Finished flowmeter inspection well internal installation structure
By using a combination of connecting plates, mounting columns and other structures in the flow meter inspection well to achieve double sealing, the problems of unstable flow meter connection and difficult construction are solved, stable connection and convenient replacement are achieved, and the risk of water leakage and construction difficulty are reduced.
Patent Information
- Application Number
- CN202422789063.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-15
- Publication Date
- 2025-10-17
- Estimated Expiration
- 2034-11-15
AI Technical Summary
The flowmeter connection in the existing flowmeter inspection well is unstable, prone to leakage, inconvenient to replace, and difficult to construct.
The combined structure of connecting plate, mounting column, slip ring, limit slot, clamping ring, sealing slot and plug-in plate is adopted to achieve double sealing, facilitate the installation and disassembly of the flow meter, and is modularized through splicing rings and splicing slots.
The risk of water leakage at the flow meter connection position is reduced, the replacement process is simplified, the construction difficulty is reduced, and the rainwater pressure is discharged through the drainage pipe to avoid cracking of the well body.
Smart Images

Figure CN223446220U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to flow well technical field, concretely is a finished product flowmeter inspection well internal mounting structure. BACKGROUND
[0002] The inspection well is set for the maintenance of the power supply, water supply, drainage, sewage, communication, cable television, gas pipe, street lamp line and the like of the urban underground infrastructure, and is convenient to install, is generally set at the pipe intersection, turning place, pipe diameter or slope change place and every other distance place on the straight pipe section, and is convenient to the periodical inspection of the attached structure.
[0003] The utility model discloses a kind of integrated small sewage station effluent inspection wells with the application of the prior art, including prefabricated frame body, the top of the prefabricated frame body is equipped with cover plate, the cover plate and prefabricated frame body form closed space;The middle part of the prefabricated frame body is equipped with partition, and the partition separates prefabricated frame body into flowmeter well and flow-through pool;The outside of the flowmeter well is equipped with inlet (outlet) water pipe, and the inlet (outlet) water pipe is equipped with connecting pipe, and the connecting pipe passes through and communicates with flow-through pool from flowmeter well, and the outside of the flow-through pool is equipped with outlet (inlet) water pipe, and the outlet (inlet) water pipe communicates with flow-through pool;The part of connecting pipe in flowmeter well is equipped with electromagnetic flowmeter;Online instrument is installed in the flow-through pool.The utility model discloses simple structure, and when installing, it will not be affected by site environment, and the construction difficulty is small, and installation efficiency is high.
[0004] And the flowmeter inside well is connected between inlet and outlet water pipe, is inconvenient to disassemble in subsequent replacement process, and if connection is not stable enough, there is also possibility to appear liquid leakage, and the flow well is not easy to build. Utility model content
[0005] The utility model discloses a kind of finished product flowmeter inspection well internal mounting structure, to solve the problem in the above background technology.
[0006] In order to achieve the above object, the utility model provides the following technical scheme: a finished product flowmeter inspection well internal installation structure, including first concrete pipe, the top of first concrete pipe is equipped with second concrete pipe, the top of second concrete pipe is equipped with third concrete pipe, the non-circular center position of first concrete pipe and second concrete pipe top is equipped with splicing ring, the non-circular center position of second concrete pipe and third concrete pipe bottom is equipped with splicing groove, one side of first concrete pipe inside is equipped with liquid inlet pipe, the other side of first concrete pipe inside is equipped with liquid outlet pipe, the top of liquid inlet pipe is equipped with installation pipe, the inside of installation pipe is equipped with mounting post, the non-circular center position of mounting post top is equipped with sealed slot, the inside of mounting post is equipped with flowmeter, the outside of flowmeter is equipped with plugboard, the inside of plugboard is equipped with plugboard, plugboard is connected with flowmeter, the both sides of flowmeter are equipped with connecting plate, one side of connecting plate is equipped with limit card slot, the inside of installation pipe is slidably connected with sliding ring, one side of sliding ring is equipped with snap ring, snap ring and limit card slot are mutually adapted.
[0007] Preferably, the inner side of the first concrete pipe is uniformly provided with a plurality of drainage pipes, and the outer side of the first concrete pipe is provided with a plurality of through holes, and the drainage pipes are connected with the through holes, facilitating drainage.
[0008] Preferably, the plugboard is made of rubber material, and the bottom of the plugboard is conical, improving the sealing effect.
[0009] Preferably, the inner side of the sealing slot is provided with a rubber ring, which can clamp the side wall of the plugboard after the plugboard is inserted, thereby sealing, avoiding water leakage.
