Carrying equipment for pipe fitting production
By setting up a fixing mechanism and an auxiliary mechanism on the electric pallet jack, and using a combination of threaded rods, threaded sleeves, rubber pads and steel strips, the problem of the electric pallet jack being unable to fix the slippage of the square steel pipe was solved, and a stable transportation effect was achieved.
Patent Information
- Application Number
- CN202422893368.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-26
- Publication Date
- 2025-11-18
- Estimated Expiration
- 2034-11-26
AI Technical Summary
Existing electric pallet jacks cannot effectively secure square steel pipes during transport, causing the pipes to slide and slip off, making them inconvenient to use.
A fixing mechanism is set on the electric pallet jack, including a threaded rod, a threaded sleeve, a moving plate, a rubber pad, and an auxiliary mechanism. The threaded connection and the rubber pad increase the friction, and together with the steel belt fixing, the stability of the steel pipe is ensured during the transportation process.
This achieves stability of the square steel pipe during transportation, prevents slippage, and improves transportation efficiency and safety.
Smart Images

Figure CN223560395U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to a pipe production carrying equipment technical field especially relates to a pipe production carrying equipment. BACKGROUND
[0002] Steel pipe has hollow section, its length is far greater than diameter or perimeter steel material. According to section shape, it is divided into round, square, rectangular and special-shaped steel pipe;According to material, it is divided into carbon structural steel pipe, low alloy structural steel pipe, alloy steel pipe and composite steel pipe;According to use, it is divided into conveying pipeline, engineering structure, hot work equipment, petroleum and chemical industry, machinery manufacturing, geological drilling, high pressure equipment steel pipe and so on.
[0003] The existing square steel pipe is directly placed on the electric bull after production, however, in the absence of fixed condition, the electric bull can cause the sliding of square steel pipe in the process of turning, so that the both ends of square steel pipe cannot keep balance, and the electric bull is prone to slipping, therefore, the existing electric bull for transporting square steel pipe is inconvenient to use, and the pipe production carrying equipment is provided. UTILITY MODEL CONTENTS
[0004] The utility model discloses a pipe production carrying equipment, which can fix the square steel pipe during transportation, and solves the problem of the existing electric bull in the prior art.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a pipe production carrying equipment, comprising: an electric bull, a fixing mechanism is arranged on the top of the electric bull, the fixing mechanism comprises a pad, a threaded rod is sleeved in the inside of the pad, a threaded sleeve block is sleeved on the outer surface of the threaded rod, the threaded sleeve block is threadedly connected with the threaded rod, the threaded sleeve block is sleeved in the inside of the pad, the threaded sleeve block is slidably connected with the pad, a moving plate is fixedly connected to the top of the threaded sleeve block, a fixed plate is arranged on one side of the moving plate, the fixed plate is fixedly connected with the pad, rubber pads are fixedly connected to the outer surfaces of the moving plate and the fixed plate, a connecting block is fixedly connected to the outer surface of the pad, a bolt one is sleeved in the inside of the electric bull and the connecting block, the bolt one is slidably connected with the connecting block, and the bolt one is threadedly connected with the electric bull.
[0006] As a preferred embodiment, one end of the threaded rod is sleeved with a bearing on the outer surface, the bearing is arranged in the groove formed in the inside of the pad, the bearing is fixedly connected with the inner wall of the pad and the outer surface of the threaded rod, and a handle is fixedly connected to one end of the threaded rod.
[0007] As a preferred implementation form, the two ends of the base plate are provided with auxiliary mechanisms, the auxiliary mechanism comprises a fixed block one, the fixed block one is fixedly connected with the base plate, and one side of the fixed block one is provided with a fixed block two.
[0008] As a preferred implementation form, the fixed block two is fixedly connected with the base plate, and the fixed block one is sleeved with a steel band inside.
[0009] As a preferred implementation form, the steel band is fixedly connected with the fixed block one, and the steel band penetrates the inside of the fixed block two.
[0010] As a preferred implementation form, the steel band is slidably connected with the fixed block two, and a through slot is formed in the fixed block two.
[0011] As a preferred implementation form, the inside of the fixed block two is sleeved with a bolt two, and the bolt two is threadedly connected with the fixed block two.
