Rapid wall building device for building construction

By designing fixing components and scraping components, the problem of inconsistent thickness of cement mortar is solved, rapid fixation of bricks and uniform paving of cement mortar are achieved, and the quality and efficiency of wall building are improved.

CN223293418UActive Publication Date: 2025-09-02安徽凯隆建筑工程有限公司
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202422596250.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2025-09-02
Estimated Expiration
2034-10-25

AI Technical Summary

Technical Problem

The existing wall building device is not convenient to smooth and compact the poured cement mortar, resulting in inconsistent thickness of the cement mortar on the bricks, affecting the quality and beauty of the brick wall.

Method used

The combination design of fixing components, scraping components and positioning components is adopted, including vertical plates, screw rods, knob nuts, adjustment rods, scraping rods and plywood, so as to achieve the fixation of bricks, smoothing of cement mortar and position restrictions.

Benefits of technology

It realizes rapid fixation of bricks and uniform paving of cement mortar, improves the quality and efficiency of wall building, and ensures the unified and beautiful appearance of brick walls.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223293418U_ABST
    Figure CN223293418U_ABST
Patent Text Reader

Abstract

The utility model discloses a building construction rapid wall building device which comprises two transverse plates, L-shaped clamping plates are installed on the tops of the two transverse plates in a sliding mode, fixing assemblies used for installing the device are arranged on the two transverse plates, and positioning assemblies used for positioning bricks are arranged on the fixing assemblies. The fixing assembly is further provided with a scraping assembly for trowelling cement mortar, the fixing assembly comprises two vertical plates, two lead screws and four knob nuts, and the two vertical plates are fixedly installed at the tops of the two transverse plates respectively and are symmetrically distributed. According to the utility model, the design is reasonable, the two transverse plates can be conveniently erected on the bricks and fixed, the installation is convenient, the positions of the bricks are limited and restrained, the time for aligning the bricks is shortened, the wall building efficiency is improved, and after the bricks are placed, the paved cement mortar can be conveniently flattened, the mortar thickness is unified, and the wall building quality is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of wall construction, in particular to a rapid wall construction device for building construction. Background Art

[0002] Masonry is building walls. The strongest way to build walls is to lay them up piece by piece. When building walls, most owners still choose conventional masonry construction methods as before. The walls of houses built in this way can act as a temperature buffer, thereby ensuring that the indoor temperature and humidity are moderate. In addition, the thick brick walls also ensure good sound insulation.

[0003] A building wall construction device, as disclosed in the Chinese patent announcement with the publication number CN220434279U, has the following technical features: it includes a feed port; an outer cover structure, the feed port is fixed to one end of the surface of the outer cover structure, the outer cover structure includes an outer shell, a slide groove, a first limit groove, a second limit groove and a movable groove; a drive structure, the drive structure is installed inside the outer shell; a pad structure, the pad structure is installed inside the movable groove; a transmission structure, the transmission structure is fixed to the inner side wall of the movable groove; and a partition structure, the partition structure is fixed to the inner side wall of the outer shell.

[0004] In actual operation, it was found that the above solution still has at least the following defects: the device is inconvenient to smooth and compact the poured cement mortar, which easily leads to inconsistent thickness of cement mortar on bricks, affecting the quality and appearance of brick walls. Therefore, we propose a rapid wall-building device for construction to solve the above problems. Utility Model Content

[0005] (1) Technical problems solved

[0006] In response to the deficiencies of the existing technology, the utility model provides a rapid wall-building device for construction, which solves the problem that it is inconvenient to smooth and compact the poured cement mortar, which easily leads to inconsistent thickness of cement mortar on bricks and affects the quality and appearance of the brick wall.

[0007] (2) Technical solution

[0008] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a rapid wall-building device for construction, comprising two horizontal plates, both of which are slidably installed with L-shaped plywood on the top, and fixing components for installing the device provided on the two horizontal plates, positioning components for positioning bricks provided on the fixing components, and scraping components for smoothing cement mortar provided on the fixing components.

[0009] Preferably, the fixing assembly includes two vertical plates, two screw rods and four knob nuts. The two vertical plates are respectively fixedly installed on the top of the two horizontal plates and are symmetrically distributed. Two through holes are provided on the two vertical plates. The two screw rods are respectively slidably installed in the corresponding two through holes. The four knob nuts are respectively threadedly installed on the left and right ends of the two screw rods, and the four knob nuts are respectively in close contact with the corresponding vertical plates.

[0010] Preferably, limit blocks are fixedly installed on the left and right sides of the two screw rods.

[0011] Preferably, the scraper assembly includes two adjusting rods, a scraper rod and two guide blocks. Strip holes are opened on the two vertical plates. The two adjusting rods are slidably installed in the two strip holes respectively. The scraper rod is fixedly installed at one end of the two adjusting rods close to each other and in sliding contact with the two horizontal plates. The two guide blocks are fixedly installed on the two adjusting rods respectively, and the two guide blocks are in sliding contact with the two vertical plates respectively.

