Assembly type concrete building beam-column joint connecting structure
By setting butt grooves and steel connection structures on precast columns and beams, combined with a quick connection method using locking plates and nuts, the problems of low construction efficiency and insufficient seismic performance in existing technologies are solved, achieving efficient and stable beam-column joint connections.
Patent Information
- Application Number
- CN202422634924.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-30
- Publication Date
- 2025-11-07
- Estimated Expiration
- 2034-10-30
AI Technical Summary
In existing prefabricated concrete building beam-column joint connection structures, the irregular shapes of precast columns and beams during construction affect transportation, and the installation is complicated, resulting in low construction efficiency and limited practicality.
Symmetrical butt joint grooves are opened on both sides of the precast columns and beams. Steel is cast into the connecting components and locking plates and nuts are installed. Quick connection is achieved by fastening screws and guide slides. The connection accuracy and seismic performance are improved by combining fixing ribs and shock-absorbing pads.
It enables quick and easy connection of precast columns and precast beams, improving construction efficiency and seismic performance, and enhancing the stability and practicality of the structure.
Smart Images

Figure CN223523248U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of prefabricated building technology, specifically to a beam-column joint connection structure for prefabricated concrete buildings. Background Technology
[0002] Prefabricated buildings refer to buildings where a large amount of on-site work in traditional construction methods is transferred to factories. Building components and accessories are processed and manufactured in factories, transported to the construction site, and assembled on-site using reliable connection methods. Prefabricated buildings mainly include precast concrete structures, steel structures, and modern wood structures. When connecting and fixing precast beams and columns in precast concrete buildings, prefabricated concrete beam-column joint connection structures are required.
[0003] The prior art discloses a precast assembled building concrete beam-column steel composite connection node structure with publication number CN213926777U, including precast columns, precast beams, and connecting components. The precast columns have internal fixing ribs, one end of which extends beyond the column. A steel plate is welded to the side of the precast column. The precast beams have through-type steel sections, one end of which extends beyond the beam. A protrusion is located below the protruding end of the steel section. The connecting components include a cast-in-place upper part and a precast lower part. The cast-in-place upper part is a hollow pre-reserved groove, and the precast lower part has a groove matching the protrusion on the side away from the precast column. When the groove and protrusion are completely closed, a buffer gap is formed. This utility model improves the assembly speed and reduces construction costs while ensuring safety and stability during the assembly process. It also improves seismic performance. The overall design is simple, has good seismic performance, is convenient to construct, and has high assembly efficiency, making it of practical significance.
[0004] The aforementioned utility model features precast columns with cast-in-place reinforcing bars and precast beams with cast-in-place steel sections. This results in irregular shapes for the precast columns and beams, affecting their transportation and consequently impacting the construction efficiency of precast buildings. Furthermore, the beam-column joint connection structure requires workers to tighten multiple toothed bolts and fix angle steel during installation, making the construction process relatively complex and its practicality somewhat limited. Utility Model Content
[0005] (a) Technical problems to be solved
[0006] To address the shortcomings of existing technologies, this utility model provides a beam-column joint connection structure for prefabricated concrete buildings. This structure does not affect the shape of the prefabricated columns and beams, and offers advantages such as more convenient and faster joint connections, lower construction difficulty, higher work efficiency, and greater practicality, thereby solving the problems mentioned in the background technology.
[0007] (II) Technical Solution
[0008] In order to realize the above-mentioned will not affect the appearance of the prefabricated column and prefabricated beam, and the node connection is more convenient and fast, the construction difficulty is low, the working efficiency is high, and the practicality is stronger, the specific technical scheme of the utility model is as follows: the prefabricated column, the prefabricated beam and the connecting component are symmetrically provided with first docking grooves on both sides, the prefabricated beam is symmetrically provided with second docking grooves on both sides, the connecting component is poured with a profile steel, a plurality of fixing holes are symmetrically provided on the profile steel, the profile steel is respectively inserted into the first docking groove and the second docking groove, a plurality of locking columns are symmetrically welded on the bottom surface of the locking plate, the nut is fixedly installed on the top surface of the reserved groove, the fastening screw is sleeved with the nut, the bottom end of the fastening screw is connected and installed on the top surface of the locking plate, the movable groove is symmetrically provided on the side wall of the prefabricated column, a plurality of first through holes are communicated between the movable groove and the first docking groove, a plurality of second through holes are uniformly provided on one side of the second docking groove and penetrate the side wall of the prefabricated beam, the locking column is respectively inserted into the fixing hole through the first through hole and the second through hole.
[0009] Further, the reserved groove is symmetrically welded with a guide sliding rod, the locking plate is symmetrically fixedly installed with a guide sliding sleeve, and the guide sliding rod is sleeved in the guide sliding sleeve.