[0012] Compared with the prior art, the utility model has the advantages and positive effects that:
[0013] The utility model discloses a fixed mechanism is set up, so that the electric ground ox can transport a certain number of square steel pipes, and ensures that the square steel pipe does not appear to slip when transporting, and the moving plate is set up, and the moving plate can move under the action of the threaded rod and the threaded sleeve block, and then the moving plate can extrude the square steel pipe and fix, so that the stability of the steel pipe is ensured, and the rubber pad is set up, so that the friction between the moving plate, the fixed plate and the square steel pipe is greater, and then the square steel pipe does not appear to slip when the electric ground ox turns, and the auxiliary mechanism is set up, can cooperate with the fixed mechanism and use, fixes the square steel pipe of a certain number and neatly stacked from the top, avoids the square steel pipe and appears the displacement of the up-down type because of the jolt and shakes, so that the stability of the square steel pipe when transporting is further ensured. ACCURACY OF DRAWINGS
[0014] Figure 1 It is a perspective view of the pipe production carrying equipment provided by the utility model.
[0015] Figure 2 It is a perspective view of the fixed mechanism of the pipe production carrying equipment provided by the utility model.
[0016] Figure 3 It is a threaded rod installation schematic view of the pipe production carrying equipment provided by the utility model.
[0017] Figure 4 It is a perspective view of the auxiliary mechanism of the pipe production carrying equipment provided by the utility model.
[0018] LEGEND:
[0019] 1. Electric pallet jack; 2. Fixing mechanism; 3. Auxiliary mechanism; 21. Pad; 22. Threaded rod;
[0020] 23. Threaded sleeve; 24. Moving plate; 25. Fixed plate; 26. Rubber pad; 27. Bearing;
[0021] 28. Throttle handle; 29. Connecting block; 201. Bolt 1; 31. Fixing block 1; 32. Fixing block 2;
[0022] 33. Steel strip; 34. Through groove; 35. Two bolts. Detailed Implementation
[0023] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0024] Example 1
[0025] like Figures 1-3 As shown, this utility model provides a technical solution: a handling device for pipe fitting production, comprising: an electric pallet jack 1, a fixing mechanism 2 on the top of the electric pallet jack 1, the fixing mechanism 2 including a pad 21, a threaded rod 22 sleeved inside the pad 21, a threaded sleeve block 23 sleeved on the outer surface of the threaded rod 22, the threaded sleeve block 23 being threadedly connected to the threaded rod 22, the threaded sleeve block 23 being sleeved inside the pad 21, the threaded sleeve block 23 being slidably connected to the pad 21, a movable plate 24 fixedly connected to the top of the threaded sleeve block 23, a fixing plate 25 on one side of the movable plate 24, and the fixing plate 25 being connected to the pad 21. 21. A rubber pad 26 is fixedly connected to the outer surface of both the movable plate 24 and the fixed plate 25. A connecting block 29 is fixedly connected to the outer surface of the pad 21. Bolts 201 are fitted inside both the connecting block 29 and the electric pallet jack 1. Bolts 201 are slidably connected to the connecting block 29 and threadedly connected to the electric pallet jack 1. A bearing 27 is fitted to the outer surface of one end of the threaded rod 22. The bearing 27 is placed in a groove opened inside the pad 21. The bearing 27 is fixedly connected to the inner wall of the pad 21 and the outer surface of the threaded rod 22. A throttle 28 is fixedly connected to one end of the threaded rod 22.
[0026] In this embodiment, by setting the fixed mechanism 2, the stacked square steel pipes can be extruded and fixed, and the stacked square steel pipes will not slip during the transfer by the electric bull 1. The threaded rod 22 is set, and the threaded rod 22 can drive the threaded sleeve block 23 in screw, so that the threaded sleeve block 23 can move, thereby driving the moving plate 24 to move, so that the moving plate 24 can adaptively change its position according to the volume of the stacked square steel pipes, and the stacked square steel pipes are fixed under the cooperation of the fixed plate 25. The rubber pad 26 is set, so that the contact friction between the moving plate 24, the fixed plate 25 and the square steel pipe is larger, and the electric bull 1 can be more stable during the transfer of the square steel pipe.
[0027] Embodiment 2
[0028] As shown in Figure 1 and Figure 4 The two ends of the backing plate 21 are provided with auxiliary mechanisms 3. The auxiliary mechanism 3 includes a fixed block one 31 fixedly connected with the backing plate 21. One side surface of the fixed block one 31 is provided with a fixed block two 32 fixedly connected with the backing plate 21. The inside of the fixed block one 31 is sleeved with a steel belt 33 fixedly connected with the fixed block one 31. The steel belt 33 penetrates through the inside of the fixed block two 32 and is in sliding connection with the fixed block two 32. The fixed block two 32 is provided with a through slot 34. The inside of the fixed block two 32 is sleeved with a bolt two 35 in screw connection with the fixed block two 32.
