Antirust paint spraying device for scaffold
By designing an automatic height and orientation scaffolding anti-rust painting device, the problem of inflexible adjustment of existing painting equipment has been solved, realizing efficient and flexible painting operation and improving painting efficiency and drying speed.
Patent Information
- Application Number
- CN202422340647.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2025-11-21
- Estimated Expiration
- 2034-09-24
AI Technical Summary
In existing technologies, the height and orientation adjustment of scaffolding painting equipment is inflexible, resulting in limited painting functions and requiring manual adjustment, which affects the flexibility and efficiency of equipment use.
A scaffolding anti-rust painting device was designed, which includes a processing support frame, a painting mechanism, and a height adjustment mechanism. The device achieves automatic adjustment of the painting height and orientation through an electric telescopic rod and a drive motor. Combined with solar power supply and wireless signal control, it improves the flexibility of the equipment and the comprehensiveness of the painting.
The system enables automatic adjustment of the height and orientation of the scaffolding painting equipment, improving the equipment's flexibility and the comprehensiveness of the painting process, simplifying the operation process, and increasing painting efficiency and drying speed.
Smart Images

Figure CN223571091U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to a scaffold anti -rust paint spraying device. BACKGROUND
[0002] Scaffold refers to various steel pipe supports that are erected at construction sites for workers to operate and solve vertical and horizontal transportation. It is a general term in the construction industry, which refers to the use of external walls, internal decoration or layer height higher than direct construction places on the construction site, mainly for construction personnel to work up and down or peripheral safety net enclosure and high-altitude installation components, in simple terms, it is to build a scaffold, and the scaffold manufacturing materials usually include bamboo, wood, steel pipes or synthetic materials, and some projects also use scaffolds as formwork, in addition, it is also widely used in the advertising industry, municipal, traffic road and bridge, and mining department.
[0003] In the prior art, manual paint spraying of the scaffold is time-consuming and laborious, and the overall paint spraying function is relatively single, the height, direction and angle of the paint spraying equipment cannot be adjusted according to the requirements of the use scene, manual paint spraying at individual locations is still required, and the flexibility of equipment use is affected.
[0004] To solve the above problems, a scaffold anti -rust paint spraying device is provided in the application. UTILITY MODEL CONTENTS
[0005] The utility model provides a scaffold anti -rust paint spraying device in view of the prior art existing technical problem.
[0006] The technical scheme for solving the above technical problem is as follows: a scaffold anti -rust paint spraying device, comprising a processing support frame,
[0007] The top of the processing support frame is provided with a first support table;
[0008] The top of the processing support frame is provided with a second support table on one side of the first support table, both sides of the second support table are fixedly connected with reinforcing side plates, both of the reinforcing side plates are located on both sides of the processing support frame, the top of the second support table is fixedly connected with a second driving motor, the output end of the second driving motor is fixedly connected with a support plate, the top of the support plate is fixedly connected with a mounting horizontal plate, one side of the mounting horizontal plate is fixedly connected with a connecting horizontal plate, a paint spraying mechanism is installed below the connecting horizontal plate, a height adjusting mechanism is installed between the paint spraying mechanism and the support column;
[0009] The paint spraying mechanism comprises a limiting box, a mounting bottom plate is mounted below the height adjusting mechanism, the bottom of the mounting bottom plate is fixedly connected with the limiting box, a raw material storage tank is rotatably connected in the limiting box, a limiting rotating shaft penetrating through the raw material storage tank is mounted on the outer side of the limiting box, both ends of the limiting rotating shaft penetrate through the limiting box, a spray gun is mounted on the bottom of the raw material storage tank, and a discharge port is mounted on the bottom of the spray gun. The processing support frame, the first supporting table, the second supporting table and the paint spraying mechanism are provided. When in use, the height adjusting mechanism is installed, the control knob and the valve are opened for normal paint spraying treatment. When the paint spraying height needs to be adjusted, the electric telescopic rod is operated to drive the push rod to move downward, so that the mounting bottom plate moves downward under stress, thereby adjusting the overall operation height of the paint spraying mechanism, improving the use flexibility of the equipment, meeting different operation scenes, and when the mounting bottom plate slides, the four sliding support rods are simultaneously slid out from the corresponding connecting sleeves, achieving the equipment buffering effect. When the paint spraying direction needs to be adjusted, the second driving motor is operated to drive the supporting plate to rotate, thereby adjusting the overall direction of the height adjusting mechanism, improving the comprehensiveness of the actual scaffold paint spraying, and the single article and equipment can also be painted. After paint spraying, the equipment and articles can be classified and placed on the first airing plate and the second airing plate. The first driving motor is operated to drive the first rotating frame to rotate, thereby driving the four supporting vertical rods to rotate, the positions of the first airing plate and the second airing plate on the top of the supporting vertical rods are changed, and the overall air drying efficiency is improved, thereby solving the technical problem that the overall paint spraying function is relatively single.