[0010] Preferably, the top and bottom of the snap ring are symmetrically provided with limit sliding plates, the inside of the limit card slot is provided with a limit sliding groove, and the limit sliding plate and the limit sliding groove are mutually adapted to prevent the sliding ring and the snap ring from falling off.
[0011] Preferably, the first concrete pipe is provided with a through groove on both sides, and the liquid inlet pipe and the liquid outlet pipe are located inside the through groove, facilitating the liquid inlet pipe and the liquid outlet pipe to extend into the inside of the first concrete pipe for installation.
[0012] Compared with the prior art, the utility model has the beneficial effects that the finished product flowmeter inspection well internal installation structure;
[0013] Through cooperation of the connecting plate, the mounting column, the slip ring, the limiting clamping groove, the mounting pipe, the clamping ring, the sealing slot and the plug-in plate, in the process of installing the flow meter, the double sealing mode can be used to reduce the water leakage of the flow meter connection position, and when the flow meter is damaged, it is also convenient to disassemble and replace, and when it rains, the rainwater in the side wall soil can be guided to the ground at the bottom through the drainage pipe, thereby reducing the pressure of the side wall and avoiding cracking due to excessive pressure, and through cooperation of the splicing ring and the splicing groove, the flow well can be built by multiple modules, thereby reducing the difficulty of construction and facilitating transportation of materials. BRIEF DESCRIPTION OF DRAWINGS
[0014] Figure 1 It is a perspective view of the utility model;
[0015] Figure 2 It is a front view of the utility model;
[0016] Figure 3 It is a Figure 2 enlarged view of A of the utility model;
[0017] Figure 4 It is a top view of the mounting column of the utility model;
[0018] Figure 5 It is a perspective view of the third concrete pipe of the utility model;
[0019] Figure 6 It is a perspective view of the second concrete pipe of the utility model.
[0020] In the drawing: 1, first concrete pipe; 2, second concrete pipe; 3, third concrete pipe; 4, liquid inlet pipe; 5, flow meter; 6, splicing ring; 7, drainage pipe; 8, liquid outlet pipe; 9, plug-in plate; 10, connecting plate; 11, mounting column; 12, slip ring; 13, limiting clamping groove; 14, mounting pipe; 15, clamping ring; 16, sealing slot; 17, plug-in plate; 18, splicing groove. DETAILED DESCRIPTION
[0021] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the protection scope of the utility model.
[0022] Please refer to Figures 1-6The utility model provides an embodiment: a finished product flowmeter inspection well internal installation structure, including first concrete pipe 1, the inside of first concrete pipe 1 is uniformly equipped with multiple groups of drain pipe 7, and the outside of first concrete pipe 1 is equipped with multiple groups of through -hole, and drain pipe 7 is connected with the through -hole, and it is convenient to drain, the top of first concrete pipe 1 is equipped with second concrete pipe 2, the top of second concrete pipe 2 is equipped with third concrete pipe 3, and the non -circular center position of first concrete pipe 1 and second concrete pipe 2 top is equipped with splicing ring 6, and the non -circular center position of second concrete pipe 2 and third concrete pipe 3 bottom is equipped with splicing groove 18, one side in first concrete pipe 1 is equipped with liquid inlet pipe 4, and the other side in first concrete pipe 1 is equipped with liquid outlet pipe 8, and both sides of first concrete pipe 1 are provided with through slot, and liquid inlet pipe 4 and liquid outlet pipe 8 are all located inside through slot, and it is convenient for liquid inlet pipe 4 and liquid outlet pipe 8 to extend into the inside of first concrete pipe 1 and install, the top of liquid inlet pipe 4 is equipped with installation pipe 14, the inside of installation pipe 14 is equipped with mounting post 11, and the non -circular center position of mounting post 11 top is equipped with sealed insertion slot 16;
[0023] The inside of mounting post 11 is equipped with flowmeter 5, the outside of flowmeter 5 is equipped with plugboard 17, the inside of sealed insertion slot 16 is equipped with rubber ring, after the insertion of plugboard 17, the side wall of plugboard 17 can be clamped, and then blocked, to avoid water leakage, the inside of plugboard 17 is equipped with plugboard 9, plugboard 9 is made of rubber material, and the bottom of plugboard 9 is tapered, to improve the sealing effect, plugboard 9 is connected with flowmeter 5, and the both sides of flowmeter 5 are symmetrically equipped with connecting plate 10, one side of connecting plate 10 is equipped with limit card slot 13, the inside of installation pipe 14 is slidably connected with sliding ring 12, one side of sliding ring 12 is equipped with snap ring 15, the top and bottom of snap ring 15 are symmetrically equipped with limit sliding plate, the inside of limit card slot 13 is equipped with limit sliding slot, and limit sliding plate and limit sliding slot are mutually adapted, to prevent sliding ring 12 and snap ring 15 from falling off, and snap ring 15 and limit card slot 13 are mutually adapted.