[0029] In this embodiment, the auxiliary mechanism 3 is set, so that the stacked square steel pipes can be further fixed, and the fixing of the stacked square steel pipes can be conveniently released, without affecting the transfer efficiency of the square steel pipes. The steel belt 33 is set, and the flexibility of the steel belt 33 is utilized, so that the steel belt 33 can better fit the square steel pipe and fix the square steel pipe from the top. The through slot 34 is set on the fixed block two 32, so that the steel belt 33 can penetrate through the fixed block two 32. In addition, the bolt two 35 is set, which can tightly fix the steel belt 33, so as to fix the stacked square steel pipes by the steel belt 33.
[0030] Working principle:
[0031] As shown in Figures 1-4As shown, in use, the base plate 21 can be connected with the electric earth boulder 1 first, and the base plate 21 can be stably connected on the electric earth boulder 1 under the action of the connecting block 29 and the bolt one 201, if a certain number of square steel pipes need to be transported, the square steel pipes can be stacked on the top of the base plate 21, and the square steel pipes are first attached with the fixed plate 25 when stacking, then the square steel pipe stack of a certain height and a certain width is formed, at this time, the rotating handle 28 drives the threaded rod 22 to rotate, the threaded rod 22 is threaded driven to the threaded sleeve block 23 when rotating, and the threaded sleeve block 23 can drive the moving plate 24 to move, until the moving plate 24 drives the rubber pad 26 connected therewith to be in close contact with the stacked square steel pipe, then the auxiliary mechanism 3 is used to further fix the stacked square steel pipe, the steel band 33 passes through the top of the stacked square steel pipe, then the steel band 33 passes through the through slot 34 opened in the fixed block two 32, at this time, the steel band 33 is tightened and kept stable, then the bolt two 35 is screwed with the fixed block two 32, until the bolt two 35 tightly fixes the steel band 33, at this time, the stacked square steel pipe can be transported by the electric earth boulder 1, and the situation of slipping does not occur.
[0032] The above is only a preferred embodiment of the utility model, and is not intended to limit the utility model in other forms. Any skilled person in the art can modify or change the above disclosed technical content to equivalent embodiments applied to other fields. However, any simple modification, equivalent change and modification of the above embodiments based on the technical essence of the utility model still belong to the protection scope of the utility model technical scheme.
Claims
1. A handling equipment for pipe fitting production, characterized in that, include: An electric pallet jack (1) is provided with a fixing mechanism (2) on its top. The fixing mechanism (2) includes a pad (21). A threaded rod (22) is sleeved inside the pad (21). A threaded sleeve block (23) is sleeved on the outer surface of the threaded rod (22). The threaded sleeve block (23) is threadedly connected to the threaded rod (22). The threaded sleeve block (23) is sleeved inside the pad (21). The threaded sleeve block (23) is slidably connected to the pad (21). A movable plate (2) is fixedly connected to the top of the threaded sleeve block (23). 4) A fixed plate (25) is provided on one side of the movable plate (24). The fixed plate (25) is fixedly connected to the pad (21). Rubber pads (26) are fixedly connected to the outer surfaces of the movable plate (24) and the fixed plate (25). A connecting block (29) is fixedly connected to the outer surface of the pad (21). Bolts (201) are sleeved inside the connecting block (29) and the electric pallet jack (1). Bolts (201) are slidably connected to the connecting block (29). Bolts (201) are threadedly connected to the electric pallet jack (1).
2. The handling equipment for pipe fitting production according to claim 1, characterized in that: A bearing (27) is fitted onto the outer surface of one end of the threaded rod (22). The bearing (27) is placed in a groove inside the pad (21). The bearing (27) is fixedly connected to the inner wall of the pad (21) and the outer surface of the threaded rod (22). A throttle (28) is fixedly connected to one end of the threaded rod (22).
3. The handling equipment for pipe fitting production according to claim 1, characterized in that: Both ends of the pad (21) are provided with auxiliary mechanisms (3). The auxiliary mechanism (3) includes a fixing block one (31), which is fixedly connected to the pad (21). A fixing block two (32) is provided on one side of the fixing block one (31).
4. The handling equipment for pipe fitting production according to claim 3, characterized in that: The second fixing block (32) is fixedly connected to the pad (21), and the first fixing block (31) has a steel strip (33) sleeved inside.
5. A handling equipment for pipe fitting production according to claim 4, characterized in that: The steel strip (33) is fixedly connected to the first fixing block (31), and the steel strip (33) passes through the interior of the second fixing block (32).
6. A handling equipment for pipe fitting production according to claim 5, characterized in that: The steel strip (33) is slidably connected to the second fixing block (32), and the second fixing block (32) is provided with a through groove (34).
7. A handling device for pipe fitting production according to claim 6, characterized in that: The second fixing block (32) is fitted with a second bolt (35), which is threadedly connected to the second fixing block (32).