[0010] Further, the connecting component is symmetrically welded with a plurality of fixing ribs on both side walls, a plurality of insertion holes are symmetrically provided on the opposite side of the prefabricated column and the prefabricated beam, and the fixing rib is inserted into the insertion hole.
[0011] Further, the connecting component is symmetrically fixedly installed with a damping pad on both side walls.
[0012] Further, the cross section shape of the profile steel is I-shaped.
[0013] Further, the diameter of the locking column is smaller than the diameters of the first through hole, the second through hole and the fixing hole.
[0014] (Three) beneficial effects
[0015] Compared with the prior art, the utility model provides a prefabricated concrete building beam column node connecting structure, which has the following advantages
[0016] Beneficial effects:
[0017] (1), The utility model discloses a prefabricated column, prefabricated beam and connecting part are provided, the first butt joint groove is opened to the both sides of prefabricated column symmetry provided, the second butt joint groove is opened to the both sides of prefabricated beam symmetry provided, and the connecting part is provided with profile steel in the pouring, and a plurality of fixed holes are opened to the both sides of profile steel symmetry, when construction, the worker can respectively insert the both ends of profile steel in the first butt joint groove opened in prefabricated column and the second butt joint groove opened in prefabricated beam, the connecting part is provided with the reserved slot symmetry, and the locking plate is provided in the reserved slot, and a plurality of locking columns are welded to the both sides of locking plate bottom surface symmetry, the nut is fixedly installed on the top surface of reserved slot, the fastening screw is sleeved in the nut thread, and the fastening screw bottom end is connected and installed on the top surface center of locking plate, in addition, the guide slide rod is sleeved in the guide slide sleeve fixedly installed on the locking plate, so when the worker rotates fastening screw, can drive locking plate and move along the direction of guide slide rod, and one end of locking plate is clamped in the movable slot opened in prefabricated column, and the locking column of both sides can be respectively inserted in fixed hole symmetry through first through -hole and second through -hole, that is, can realize the connection locking of prefabricated column, prefabricated beam and connecting part three, realize the beam column joint connection of assembly type concrete building, and the beam column joint connection structure of the utility model does not cause the influence to the appearance of assembly type prefabricated column and prefabricated beam, and the node connection is more convenient and fast, and the construction difficulty is low, and the working efficiency is high, and the practicality is stronger.
[0018] (2), The utility model discloses a fixed muscle, inserts the hole and shock pad, the connecting part both sides side wall symmetry of setting is welded with a plurality of fixed muscle, and the even opening of setting is inserted the hole with a plurality of fixed muscle on the side wall of prefabricated column and prefabricated beam, can insert the fixed muscle symmetry on the even opening of inserting the hole of prefabricated column and prefabricated beam when construction, on the one hand, can improve the connection accuracy of prefabricated column, prefabricated beam and connecting part three, on the other hand, can also improve the load -bearing reliability after the connection of three, and the practicality is stronger, in addition, the connecting part both sides side wall symmetry of setting is fixedly installed with shock pad, and the side wall of shock pad and the side wall of prefabricated column and prefabricated beam abut, so that the structure can be buffered when being impacted, improve its shock resistance, not easy to damage, strengthen the stability of overall structure. ACCURACY
[0019] In order to more clearly illustrate the technical scheme in the embodiments of the present application or the prior art, the drawings needed to be used in the embodiments will be briefly introduced as follows. Obviously, the drawings in the following description are only some embodiments of the present application, and other drawings can also be obtained by those skilled in the art without any creative effort.
[0020] Figure 1 It is a structure schematic view of the assembly type concrete building beam column joint connection structure according to the embodiments of the present application.
[0021] Figure 2 is according to the embodiment of the utility model Figure 1 The enlarged view of A of the embodiment of the utility model
[0022] Figure 3 is according to the embodiment of the utility model Figure 1 The enlarged view of B of the embodiment of the utility model
[0023] Figure 4 is according to the embodiment of the utility model Figure 1 The enlarged view of C of the embodiment of the utility model
[0024] Figure 5 The locking plate perspective view of the fabricated concrete building beam column joint connecting structure according to the embodiment of the utility model.
[0025] In the drawings:
[0026] 1, prefabricated column; 2, connecting part; 3, sectional steel; 4, fastening screw; 5, prefabricated beam; 6, fixed rib; 7, locking plate; 8, movable slot; 9, first butt joint slot; 10, first through hole; 11, fixed hole; 12, guide sliding rod; 13, reserved slot; 14, guide sliding sleeve; 15, locking column; 16, second through hole; 17, second butt joint slot; 18, insertion hole; 19, shock pad; 20, nut. DETAILED DESCRIPTION
[0027] To further illustrate the embodiments, the utility model provides drawings, these drawings are part of the utility model disclosure, mainly used to illustrate the embodiment, and can cooperate with the relevant description of the specification to explain the operating principle of the embodiment, with reference to these contents, the person skilled in the art should understand other possible implementation modes and the advantages of the utility model, the components in the drawings are not drawn according to scale, and similar component symbols are usually used to indicate similar components.