[0012] Preferably, the positioning assembly includes four screws, two splints and four handles. The four screws are respectively threadedly mounted on the two vertical plates and are symmetrically distributed in pairs. The two splints are respectively arranged at the ends of the four screws that are close to each other and are rotatably connected to the corresponding screws. The four handles are respectively fixedly mounted at the ends of the four screws that are away from each other.

[0013] Preferably, two symmetrically distributed adjustment slots are provided at the bottom of the two horizontal plates, and adjustment bolts are slidably installed in the four adjustment slots. The two L-shaped clamps are respectively mounted on the corresponding two adjustment bolts, and the bottom ends of the four adjustment bolts are threaded with adjustment nuts, and the four adjustment nuts are in close contact with the corresponding L-shaped clamps.

[0014] Preferably, handles are fixedly mounted on the bottoms of the two horizontal plates.

[0015] (3) Beneficial effects

[0016] The utility model provides a rapid wall-building device for construction, which has the following beneficial effects:

[0017] (1) This kind of rapid wall-building device for construction can conveniently set up and fix two horizontal plates on bricks by utilizing a fixing assembly composed of two vertical plates, two screw rods and four knob nuts, thereby facilitating installation and saving time.

[0018] (2) This kind of rapid wall-building device for construction utilizes a scraper assembly composed of two adjusting rods, a scraper rod and two guide blocks. After the bricks are placed, it is convenient to smooth the laid cement mortar, unify the mortar thickness, and improve the wall-building quality.

[0019] (3) This rapid wall-building device for construction can limit the position of bricks by utilizing a positioning assembly composed of four screws, two clamps and four handles, thereby reducing the time for aligning bricks and improving wall-building efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the three-dimensional structure of the utility model Figure 1 ;

[0021] Figure 2 This is a schematic cross-sectional view of the main view of the present invention;

[0022] Figure 3 for Figure 2 A magnified schematic diagram of part A;

[0023] Figure 4 This is a schematic diagram of the three-dimensional structure of the utility model Figure 2 .

[0024] In the figure: 1. horizontal plate; 2. L-shaped splint; 3. vertical plate; 4. through hole; 5. screw rod; 6. knob nut; 7. limit block; 8. strip hole; 9. adjustment rod; 10. scraper rod; 11. guide block; 12. screw rod; 13. splint; 14. handle; 15. adjustment slot; 16. adjustment bolt; 17. adjustment nut; 18. grip. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0026] like Figure 1-4 As shown, the utility model provides a technical solution: a rapid wall-building device for construction, comprising two horizontal plates 1, handles 18 are fixedly installed at the bottom of the two horizontal plates 1, L-shaped clamps 2 are slidably installed on the top of the two horizontal plates 1, and fixing components for installing the device are provided on the two horizontal plates 1, positioning components for positioning bricks are provided on the fixing components, and scraping components for smoothing cement mortar are also provided on the fixing components.

[0027] In this embodiment, the above-mentioned fixing assembly includes two vertical plates 3, two screw rods 5 and four knob nuts 6. The two vertical plates 3 are respectively fixedly installed on the top of the two horizontal plates 1 and are symmetrically distributed. Two through holes 4 are provided on the two vertical plates 3. The two screw rods 5 are respectively slidably installed in the corresponding two through holes 4. The four knob nuts 6 are respectively threaded on the left and right ends of the two screw rods 5. The four knob nuts 6 are respectively in close contact with the corresponding vertical plates 3. By utilizing the four knob nuts 6, the two vertical plates 3 can be constrained and fixed, and then the device can be clamped on the bricks. Limit blocks 7 are fixedly installed on the left and right sides of the two screw rods 5. The four limit blocks 7 are used to prevent the knob nuts 6 from slipping.

[0028] In this embodiment, the above-mentioned scraper assembly includes two adjusting rods 9, a scraper rod 10 and two guide blocks 11. Strip holes 8 are opened on the two vertical plates 3. The two adjusting rods 9 are slidably installed in the two strip holes 8 respectively. The scraper rod 10 is fixedly installed at one end of the two adjusting rods 9 close to each other and is in sliding contact with the two horizontal plates 1. The scraper rod 10 can be used to spread and smooth the laid cement mortar, unify the mortar thickness, and improve the quality of wall building. The two guide blocks 11 are fixedly installed on the two adjusting rods 9 respectively. The two guide blocks 11 are in sliding contact with the two vertical plates 3 respectively. The scraper rod 10 can be controlled to move forward and backward through the two guide blocks 11 to prevent the scraper rod 10 from tilting.

[0029] In this embodiment, the above-mentioned positioning assembly includes four screws 12, two splints 13 and four handles 14. The four screws 12 are respectively threadedly installed on the two vertical plates 3 and are symmetrically distributed in pairs. The two splints 13 are respectively arranged at the ends of the four screws 12 that are close to each other and are rotatably connected to the corresponding screws 12. The four handles 14 are respectively fixedly installed at the ends of the four screws 12 that are away from each other.