[0010] Preferably, a handle is mounted on one side of the spray gun, a control knob is mounted on one side of the spray gun below the handle, and a valve is fixedly connected to the outer side of the discharge port.
[0011] The valve is used to control the opening and closing of the discharge port, and the handle is used to facilitate the convenient treatment of the overall paint spraying mechanism.
[0012] Preferably, the height adjusting mechanism comprises an electric telescopic rod and a push rod, the bottom of the connecting horizontal plate is fixedly connected with the electric telescopic rod, the output end of the electric telescopic rod is fixedly connected with the push rod, one end of the bottom of the push rod is fixedly connected with the mounting bottom plate, and connecting sleeves are fixedly connected around the bottom of the electric telescopic rod.
[0013] The electric telescopic rod is operated to drive the push rod to move downward, so that the mounting bottom plate moves downward under stress, thereby adjusting the overall operation height of the paint spraying mechanism, improving the use flexibility of the equipment, meeting different operation scenes, and when the mounting bottom plate slides, the four sliding support rods are simultaneously slid out from the corresponding connecting sleeves, achieving the equipment buffering effect.
[0014] Preferably, the top of the mounting cross plate is fixedly connected with an electricity storage bin, the top of the electricity storage bin is fixedly connected with a solar panel photovoltaic panel, and the inside of the electricity storage bin is provided with an inverter matched with the solar panel photovoltaic panel.
[0015] The outdoor solar energy light resources are collected through the solar panel photovoltaic panel, the light resources are converted into electric power resources in time through the inverter, and the electric power resources are uniformly stored through the electricity storage bin, so that the electric power resource supply is provided for outdoor equipment operation, and the flexibility of equipment use is improved.
[0016] Preferably, the top of the first supporting table is fixedly connected with a first driving motor, the output end of the first driving motor is fixedly connected with a first rotating frame, the top of the first rotating frame is fixedly connected with equidistantly distributed supporting vertical rods, the supporting vertical rods are distributed in a circular ring shape, the top of two of the supporting vertical rods is fixedly connected with a first drying plate, the top of the other two supporting vertical rods is fixedly connected with a second drying plate, the first drying plate and the second drying plate are staggered, the two sides of the first supporting table are fixedly connected with reinforcing side plates, one side of each of the reinforcing side plates is connected with a processing supporting frame, and the bottom of the processing supporting frame is fixedly connected with universal wheels around the periphery.
[0017] The first drying plate and the second drying plate are mounted with articles and equipment that have just completed paint spraying, the first supporting table and the processing supporting frame are fixedly connected through the two reinforcing side plates, the first rotating frame is driven to rotate through the rotation of the first driving motor, the four supporting vertical rods are driven to rotate, and the positions of the first drying plate and the second drying plate at the top of the supporting vertical rods are changed, so that the overall air-drying efficiency is improved.
[0018] Preferably, the top of the supporting plate and on one side of the supporting column are fixedly connected with a wireless signal transceiver, the inside of the wireless signal transceiver is fixedly connected with a main control board, the outside of the main control board is fixedly connected with a control chip, and the first driving motor, the second driving motor, the electricity storage bin, the solar panel photovoltaic panel, the wireless signal transceiver, the valve and the electric telescopic rod are electrically connected with the control chip.
