Construction engineering construction safety management fence

Through the design of splicing mechanisms and moving components, the problems of time-consuming and labor-intensive fence splicing and inconvenient movement are solved, and fast splicing and convenient movement are achieved, thereby improving practicality.

CN223358883UActive Publication Date: 2025-09-19ORDOS CITY DONGSHENG DISTRICT URBAN MANAGEMENT COMPREHENSIVE ADMINISTRATIVE LAW ENFORCEMENT BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422830945.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-20
Publication Date
2025-09-19
Estimated Expiration
2034-11-20

AI Technical Summary

Technical Problem

Existing fences consume time and labor when splicing and are difficult to move, resulting in inconvenience in transfer and low practicality.

Method used

The splicing mechanism, including the insertion rod, connecting rod and return spring, is used to achieve quick splicing; by moving the components, the position of the roller is adjusted using the threaded rod, crank handle, guide rod, moving plate and connecting plate to facilitate movement.

Benefits of technology

The splicing efficiency and mobility of the fence are improved, and the practicality is enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223358883U_ABST
    Figure CN223358883U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of fences, and provides a construction engineering construction safety management fence which comprises a bottom plate, the top of the bottom plate is fixedly connected with a fence, the bottoms of the two sides of the bottom plate are respectively provided with a moving assembly, a splicing mechanism is arranged above one side of the bottom plate, and warning lamps are arranged on the two sides of the top of the fence. According to the safety management fence for construction engineering construction, the splicing mechanism is adopted, under the cooperation effect of the inserting rods, the connecting rods and the reset springs, the fence can be quickly spliced, the problem that time and labor are consumed is solved, meanwhile, the inserting rods can be fixed through the fixing assemblies, the splicing effect of the fence is enhanced, and the safety of the fence is improved. And through the adoption of a moving assembly, under the cooperation effect of a threaded rod, a crank, a guide rod, a moving plate, a rotating plate and a connecting plate, the positions of rolling wheels can be adjusted, the fence can be conveniently moved and transferred, and the practicability of the device is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of fences, in particular to a construction engineering construction safety management fence. Background Art

[0002] Fences are widely used in fields such as construction and safety protection. Especially in the process of construction, fences are used to isolate the construction site from the external environment, making the construction site a relatively closed space, reducing the impact of the construction site on the surrounding environment, and reducing the number of people who accidentally enter the construction site.

[0003] However, in the prior art, it is found that there are at least the following technical problems: it takes time and manpower to splice the existing fences. In addition, the existing fences are difficult to move, which causes great inconvenience during the transfer process and is not practical. For this reason, we propose a construction project safety management fence. Utility Model Content

[0004] (1) Technical problems solved

[0005] In response to the shortcomings of the existing technology, the utility model provides a construction project safety management fence to solve the technical problems that it takes time and manpower to splice the existing fences. In addition, the existing fences are difficult to move, which causes great inconvenience during the transfer process and is not practical.

[0006] (2) Technical solution

[0007] In order to achieve the above objectives, the present invention is implemented through the following technical solutions:

[0008] A construction engineering construction safety management fence includes a base plate, the top of the base plate is fixedly connected to the fence, movable components are respectively provided at the bottom of both sides of the base plate, a splicing mechanism is provided above one side of the base plate, and warning lights are provided on both sides of the top of the fence.

[0009] Preferably, one end of the base plate is fixedly connected to a plug-in board, and the other end of the base plate is provided with a slot adapted to the plug-in board.

[0010] By adopting the above technical solution, the fence can be preliminarily spliced.

[0011] Preferably, the splicing mechanism includes an insertion rod, which is inserted above one side of the base plate, a connecting rod is fixedly connected to the bottom side of the insertion rod, a return spring is fixedly connected to one side of the connecting rod, and a fixing component is inserted on the top side of the insertion rod.

[0012] By adopting the above technical solution, fences can be spliced.

