Cable support for water conservancy project
By improving the design of the cable bracket for water conservancy projects and adopting a combined structure of vertical brackets, expansion spirals and support plates, the problems of poor stability and poor model adaptability of existing brackets have been solved, and stable fastening and firm support for cables of different models have been achieved.
Patent Information
- Application Number
- CN202422730332.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-11
- Publication Date
- 2025-10-17
- Estimated Expiration
- 2034-11-11
AI Technical Summary
The existing cable supports for water conservancy projects have poor stability and unsatisfactory fastening effects for cables of different models.
It adopts a combination design of vertical bracket, expansion screw, fixing screw, support plate and adjustment bolt. It is fixed to the outside of the wall through the expansion screw. The support plate can be adjusted to adapt to different types of cables, and stable fixation is achieved with adjusting bolts and fastening bolts.
It achieves stable fixation of cables of different types, enhances the fastening effect of the bracket, and provides more solid support.
Smart Images

Figure CN223451538U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to a cable support for water conservancy project. BACKGROUND
[0002] The water conservancy project cable is a kind of cable specially used in water conservancy project, it is usually composed of conductor, insulating layer, shielding layer and protection layer etc., is made of special material, has good conductivity, insulating property, water resistance, corrosion resistance and wear resistance etc.Characteristics.This cable can be long time stable operation in humid, water immersion etc.Adverse environment, guarantees the power transmission and communication safety of water conservancy project, has decisive influence to engineering quality.
[0003] The water conservancy project cable support currently used has the defects of poor stability and unsatisfactory fastening effect of different models of cables, and has room for improvement. CONTENT OF THE UTILITY MODEL
[0004] The utility model is to provide a kind of cable support for water conservancy project to solve the above technical problems.
[0005] To achieve the above object, the utility model adopts the following technical scheme:
[0006] A kind of cable support for water conservancy project, including vertical support, expansion screw pipe, fixed screw, support plate, adjusting bolt, the vertical support is bolted connection on the outer side of wall body by the effect of four expansion screw pipes and fixed screw, two described support plates bolted connection on the outer side above vertical support, adjusting bolt is bolted connection between the front end of two support plates.
[0007] On the basis of the above technical scheme, the vertical support includes chute, screw hole, base, ground insertion rod, two described chutes are respectively set in the two sides of vertical support, four described screw holes are equidistantly set on the top of vertical support, the base is fixedly connected at the bottom of vertical support, four described ground insertion rods are equidistantly fixedly connected at the bottom of base.
[0008] On the basis of the above technical scheme, the support plate includes plate body, chute linkage rod, fastening bolt, adjusting screw hole, cable clamping plate, two chute linkage rods are equidistantly fixedly connected at the rear of plate body, the fastening bolt is threadedly connected between two chute linkage rods, the adjusting screw hole is set at the center of front end of plate body, and the cable clamping plate is fixedly connected at the bottom of plate body.
[0009] Compared with the prior art, the utility model has the following advantages: the utility model improves the design structure of the existing cable support, so that it can be fastened and adjusted according to different models of cables, and ensure that different models of cables can be stably fixed;At the same time, the fastening effect of the support is strengthened, so that it provides more firm support for the cable. BRIEF DESCRIPTION OF DRAWINGS
[0010] Fig. 1 It is the appearance structure schematic view of the utility model.
[0011] Fig. 2 It is the vertical support structure schematic view of the utility model.
[0012] Fig. 3 It is the support plate structure schematic view of the utility model.
[0013] In the drawing: 1. vertical support, 2. expansion pipe, 3. fixed screw, 4. support plate, 5. adjusting bolt, 6. sliding groove, 7. screw hole, 8. base, 9. ground insertion rod, 10. plate body, 11. sliding groove linkage rod, 12. fastening bolt, 13. adjusting screw hole, 14. cable clamping plate. DETAILED DESCRIPTION
[0014] The utility model is further described in detail below in combination with the drawings and specific embodiments.
[0015] As Figs. 1-3 Indicated, a kind of cable support for hydraulic engineering, including vertical support 1, expansion pipe 2, fixed screw 3, support plate 4, adjusting bolt 5, the vertical support 1 is bolted connection in the outer side of wall by the effect bolt of four expansion pipe 2 and fixed screw 3, two described support plate 4 bolted connection in the outer side above vertical support 1, the adjusting bolt 5 is bolted connection between the front end of two support plate 4.
[0016] The vertical support 1 includes sliding groove 6, screw hole 7, base 8, ground insertion rod 9, two described sliding grooves 6 are respectively set in vertical support 1 both sides, four described screw holes 7 are equidistantly set in vertical support 1 above, the base 8 is fixedly connected at vertical support 1 bottom, four described ground insertion rods 9 are equidistantly fixedly connected at base 8 bottom.
[0017] The support plate 4 includes plate body 10, sliding groove linkage rod 11, fastening bolt 12, adjusting screw hole 13, cable clamping plate 14, the plate body 10 rear equidistantly fixedly connected with two sliding groove linkage rods 11, the fastening bolt 12 is threadedly connected between two sliding groove linkage rods 11, the adjusting screw hole 13 is set in the front end center of plate body 10, the cable clamping plate 14 is fixedly connected at plate body 10 bottom.
[0018] The working principle of the utility model: the ground insertion rod of the novel is inserted into pre-buried position when using, and support is fixed in the outer side of wall by expansion pipe and fixed screw;Then according to the specific diameter of cable, the distance between two support plates is adjusted, to ensure that it can be firmly clamped on the upper and lower sides of cable, then the fastening bolt between rear sliding groove linkage rod and adjusting bolt are fastened, so that cable is stable between support plates, and the support and fixation of cable are completed.
[0019] The above is the preferred embodiment of the present application, for those skilled in the art, according to the teaching of the present application, without departing from the principles and spirit of the present application, the change, modification, replacement and modification of the embodiment still falls within the scope of the present application.
Claims
1. A cable support for a water conservancy project, comprising a vertical support (1), an expansion spiral tube (2), a fixing screw (3), a support plate (4), and an adjusting bolt (5), characterized in that: The vertical bracket (1) is bolted to the outside of the wall through four expansion coils (2) and fixing screws (3); the two support plates (4) are bolted to the outside of the upper part of the vertical bracket (1); and the adjusting bolt (5) is bolted to the front ends of the two support plates (4).
2. A cable support for water conservancy projects according to claim 1, characterized in that: The vertical bracket (1) includes a slide groove (6), a screw hole (7), a base (8), and a ground rod (9). The two slide grooves (6) are respectively opened on both sides of the vertical bracket (1), and the four screw holes (7) are equidistantly opened above the vertical bracket (1). The base (8) is fixedly connected to the bottom of the vertical bracket (1), and the four ground rods (9) are equidistantly fixedly connected to the bottom of the base (8).
3. The cable support for water conservancy projects according to claim 1, characterized in that: The support plate (4) comprises a plate body (10), a slide groove linkage rod (11), a fastening bolt (12), an adjustment screw hole (13), and a cable clamping plate (14). Two slide groove linkage rods (11) are fixedly connected at equal intervals to the rear of the plate body (10). The fastening bolt (12) is threadedly connected between the two slide groove linkage rods (11). The adjustment screw hole (13) is opened at the center of the front end of the plate body (10). The cable clamping plate (14) is fixedly connected to the bottom of the plate body (10).