[0019] The first driving motor, the second driving motor, the electricity storage bin, the solar panel photovoltaic panel, the wireless signal transceiver, the valve and the electric telescopic rod are controlled to operate through the control chip, and the normal management of electric power equipment is realized.
[0020] The utility model discloses the beneficial effect is:
[0021] The utility model provides a kind of painting device for scaffold, including height adjusting mechanism, first support table, second support table and paint spraying mechanism, when using, the whole height adjusting mechanism is installed, control knob and valve are opened to carry out normal paint spraying process, when the height of paint spraying needs to be adjusted, the installation bottom plate is moved downwards by electric telescopic rod operation, so that the whole operation height of paint spraying mechanism is adjusted, the use flexibility of equipment is improved, meets different operation scene, when installation bottom plate slides, four sliding support rods are slid from the inside of corresponding connecting sleeve simultaneously, equipment buffering effect is realized, when the direction of paint spraying needs to be adjusted, the whole direction of height adjusting mechanism is adjusted by the second drive motor operation, the angle of raw material storage tank installed in the inside is fine-tuned by limiting box, paint spraying angle is adjusted, the comprehensiveness when actual scaffold is painted is improved, single article and equipment can also be painted, equipment and article after painting can be placed on the surface of first airing plate and second airing plate, the first rotating frame is rotated by the first drive motor operation, four support vertical rods are rotated, the position of first airing plate and second airing plate on the top of support vertical rod is changed, the whole air-drying efficiency is accelerated, the technical problem that the whole paint spraying function is relatively single is solved. BRIEF DESCRIPTION OF DRAWINGS
[0022] Figure 1 It is overall structure front view of the utility model;
[0023] Figure 2 It is overall structure side view of the utility model;
[0024] Figure 3 It is overall structure plan view of the utility model;
[0025] Figure 4 It is paint spraying mechanism enlarged schematic view of the utility model;
[0026] Figure 5 It is height adjusting mechanism enlarged schematic view of the utility model.
[0027] In the drawings, the component list represented by each sign is as follows:
[0028] 1, processing support frame;
[0029] 2, first support table;21, reinforcing side plate;22, first drive motor;23, first rotating frame;24, support vertical rod;25, first airing plate;26, second airing plate;
[0030] 3, second support table;31, second drive motor;32, support plate;33, support column;34, installation horizontal plate;35, connecting horizontal plate;36, power storage bin;37, solar panel photovoltaic panel;38, wireless signal transceiver;39, installation bottom plate;
[0031] 4. paint spraying mechanism; 41. limiting box; 42. raw material storage tank; 43. spray gun; 44. handle; 45. control knob; 46. discharge port; 47. valve; 48. limiting rotating shaft;
[0032] 5. height adjusting mechanism; 51. electric telescopic rod; 52. push rod; 53. connecting sleeve; 54. sliding support rod;
[0033] 6. universal wheel. DETAILED DESCRIPTION
[0034] The technical solutions in the embodiments of the present application will be described clearly and completely below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments of the present application. Based on the embodiments in the present application, all the other embodiments obtained by those skilled in the art without creative work fall within the scope of protection of the present application.
[0035] In the description of the present application, the terms "first", "second" are used only for the purpose of description, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined with "first", "second" can explicitly or implicitly include one or more of the features. In the description of the present application, the meaning of "multiple" is two or more, unless otherwise specifically limited.
[0036] In the description of the present application, the term "for example" is used to indicate "as an example, illustration or description". Any embodiment described as "for example" in the present application is not necessarily interpreted as more preferred or more advantageous than other embodiments. The following description is given in order to enable any person skilled in the art to implement and use the present application. In the following description, details are listed for the purpose of explanation. It should be understood that those skilled in the art can realize the present application without using these specific details. In other examples, well-known structures and processes will not be described in detail in order to avoid unnecessary details making the description of the present application obscure. Therefore, the present application is not intended to be limited to the shown embodiments, but is consistent with the broadest scope of principles and features disclosed in the present application.