[0013] Preferably, the fixing assembly includes a fixing plate, which is fixedly connected to the surface of the base plate on one side of the insertion rod, a card rod is slidably embedded in the middle of the fixing plate, a limiting plate is fixedly sleeved on one end of the card rod, and a spring is arranged around the middle of the card rod.

[0014] By adopting the above technical solution, the inserted poles can be fixed, thereby enhancing the splicing effect of the fence.

[0015] Preferably, both ends of the spring are fixedly connected to the limiting piece and the fixing plate respectively.

[0016] By adopting the above technical solution, the stability of the spring during use is enhanced.

[0017] Preferably, the movable assembly includes a threaded rod, which is rotatably connected to the inside of the base plate, and the two side surfaces of the threaded rod are respectively threadedly connected to the movable plate, and a guide rod is slidably embedded in one end of the movable plate, the bottom of the movable plate is rotatably connected to the rotating plate, and the bottom end of the rotating plate is rotatably connected to the connecting plate, and the bottom of the connecting plate is provided with a roller.

[0018] By adopting the above technical solution, the fence can be moved.

[0019] Preferably, the threads on both sides of the threaded rod are arranged in opposite directions.

[0020] By adopting the above technical solution, the movable plate can move in different directions.

[0021] Preferably, one end of the threaded rod is fixedly connected to a crank.

[0022] By adopting the above technical solution, it is easy to rotate the threaded rod.

[0023] (3) Beneficial effects

[0024] Compared with the prior art, the beneficial effects of the present invention are:

[0025] The utility model adopts a splicing mechanism, which can quickly splice the fence with the cooperation of the insertion rod, the connecting rod and the return spring, thereby solving the problem of time and labor consumption. At the same time, the fixing component can fix the insertion rod to enhance the splicing effect of the fence. Then, by adopting a moving component, the position of the roller can be adjusted with the cooperation of the threaded rod, the crank handle, the guide rod, the moving plate, the rotating plate and the connecting plate, which facilitates the movement and transfer of the fence that is difficult to move, thereby improving the practicality of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiment of the present invention with reference to the accompanying drawings.

[0027] Figure 1 It is a schematic diagram of the three-dimensional structure in an embodiment of the utility model;

[0028] Figure 2 In the embodiment of the present utility model Figure 1 Schematic diagram of the right view structure;

[0029] Figure 3 This is a schematic diagram of the structure of the mobile component in the embodiment of the utility model;

[0030] Figure 4 In the embodiment of the present utility model Figure 1 Schematic diagram of the enlarged structure of the splicing mechanism at A in the middle.

[0031] Figure 5 This is a schematic cross-sectional view of the connection between the insertion rod and the insertion plate in an embodiment of the present utility model.

[0032] Legend: 1. Base plate; 101. Slot; 102. Insert plate; 2. Moving assembly; 21. Threaded rod; 22. Crank handle; 23. Guide rod; 24. Moving plate; 25. Turntable; 26. Connecting plate; 27. Roller; 3. Fence; 4. Warning light; 5. Splicing mechanism; 51. Insert rod; 52. Connecting rod; 53. Restoring spring; 54. Fixed assembly; 541. Fixed plate; 542. Clamping rod; 543. Limiting plate; 544. Spring. DETAILED DESCRIPTION

[0033] The embodiment of the present application provides a construction project construction safety management fence. By adopting a splicing mechanism, the fence can be quickly spliced ​​with the cooperation of the insertion rod, connecting rod and return spring, thereby solving the problem of time and labor consumption. At the same time, the fixed component can fix the insertion rod to enhance the splicing effect of the fence. Then, by adopting a movable component, the position of the roller can be adjusted with the cooperation of the threaded rod, crank handle, guide rod, movable plate, rotating plate and connecting plate, which facilitates the difficult movement and transfer of the fence, thereby improving the practicality of the device.