[0024] Working principle: in the process of building, first dig a pit on the ground in advance, first concrete pipe 1, second concrete pipe 2 and third concrete pipe 3 are sequentially placed into the pit, and in the process of splicing, splicing groove 18 is aligned with splicing ring 6 and is clamped to facilitate docking, after splicing is completed, then fill the concrete at the joint gap, then install liquid inlet pipe 4 and liquid outlet pipe 8 in the inside of first concrete pipe 1, after installation is completed, then insert plugboard 9 on flowmeter 5 into the connected hole of mounting post 11, plugboard 9 is inserted into the inside of sealed insertion slot 16, to double seal the connected position, then rotate sliding ring 12 after connection is completed, at this time, sliding ring 12 drives snap ring 15 to move, so that snap ring 15 is rotated into the inside of limit card slot 13 and locks connecting plate 10, to limit the position of flowmeter 5, to complete the installation work of flowmeter 5.
[0025] It is apparent for a person skilled in the art that the present application is not limited to the details of the above-described exemplary embodiments but can be implemented in other embodiments without departing from the spirit or essential characteristics of the application. Consequently, the embodiments should be considered in all respects as illustrative and not restrictive, the scope of the application being indicated by the appended claims rather than by the above description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference signs in the claims should not be construed as limiting the scope of the claims to the features or aspects with which the reference signs are associated.
[0026] In the description of the present application, unless otherwise specified and limited, the meaning of "a plurality of" is two or more; the orientation or positional relationship indicated by the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail" and the like is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present application and simplifying the description, and therefore cannot be understood as indicating or implying that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as limiting the present application. In addition, the terms "first", "second", "third" and the like are only for the purpose of description and cannot be understood as indicating or implying relative importance.
[0027] In the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "connected", "connected" should be understood broadly, for example, it can be fixedly connected, or it can be detachably connected; it can be mechanically connected, or it can be electrically connected; it can be directly connected, or it can be indirectly connected through an intermediate medium. For a person skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances.
Claims
1. A finished flow meter inspection well internal installation structure, comprising a first concrete pipe (1), characterized in that: A second concrete pipe (2) is provided on the top of the first concrete pipe (1), a third concrete pipe (3) is provided on the top of the second concrete pipe (2), a splicing ring (6) is provided at a non-center position of the top of the first concrete pipe (1) and the second concrete pipe (2), a splicing groove (18) is provided at a non-center position of the bottom of the second concrete pipe (2) and the third concrete pipe (3), a liquid inlet pipe (4) is provided on one side of the interior of the first concrete pipe (1), a liquid outlet pipe (8) is provided on the other side of the interior of the first concrete pipe (1), a mounting pipe (14) is provided on the top of the liquid inlet pipe (4), and a mounting column ( 11), a sealing slot (16) is provided at a non-center position on the top of the mounting column (11), a flow meter (5) is provided inside the mounting column (11), an insert plate (17) is provided on the outside of the flow meter (5), a plug plate (9) is provided inside the insert plate (17), the plug plate (9) is connected to the flow meter (5), connecting plates (10) are symmetrically provided on both sides of the flow meter (5), a limiting groove (13) is provided on one side of the connecting plate (10), a slip ring (12) is slidably connected inside the mounting tube (14), a snap ring (15) is provided on one side of the slip ring (12), and the snap ring (15) and the limiting groove (13) are adapted to each other.
2. The internal installation structure of a finished flow meter inspection well according to claim 1 is characterized in that: Multiple groups of drainage pipes (7) are evenly arranged on the inner side of the first concrete pipe (1), and multiple groups of through holes are arranged on the outer side of the first concrete pipe (1), and the drainage pipes (7) are connected to the through holes.
3. The internal installation structure of a finished flow meter inspection well according to claim 1 is characterized in that: The plug plate (9) is made of rubber material, and the bottom of the plug plate (9) is conical.
4. The internal installation structure of a finished flow meter inspection well according to claim 1 is characterized in that: A rubber ring is provided on the inner side of the sealing slot (16).
5. The internal installation structure of a finished flow meter inspection well according to claim 1 is characterized in that: The top and bottom of the clamping ring (15) are symmetrically provided with limiting slide plates, and the interior of the limiting clamping groove (13) is provided with a limiting slide groove, and the limiting slide plates and the limiting slide groove are adapted to each other.
6. The internal installation structure of a finished flow meter inspection well according to claim 1 is characterized in that: Through grooves are preset on both sides of the first concrete pipe (1), and the liquid inlet pipe (4) and the liquid outlet pipe (8) are both located inside the through grooves.