Drainage pipeline mounting structure
By adjusting the height of the drain pipe using guide rods and threaded rods, and combining this with pads and rubber sleeves to protect the anti-rust paint, the problem of inconsistent drain pipe heights is solved, leakage and clamp damage are avoided, and the service life is extended.
Patent Information
- Application Number
- CN202422986472.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-05
- Publication Date
- 2025-11-07
- Estimated Expiration
- 2034-12-05
AI Technical Summary
The existing installation structure makes it difficult to ensure that the height of both ends of the drainage pipe is consistent, which leads to cracks and leaks at the connection. In addition, the clamps can easily scrape off the anti-rust paint on the outside of the drainage pipe, affecting its service life.
It adopts a combination structure of guide rod, threaded rod, clamp seat, pad and rubber sleeve. The height is adjusted by guide rod and threaded rod, and the pad and rubber sleeve protect the pipe and prevent the clamp from damaging the anti-rust paint.
It enables precise adjustment of pipe height, avoids leakage at connections, protects the anti-rust paint on the outside of the pipe, extends its service life, and facilitates pipe replacement without affecting the stability of the fixed structure.
Smart Images

Figure CN223524636U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model belongs to pipeline installation structure technical field, more specifically, especially relate to a drainage pipeline installation structure. BACKGROUND
[0002] When installing the drainage pipe in the underground parking lot, the drainage pipe needs to be fixed on the top of the underground parking lot through the installation structure.
[0003] The existing installation structure is difficult to ensure the height consistency of the two ends of the pipeline after fixing the drainage pipe, and when the heights of the two ends of the pipeline are inconsistent, the pipeline connection part will be cracked and leaked; after being fixed by the existing installation structure, the clamp is easy to scrape off the rust paint on the outer side of the drainage pipe, which affects the service life of the drainage pipe. UTILITY MODEL CONTENTS
[0004] In order to solve the above technical problems, the utility model provides a drainage pipeline installation structure to solve the problems that the existing installation structure is difficult to ensure the height consistency of the two ends of the pipeline after fixing the drainage pipe, and when the heights of the two ends of the pipeline are inconsistent, the pipeline connection part will be cracked and leaked; after being fixed by the existing installation structure, the clamp is easy to scrape off the rust paint on the outer side of the drainage pipe, which affects the service life of the drainage pipe.
[0005] The purpose and effect of the drainage pipeline installation structure are achieved by the following specific technical means:
[0006] A drainage pipeline installation structure, comprising a fixed seat, the fixed seat is fixed on the top of the underground parking lot, two guide rods are slidably arranged on the fixed seat, one end of the two guide rods below is welded on the seat body, a threaded rod is rotatably arranged on the seat body, and the threaded rod is threadedly connected to the fixed seat.
[0007] Further, a clamping seat is clamped on the seat body, four first fixing screws are inserted into the seat body, the four first fixing screws are all threadedly connected to the clamping seat, and the clamping seat penetrates the pipeline.
[0008] Further, the clamping seat is a concave structure, a gasket is adhered in the clamping seat, the pipeline is supported on the gasket, and the gasket is made of rubber.
[0009] Further, a clamp is inserted into the clamping seat, the clamp is clamped on the pipeline, and two locking nuts for locking the pipeline are threadedly connected to the clamp.
[0010] Further, a rubber sleeve is sleeved on the clamp, and the rubber sleeve is in elastic contact with the pipeline after the two locking nuts are tightened.
[0011] Further, the fixing seat is provided with an auxiliary fixing assembly, the auxiliary fixing assembly is composed of a connecting block and a second fixing screw, a connecting block is welded to the left end face and the right end face of the fixing seat, a second fixing screw is inserted into each connecting block, and the two second fixing screws are fixed to the top of the underground parking lot.
[0012] Compared with the prior art, the utility model has the advantages of:
[0013] The height of the pipeline can be adjusted by rotating the threaded rod, and the height of the seat body and the pipeline is adjusted under the driving of the threaded rod, so that the height inconsistency of the two ends of the pipeline is avoided, and the leakage at the connection of the pipeline is ultimately avoided.