[0034] Example 1

[0035] The technical solution in the embodiments of the present application is to effectively solve the technical problems that the splicing of existing fences consumes time and labor. In addition, the existing fences are difficult to move, resulting in great inconvenience during the transfer process and low practicality. The overall idea is as follows:

[0036] In response to the problems existing in the prior art, the utility model provides a construction project safety management fence, including a base plate 1, a fence 3 fixedly connected to the top of the base plate 1, movable components 2 are respectively provided at the bottom of both sides of the base plate 1, a splicing mechanism 5 is provided above one side of the base plate 1, and warning lights 4 are provided on both sides of the top of the fence 3.

[0037] In some embodiments, one end of the bottom plate 1 is fixedly connected to the plug plate 102, and the other end of the bottom plate 1 is provided with a slot 101 adapted to the plug plate 102. The splicing mechanism 5 includes an insert rod 51, which is inserted above one side of the bottom plate 1. The bottom side of the insert rod 51 is fixedly connected to a connecting rod 52, one side of the connecting rod 52 is fixedly connected to a restoring spring 53, and the top side of the insert rod 51 is inserted with a fixing component 54. Figures 1 to 5 As shown, first insert the plug board 102 on one side into the slot 101 on the other side of the base plate 1, and the plug rod 51 enters the interior of the plug board 102 under the action of the return spring 53, which can complete the fixation of the plug board 102 and realize the splicing of the fence 3.

[0038] In some embodiments, the fixing assembly 54 includes a fixing plate 541, which is fixedly connected to the surface of the bottom plate 1 on one side of the insertion rod 51. A clamping rod 542 is slidably embedded in the middle of the fixing plate 541, and a limiting piece 543 is fixedly sleeved on one end of the clamping rod 542. A spring 544 is arranged around the middle of the clamping rod 542, and the two ends of the spring 544 are fixedly connected to the limiting piece 543 and the fixing plate 541 respectively. Figures 1 to 5 As shown, the locking rod 542 enters the locking hole at the top of the insertion rod 51 under the action of the spring 544, which can limit the position of the insertion rod 51 and fix the insertion board 102 with the insertion rod 51.

[0039] When using this embodiment, when splicing the fence 3, first insert the plug plate 102 on one side into the slot 101 on the other side of the base plate 1, and the plug rod 51 enters the interior of the plug plate 102 under the action of the return spring 53, which can complete the fixation of the plug plate 102 and realize the splicing of the fence 3. At the same time, the clamping rod 542 enters the clamping hole at the top of the plug rod 51 under the action of the spring 544, which can limit the position of the plug rod 51, so as to fix the plug plate 102 with the plug rod 51.

[0040] Example 2

[0041] Based on Example 1, this embodiment of the application is a feasible technical solution for construction project safety management fence. The overall idea is as follows:

[0042] In some embodiments, the moving assembly 2 includes a threaded rod 21, which is rotatably connected to the inside of the base plate 1. The two side surfaces of the threaded rod 21 are respectively threadedly connected to a moving plate 24. A guide rod 23 is slidably embedded in one end of the moving plate 24. The bottom of the moving plate 24 is rotatably connected to a rotating plate 25. The bottom end of the rotating plate 25 is rotatably connected to a connecting plate 26. A roller 27 is provided at the bottom of the connecting plate 26. Figures 1 to 5 As shown, when the fence 3 needs to be moved, the crank 22 is turned to drive the threaded rod 21 to rotate. At this time, the movable plates 24 approach each other under the restriction of the guide rod 23, and exert force on the rotating plate 25, eventually causing the roller 27 to move downward and finally contact the ground, and the fence 3 can be moved with the help of the roller 27.

[0043] In some embodiments, the threads on both sides of the threaded rod 21 are arranged in opposite directions, and one end of the threaded rod 21 is fixedly connected to the crank 22, such as Figures 1 to 5 As shown, rotating the crank 22 can drive the threaded rod 21 to rotate, and the threads are arranged in opposite directions so that the two movable plates 24 can move in opposite directions.

