiments. The preferred embodiments of the present utility model are given in the drawings, but do not limit the patent scope of the present utility model. The present utility model can be implemented in many different forms. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosed content of the present utility model more thorough and comprehensive. Although the present utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing specific embodiments, or perform equivalent substitution on some of the technical features. Any equivalent structure made by using the specification and drawings of the present utility model, directly or indirectly applied in other related technical fields, shall be within the scope of the patent protection of the present utility model by the same token.

Claims

1. Mobile integral bathroom water circulation system, characterized in that, It includes a mobile bathroom (1) with a bathroom structure arranged therein. A floor drain (4) is also arranged in the mobile bathroom (1). A water circulation component is arranged between the floor drain (4) and the structure. The water circulation component includes a water tank (403). A recovery part is arranged between the water tank (403) and the floor drain (4), and a conveying part is arranged between the water tank (403) and the bathroom structure.

2. The mobile integrated bathroom water circulation system according to claim 1, characterized in that, The recovery part includes a first water pump (406). A fourth connecting pipe (405) is connected between the first water pump (406) and the water tank (403). The water inlet end of the first water pump (406) is connected with a third connecting pipe (404).

3. The mobile integrated bathroom water circulation system according to claim 2, characterized in that The recovery part further includes a first connecting pipe (401) connected to the floor drain (4). The first connecting pipe (401) is connected with a second connecting pipe (402). One end of the third connecting pipe (404) far away from the first water pump (406) is inserted into the second connecting pipe (402).

4. The mobile integrated bathroom water circulation system according to claim 1, characterized in that, The conveying part includes a fifth connecting pipe (407) connected to the water tank (403). The fifth connecting pipe (407) is connected with a second water pump (408). The second water pump (408) is connected with a sixth connecting pipe (409), and the sixth connecting pipe (409) is connected with the bathroom structure.

5. The mobile integral bathroom water circulation system according to claim 4, characterized in that, The bathroom structure includes a toilet (2) installed in the mobile bathroom (1). The discharge end of the toilet (2) is connected with the second connecting pipe (402).

6. The mobile integrated bathroom water circulation system according to claim 5, characterized in that, A seventh connecting pipe (410) is connected between the toilet (2) and the sixth connecting pipe (409).

7. The mobile integrated bathroom water circulation system according to claim 6, characterized in that The bathroom structure further includes a shower head (3) installed in the mobile bathroom (1). An eighth connecting pipe (411) is connected between the shower head (3) and the sixth connecting pipe (409).

8. The mobile integrated bathroom water circulation system according to claim 7, characterized in that, The mobile bathroom (1) includes a chassis (101). The toilet (2) and the floor drain (4) are both installed on the chassis (101). A plurality of supports (105) are installed at the bottom of the chassis (101).

9. The mobile integral bathroom water circulation system according to claim 8, characterized in that, A side plate (102) is installed on the back of the chassis (101). Back plates (103) are installed on both sides of the chassis (101). A top plate (104) is installed between the tops of the back plates (103) and the side plate (102).

10. The mobile integral bathroom water circulation system according to claim 9, characterized in that, Reinforcing frames (106) are installed on the outer sides of the top plate (104), the back plates (103), and the side plate (102).