[0014] The pipeline is supported by the cushion block, so that the pipeline rust-proof paint on the outer side of the pipeline is prevented from being damaged by the clamping seat, and the service life of the pipeline is ensured, and the pipeline rust-proof paint is prevented from being damaged by the clamp through the elastic contact between the rubber sleeve and the pipeline after the two locking nuts are tightened, and the protection effect of the device is better than that of the prior art.
[0015] When the pipeline is replaced, the four first fixing screws are removed, the pipeline can be replaced, and the fixing seat does not need to be removed, so that the fixing stability of the fixing seat on the top of the underground parking lot is not affected. BRIEF DESCRIPTION OF DRAWINGS
[0016] Figure 1 is the axial view structural schematic diagram of the drainage pipeline mounting structure of the utility model.
[0017] Figure 2 is the main view structural schematic diagram of the drainage pipeline mounting structure of the utility model.
[0018] Figure 3 is the left view structural schematic diagram of the drainage pipeline mounting structure of the utility model.
[0019] Figure 4 is the axial view split structural schematic diagram of the drainage pipeline mounting structure of the utility model.
[0020] Figure 5 is the axial view structural schematic diagram of the drainage pipeline mounting structure of the utility model Figure 4 after rotation.
[0021] Figure 6 is the axial view structural schematic diagram of the clamping seat, the clamp, the locking nut and the rubber sleeve of the utility model.
[0022] In the drawings, the correspondence between the component names and the drawing numbers is as follows:
[0023] 1, fixed seat; 201, guide rod; 202, seat body; 203, threaded rod; 204, clamping seat; 205, first fixed screw; 206, pad; 207, clamp; 208, locking nut; 209, rubber sleeve; 3, auxiliary fixing assembly; 301, connecting block; 302, second fixed screw; 4, pipeline. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme of the embodiments of the utility model will be described clearly and completely below in combination with the drawings of the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, rather than all the embodiments. Based on the described embodiments of the utility model, all other embodiments obtained by those skilled in the art without creative labor belong to the scope of protection of the utility model.
[0025] Unless otherwise defined, the technical terms or scientific terms used herein should be understood as the usual meaning understood by those skilled in the art to which the utility model belongs. The "one", "an" or "the" and similar words used in the utility model patent application description and claims do not represent quantity limitation, but represent the existence of at least one. "Include" or "contain" and similar words mean that the elements or objects before the word cover the elements or objects listed after the word and their equivalents. "Connection" or "connection" and similar words are not limited to physical or mechanical connection, but can include electrical connection, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to represent relative positional relationship, when the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0026] The embodiments of the utility model will be described in further detail below in combination with the drawings and embodiments.
[0027] Embodiment one:
[0028] As shown in the accompanying Figure 1 to the accompanying Figure 6 As shown:
[0029] The utility model provides a kind of drainage pipeline installation structure, including fixed seat 1;Fixed seat 1 is fixed in underground parking lot top, two guide rods 201 are slid on fixed seat 1, both ends below two guide rods 201 are welded on seat body 202, seat body 202 is rotatably provided with a threaded rod 203, threaded rod 203 is threadedly connected on fixed seat 1, when needing to adjust the height of pipeline 4, rotate threaded rod 203, under the drive of threaded rod 203, seat body 202 and pipeline 4 are adjusted in height.
[0030] The seat body 202 is clamped with the clamping seat 204, four first fixing screws 205 are inserted on the seat body 202, the four first fixing screws 205 are all threadedly connected on the clamping seat 204, the clamping seat 204 penetrates the pipeline 4, when the pipeline 4 is replaced, the four first fixing screws 205 are disassembled, at this time, the pipeline 4 can be replaced, without disassembling the fixing seat 1, the fixing stability of the fixing seat 1 on the top of the underground parking lot is avoided.
[0031] The clamping seat 204 is a concave structure, the clamping seat 204 is adhered with a pad 206, the pipeline 4 is supported on the pad 206, the pad 206 is made of rubber, in the use process, the pipeline 4 is supported by the pad 206, the pipeline 4 is prevented from being damaged by the clamping seat 204, and the service life of the pipeline 4 is ensured.