[0044] When this embodiment is in use, when the fence 3 needs to be moved, the crank 22 is turned to drive the threaded rod 21 to rotate. At this time, the movable plates 24 approach each other under the restriction of the guide rod 23, and exert force on the rotating plate 25, eventually causing the roller 27 to move downward and finally contact the ground, so that the fence 3 can be moved with the help of the roller 27.

[0045] Working principle: When splicing the fence 3, first insert the plug plate 102 on one side into the slot 101 on the other side of the base plate 1, and the plug rod 51 enters the interior of the plug plate 102 under the action of the return spring 53, which can complete the fixation of the plug plate 102 and realize the splicing of the fence 3. At the same time, the clamping rod 542 enters the clamping hole at the top of the plug rod 51 under the action of the spring 544, which can limit the position of the plug rod 51. With the fixing effect of the plug rod 51 on the plug plate 102, when the fence 3 needs to be moved, the crank 22 is turned to drive the threaded rod 21 to rotate. At this time, the movable plates 24 approach each other under the restriction of the guide rod 23, and exert force on the rotating plate 25, eventually causing the roller 27 to move downward and finally contact the ground, and the roller 27 can be used to move the fence 3.

[0046] Finally, it should be noted that the above embodiments are merely examples for the purpose of clearly illustrating the present invention and are not intended to limit the embodiments. Those skilled in the art will readily appreciate that other variations or modifications based on the above description are possible. It is not necessary and impossible to enumerate all embodiments here. Obvious variations or modifications arising therefrom remain within the scope of protection of the present invention.

Claims

1. A construction engineering construction safety management fence, comprising a bottom plate (1), characterized in that: A fence (3) is fixedly connected to the top of the base plate (1), movable components (2) are respectively provided at the bottom of both sides of the base plate (1), a splicing mechanism (5) is provided above one side of the base plate (1), and warning lights (4) are provided on both sides of the top of the fence (3).

2. A construction engineering safety management fence as claimed in claim 1, characterized in that: One end of the base plate (1) is fixedly connected to an inserting plate (102), and the other end of the base plate (1) is provided with a slot (101) adapted to the inserting plate (102).

3. The construction safety management fence according to claim 1, characterized in that: The splicing mechanism (5) comprises an insertion rod (51), the insertion rod (51) being inserted above one side of the bottom plate (1), a connecting rod (52) being fixedly connected to the bottom side of the insertion rod (51), a return spring (53) being fixedly connected to one side of the connecting rod (52), and a fixing assembly (54) being inserted at the top side of the insertion rod (51).

4. A construction engineering safety management fence as claimed in claim 3, characterized in that: The fixing assembly (54) comprises a fixing plate (541), the fixing plate (541) being fixedly connected to the surface of the bottom plate (1) on one side of the insertion rod (51), a clamping rod (542) being slidably embedded in the middle of the fixing plate (541), a limiting piece (543) being fixedly sleeved on one end of the clamping rod (542), and a spring (544) being arranged around the middle of the clamping rod (542).

5. A construction engineering safety management fence as claimed in claim 4, characterized in that: The two ends of the spring (544) are fixedly connected to the limiting piece (543) and the fixing plate (541), respectively.

6. The construction safety management fence according to claim 1, characterized in that: The moving assembly (2) includes a threaded rod (21), the threaded rod (21) is rotatably connected to the inside of the bottom plate (1), and the two side surfaces of the threaded rod (21) are respectively threadedly connected to the moving plates (24), one end of the moving plate (24) is slidably embedded with a guide rod (23), the bottom of the moving plate (24) is rotatably connected to a rotating plate (25), the bottom end of the rotating plate (25) is rotatably connected to a connecting plate (26), and the bottom of the connecting plate (26) is provided with a roller (27).

7. A construction engineering safety management fence as claimed in claim 6, characterized in that: The threads on both sides of the threaded rod (21) are arranged in opposite directions.

8. A construction engineering safety management fence as claimed in claim 7, characterized in that: One end of the threaded rod (21) is fixedly connected to a crank (22).