[0030] In this embodiment, the bottoms of the two horizontal plates 1 are each provided with two symmetrically distributed adjustment slots 15, and adjustment bolts 16 are slidably installed in the four adjustment slots 15. The two L-shaped clamps 2 are respectively mounted on the corresponding two adjustment bolts 16, and the bottom ends of the four adjustment bolts 16 are threadedly installed with adjustment nuts 17. The four adjustment nuts 17 are respectively in close contact with the corresponding L-shaped clamps 2. By using the adjustment bolts 16 and the adjustment nuts 17, the positions of the two L-shaped clamps 2 can be conveniently adjusted and fixed, and then the depth of the brick joints can be adjusted, thereby expanding the scope of application of the device.

[0031] Through the above structure, the utility model provides a fast wall-building device for construction, which can conveniently set up and fix the two horizontal plates 1 on the bricks, facilitate installation, and limit the position of the bricks, reduce the time of aligning the bricks, and improve the efficiency of wall-building. It can also be convenient to smooth the laid cement mortar after the bricks are placed, unify the mortar thickness, and improve the quality of wall-building. When used, according to the requirements of the brick joint depth, loosen the four adjusting nuts 17, adjust the two L-shaped clamping plates 2 to the corresponding depth position, tighten the four adjusting nuts 17, and put the two horizontal plates 1. On top of the brick, control the two L-shaped plywood 2 to press against each other, control the four knob nuts 6 to tighten in turn, so that the device is fixed on the top of the brick, and then according to the width of the brick, rotate the four screws 12 to make the distance between the two plywood 13 the width of the brick, lay cement mortar on the surface of the brick, and control the scraper rod 10 to move back and forth through the adjustment rod 9 to spread and smooth the cement mortar, unify the thickness of the cement mortar, improve the quality of wall construction, and then put multiple bricks between the two plywood 13 in turn, saving the time of aligning bricks and improving the efficiency of wall construction.

[0032] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any modifications or substitutions that can be easily conceived by a person skilled in the art within the technical scope of the present invention should be included within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be based on the scope of protection of the claims.

Claims

1. A rapid wall-building device for construction, characterized by: The device comprises two horizontal plates (1), the tops of the two horizontal plates (1) are both slidably mounted with L-shaped clamping plates (2), the two horizontal plates (1) are provided with fixing components for installing the device, the fixing components are provided with positioning components for positioning bricks, and the fixing components are also provided with scraping components for smoothing cement mortar.

2. A rapid wall-building device for construction according to claim 1, characterized in that: The fixing assembly comprises two vertical plates (3), two screw rods (5) and four knob nuts (6). The two vertical plates (3) are respectively fixedly mounted on the tops of the two horizontal plates (1) and are symmetrically distributed. Two through holes (4) are respectively provided on the two vertical plates (3). The two screw rods (5) are respectively slidably mounted in the corresponding two through holes (4). The four knob nuts (6) are respectively threadedly mounted on the left and right ends of the two screw rods (5). The four knob nuts (6) are respectively in close contact with the corresponding vertical plates (3).

3. A rapid wall-building device for construction according to claim 2, characterized in that: Limiting blocks (7) are fixedly installed on the left and right sides of the two screw rods (5).

4. A rapid wall-building device for construction according to claim 2, characterized in that: The scraper assembly comprises two adjusting rods (9), a scraper rod (10) and two guide blocks (11); the two vertical plates (3) are each provided with a strip hole (8); the two adjusting rods (9) are respectively slidably mounted in the two strip holes (8); the scraper rod (10) is fixedly mounted on one end of the two adjusting rods (9) close to each other and in sliding contact with the two horizontal plates (1); the two guide blocks (11) are respectively fixedly mounted on the two adjusting rods (9); and the two guide blocks (11) are respectively in sliding contact with the two vertical plates (3).

5. The rapid wall-building device for construction according to claim 2, characterized in that: The positioning assembly comprises four screw rods (12), two clamping plates (13) and four handles (14). The four screw rods (12) are respectively threadedly mounted on the two vertical plates (3) and are symmetrically distributed in pairs. The two clamping plates (13) are respectively arranged at one end of the four screw rods (12) close to each other and are rotatably connected to the corresponding screw rods (12). The four handles (14) are respectively fixedly mounted at one end of the four screw rods (12) away from each other.

6. A rapid wall-building device for construction according to claim 1, characterized in that: The bottoms of the two horizontal plates (1) are provided with two symmetrically distributed adjustment slots (15), and the four adjustment slots (15) are slidably installed with adjustment bolts (16). The two L-shaped clamping plates (2) are respectively sleeved on the corresponding two adjustment bolts (16), and the bottom ends of the four adjustment bolts (16) are threadedly installed with adjustment nuts (17), and the four adjustment nuts (17) are respectively in close contact with the corresponding L-shaped clamping plates (2).

7. The rapid wall-building device for construction according to claim 1, characterized in that: The bottoms of the two horizontal plates (1) are both fixedly mounted with handles (18).

Citation Information

Patent Citations

  • Building wall building construction device

    CN220434279U