[0032] The clamping seat 204 is inserted with a clamp 207, the clamp 207 is clamped on the pipeline 4, and two locking nuts 208 for locking the pipeline 4 are threadedly connected on the clamp 207.
[0033] The clamp 207 is sleeved with a rubber sleeve 209, the rubber sleeve 209 is in elastic contact with the pipeline 4 after the two locking nuts 208 are tightened, in the use process, the pipeline 4 is prevented from being damaged by the clamp 207 through the elastic contact between the rubber sleeve 209 and the pipeline 4.
[0034] Embodiment two:
[0035] On the basis of embodiment one, the fixing seat 1 is provided with an auxiliary fixing assembly 3, the auxiliary fixing assembly 3 is composed of a connecting block 301 and a second fixing screw 302, one connecting block 301 is welded on the left end face and the right end face of the fixing seat 1, and one second fixing screw 302 is inserted on each connecting block 301, and the two second fixing screws 302 are fixed on the top of the underground parking lot, in the use process, the fixing stability of the fixing seat 1 on the top of the underground parking lot can be improved through the connecting block 301 and the second fixing screw 302.
[0036] Working principle: in the installation, the fixing seat 1 is fixed on the top of the underground parking lot by using the screw, then the two second fixing screws 302 are inserted through the two connecting blocks 301 and are fixed on the top of the underground parking lot; the clamping seat 204 is clamped on the seat body 202 and is fixed through the first fixing screw 205, the pipeline 4 penetrates the seat body 202 and the clamping seat 204, after the pipeline 4 is connected, the clamp 207 is clamped on the pipeline 4, then the locking nut 208 is used to lock the pipeline 4; when the pipeline 4 is replaced, the four first fixing screws 205 are disassembled, then the clamp 207 is removed, at this time, the pipeline 4 can be replaced.
[0037] While the application has been described with reference to the above embodiment, it will be understood by those skilled in the art that various changes can be made and equivalents can be substituted for elements thereof without departing from the scope of the application as defined in the appended claims. Although the specification contains many specific implementation details, these should not be construed as limiting the scope of the application but merely as illustrating particular features. The scope of the application should be limited by the appended claims and their equivalents, rather than by the description preceding them.
Claims
1. A drain pipe installation structure characterized by: Including fixed seat (1), the fixed seat (1) is fixed on the top of underground parking lot, two guide rods (201) are slid on the fixed seat (1), the lower end of the two guide rods (201) is welded on the seat body (202), a threaded rod (203) is rotated on the seat body (202), and the threaded rod (203) is threadedly connected on the fixed seat (1).
2. The drain pipe installation structure according to claim 1, wherein: The seat body (202) is clamped with a clamping seat (204), four first fixed screw rods (205) are inserted on the seat body (202), the four first fixed screw rods (205) are all threadedly connected on the clamping seat (204), and the clamping seat (204) penetrates the pipeline (4).
3. The drain pipe installation structure according to claim 2, wherein: The clamping seat (204) is a concave structure, the clamping seat (204) adheres a cushion block (206), the pipeline (4) is supported on the cushion block (206), and the cushion block (206) is made of rubber material.
4. The drain pipe installation structure according to claim 3, wherein: The clamping seat (204) is inserted with a clamp (207), the clamp (207) is clamped on the pipeline (4), and two locking nuts (208) for locking the pipeline (4) are threadedly connected on the clamp (207).
5. The drain conduit installation structure according to claim 4, wherein: A rubber sleeve (209) is sleeved on the clamp (207), and the rubber sleeve (209) is in elastic contact with the pipeline (4) after the two locking nuts (208) are tightened.
6. The drain pipe installation structure according to claim 5, wherein: The fixed seat (1) is provided with an auxiliary fixing assembly (3), the auxiliary fixing assembly (3) is composed of a connecting block (301) and a second fixed screw rod (302), the left end face and the right end face of the fixed seat (1) are both welded with a connecting block (301), one second fixed screw rod (302) is inserted on each connecting block (301), and the two second fixed screw rods (302) are fixed on the top of the underground parking lot.