[0028] According to the embodiment of the utility model, a fabricated concrete building beam column joint connecting structure is provided.
[0029] The utility model is further illustrated in conjunction with the drawings and specific embodiments, such as Figures 1-5As shown, the assembly type concrete building beam column joint connecting structure according to the utility model embodiment, including prefabricated column 1, prefabricated beam 5 and connecting part 2, prefabricated column 1 both sides symmetry are provided with first docking groove 9, prefabricated beam 5 both sides symmetry are provided with second docking groove 17, connecting part 2 is poured with profiled steel 3 in, and a plurality of fixed holes 11 are provided with symmetry on profiled steel 3, and profiled steel 3 both ends are inserted in first docking groove 9 and second docking groove 17 respectively, connecting part 2 is provided with reserved slot 13 on symmetry, and reserved slot 13 is provided with locking plate 7, and locking plate 7 bottom surface both sides symmetry are welded with a plurality of locking columns 15, reserved slot 13 top surface is fixedly installed with nut 20, and nut 20 is threadedly sleeved with fastening screw 4, and fastening screw 4 bottom end is connected and installed in locking plate 7 top surface center, prefabricated column 1 side wall symmetry is provided with movable slot 8, and a plurality of first through holes 10 are communicated and provided between movable slot 8 and first docking groove 9, second docking groove 17 one side is uniformly provided with a plurality of second through holes 16 that pass through the side wall of prefabricated beam 5, locking column 15 is inserted in fixed hole 11 respectively through first through hole 10 and second through hole 16, which will not affect the appearance of prefabricated column 1 and prefabricated beam 5, and the joint connection is more convenient and fast, the construction difficulty is low, and the working efficiency is high.
[0030] In one embodiment, guide sliding rods 12 are symmetrically welded in the reserved slots 13, and guide sliding sleeves 14 are symmetrically fixedly installed on the locking plates 7, and the guide sliding rods 12 are sleeved in the guide sliding sleeves 14, thereby providing a guiding action for the movement of the locking plates 7.
[0031] In one embodiment, a plurality of fixing ribs 6 are symmetrically welded on the side walls of the connecting part 2, and a plurality of insertion holes 18 are symmetrically provided on the opposite sides of the prefabricated column 1 and the prefabricated beam 5, and the fixing ribs 6 are inserted in the insertion holes 18, thereby improving the connection accuracy of the prefabricated column 1, the prefabricated beam 5 and the connecting part 2 on one hand, and improving the load-bearing reliability after the connection of the three on the other hand, and the utility is stronger.
[0032] In one embodiment, damping pads 19 are symmetrically fixedly installed on the side walls of the connecting part 2, thereby providing a certain buffer when the structure is impacted, improving the anti-seismic performance, not easy to damage, and enhancing the stability of the overall structure.
[0033] In one embodiment, the profiled steel 3 has an I-shaped cross-sectional shape.
[0034] In one embodiment, the diameter of the locking column 15 is smaller than the diameters of the first through hole 10, the second through hole 16 and the fixed hole 11.
[0035] Working principle: the utility model discloses the prefabricated column 1, prefabricated beam 5 and connecting component 2 are provided, and the first butt joint groove 9 is opened to the both sides of the prefabricated column 1 provided symmetrically, the second butt joint groove 17 is opened to the both sides of the prefabricated beam 5 provided symmetrically, and the connecting component 2 provided is poured with the section steel 3 in, and a plurality of fixed holes 11 are opened symmetrically on the section steel 3, when construction, the worker can respectively insert the section steel 3 both ends in the first butt joint groove 9 opened in the prefabricated column 1 and the second butt joint groove 17 opened in the prefabricated beam 5, the connecting component 2 provided is opened with the reserved slot 13 symmetrically on, and the reserved slot 13 is provided with locking plate 7, and a plurality of locking columns 15 are welded symmetrically on the bottom surface both sides of locking plate 7, the reserved slot 13 top is fixedly installed with nut 20, and the nut 20 is threadedly connected with fastening screw 4, and the fastening screw 4 bottom end is connected and installed in the top central portion of locking plate 7, in addition, the guide sliding sleeve 14 fixedly installed on locking plate 7 is sleeved with guide sliding rod 12, so when the worker rotates fastening screw 4 can drive locking plate 7 moves along the direction of guide sliding rod 12, and one end of locking plate 7 is clamped in the movable slot 8 opened in the prefabricated column 1, and the locking column 15 of both sides can be respectively inserted in the fixed hole 11 symmetrically through the first through-hole 10 and the second through-hole 16, that is, the prefabricated column 1, the prefabricated beam 5 and the connecting component 2 can be connected and locked, realize the beam-column joint connection of assembly type concrete building, the beam-column joint connection structure of the utility model does not cause the influence to the appearance of assembly type prefabricated column 1 and prefabricated beam 5, and the node connection is more convenient and fast, and the construction difficulty is low, and the working efficiency is high, and the practicality is stronger, in addition, the utility model is provided with fixed rib 6, insertion hole 18 and shock pad 19, the connecting component 2 both sides are symmetrically welded with a plurality of fixed rib 6, and a plurality of insertion holes 18 are evenly opened on the side wall of prefabricated column 1 and prefabricated beam 5, and the fixed rib 6 can be inserted in the insertion hole 18 opened in prefabricated column 1 and prefabricated beam 5 during construction, which can improve the connection accuracy of prefabricated column 1, prefabricated beam 5 and connecting component 2, and can also improve the load-bearing reliability of the three, and the practicality is stronger, in addition, the connecting component 2 both sides are symmetrically fixedly installed with shock pad 19, and the side wall of shock pad 19 abuts against the side wall of prefabricated column 1 and prefabricated beam 5, so that the structure can be buffered when impacted, improve its seismic performance, not easy to damage, enhance the stability of the overall structure.
[0036] In the utility model, unless another definite provision and limitation, the term "installation", "arrangement", "connection", "fixation", "screw connection" and so on term should do the broad sense understanding, for example, can be fixed connection, also can be detachable connection, or be integrated;Can be mechanical connection, also can be electrical connection;Can be directly connected, also can be indirectly connected through the intermediate medium, can be the communication or the interaction relationship of two elements inside two elements, unless another definite limitation, for the ordinary skill in the art, can understand the specific meaning of the above-mentioned term in the utility model according to the specific situation.
[0037] The above only is the preferred embodiment of the utility model, and does not limit the utility model, and any modification, equivalent replacement, improvement etc. that is made within the spirit and principle of the utility model should be included in the protection scope of the utility model.
Claims
1. A fabricated concrete building beam-column joint connection structure, comprising a precast column (1), a precast beam (5) and a connecting component (2), characterized in that, The first butt joint groove (9) is symmetrically arranged on both sides of the prefabricated column (1), the second butt joint groove (17) is symmetrically arranged on both sides of the prefabricated beam (5), the profile steel (3) is cast in the connecting component (2), a plurality of fixing holes (11) are symmetrically arranged on the profile steel (3), the profile steel (3) is respectively inserted into the first butt joint groove (9) and the second butt joint groove (17), the reserved groove (13) is symmetrically arranged on the connecting component (2), the locking plate (7) is arranged in the reserved groove (13), a plurality of locking columns (15) are symmetrically welded on the bottom surface of the locking plate (7), the nut (20) is fixedly installed on the top surface of the reserved groove (13), the fastening screw (4) is threadedly sleeved in the nut (20), and the bottom end of the fastening screw (4) is connected and installed on the top surface of the locking plate (7), the movable groove (8) is symmetrically arranged on the side wall of the prefabricated column (1), a plurality of first through holes (10) are symmetrically arranged between the movable groove (8) and the first butt joint groove (9), a plurality of second through holes (16) are symmetrically arranged on one side of the second butt joint groove (17) and penetrate the side wall of the prefabricated beam (5), and the locking column (15) is inserted into the fixing hole (11) through the first through hole (10) and the second through hole (16).
2. The fabricated concrete building beam-column joint connection structure according to claim 1, characterized by, The guiding sliding rod (12) is symmetrically welded in the reserved groove (13), and the guiding sliding sleeve (14) is symmetrically fixedly installed on the locking plate (7).
3. The fabricated concrete building beam-column joint connection structure according to claim 1, characterized in that, The fixing rib (6) is symmetrically welded on the side wall of the connecting component (2), the prefabricated column (1) and the prefabricated beam (5) are symmetrically provided with a plurality of insertion holes (18) on opposite sides, and the fixing rib (6) is inserted into the insertion hole (18).
4. The fabricated concrete building beam-column joint connection structure according to claim 1, characterized by, The damping pad (19) is symmetrically fixedly installed on the side wall of the connecting component (2).
5. The fabricated concrete building beam-column joint connection structure according to claim 1, characterized by, The profile steel (3) is in the shape of an I-beam.
6. The fabricated concrete building beam-column joint connection structure according to claim 1, characterized by, The diameter of the locking column (15) is smaller than the diameters of the first through hole (10), the second through hole (16) and the fixing hole (11). The diameter of the locking column (15) is smaller than the diameters of the first through hole (10), the second through hole (16) and the fixing hole (11).
Citation Information
Patent Citations
Prefabricated assembly type building concrete beam column profile steel combined connection node structure
CN213926777U