[0037] Reference Figures 1-5The utility model provides a scaffold rust -proof paint spraying device, including processing support frame 1, the top of processing support frame 1 is equipped with first support table 2, the top of processing support frame 1 and located first support table 2 one side is equipped with second support table 3, both sides of second support table 3 are fixedly connected with reinforcing side plate 21, two reinforcing side plates 21 are located the both sides of processing support frame 1, the top of second support table 3 is fixedly connected with second drive motor 31, the output of second drive motor 31 is fixedly connected with support plate 32, the top of support plate 32 is fixedly connected with installation crosspiece 34, one side of installation crosspiece 34 is fixedly connected with connecting crosspiece 35, and the paint spraying mechanism 4 is installed below connecting crosspiece 35, and the height adjusting mechanism 5 is installed between paint spraying mechanism 4 and support stand 33, paint spraying mechanism 4 includes limiting box 41, and the below of height adjusting mechanism 5 is installed with installation bottom plate 39, and the bottom of installation bottom plate 39 is fixedly connected with limiting box 41, and the inside rotation of limiting box 41 is connected with raw material storage tank 42, and the outside of limiting box 41 is installed with the limiting pivot 48 that penetrates raw material storage tank 42, and both ends of limiting pivot 48 all penetrate limiting box 41, and the bottom of raw material storage tank 42 is installed with spray gun 43, and the bottom of spray gun 43 is installed with discharge port 46, and be equipped with processing support frame 1, first support table 2, second support table 3 and paint spraying mechanism 4, when using, the overall height adjusting mechanism 5 is installed, opens control knob 45 and valve 47 and carries out normal paint spraying treatment, when needing to adjust the height of paint spraying, through electric telescopic link 51 operation, push rod 52 is moved downwards, so that installation bottom plate 39 is stressed and moves downwards, thereby the overall operation height of paint spraying mechanism 4 is adjusted, the use flexibility of equipment is improved, meets different operation scene, when installation bottom plate 39 slides, four sliding support rods 54 are simultaneously driven from the inside of corresponding connecting sleeve 53 and slide out, realize the equipment buffering effect, when needing to adjust the paint spraying direction, through second drive motor 31 operation, support plate 32 is rotated, thereby the overall direction of height adjusting mechanism 5 is adjusted, improve the comprehensiveness when actually painting scaffold, also can paint single article and equipment, after the completion of paint spraying, equipment and article can be classified and placed on the surface of first airing plate 25, second airing plate 26, through first drive motor 22 operation, first rotating frame 23 is rotated, four support vertical rods 24 are rotated, the position of first airing plate 25 and second airing plate 26 on the top of support vertical rod 24 is changed, the overall air drying efficiency is accelerated, and the technical problem that the overall paint spraying function is relatively single is solved.
[0038] Refer to Figures 1-4 , one side of spray gun 43 is installed with handle 44, one side of spray gun 43 and located below handle 44 is installed with control knob 45, the outside of discharge port 46 is fixedly connected with valve 47, valve 47 is used for controlling discharge port 46 opening and closing, handle 44 is used for conveniently and conveniently processing the overall paint spraying mechanism 4.
[0039] With reference to Figure 5 , the height adjusting mechanism 5 comprises an electric telescopic rod 51 and a push rod 52, the bottom of the connecting horizontal plate 35 is fixedly connected with the electric telescopic rod 51, the output end of the electric telescopic rod 51 is fixedly connected with the push rod 52, one end of the bottom of the push rod 52 is fixedly connected with the mounting bottom plate 39, the bottom of the connecting horizontal plate 35 and around the electric telescopic rod 51 are fixedly connected with connecting sleeves 53, the bottoms of the four connecting sleeves 53 are slidably connected with sliding support rods 54, one end of the bottom of each of the four sliding support rods 54 is fixedly connected with the mounting bottom plate 39, through the operation of the electric telescopic rod 51, the push rod 52 is driven to move downward, so that the mounting bottom plate 39 is forced to move downward, thereby adjusting the overall operation height of the paint spraying mechanism 4, improving the use flexibility of the equipment, meeting different operation scenes, when the mounting bottom plate 39 slides, the four sliding support rods 54 will be synchronously driven to slide out from the corresponding connecting sleeves 53, realizing the equipment buffering effect.
[0040] With reference to Figures 1-3 , the top of the mounting horizontal plate 34 is fixedly connected with a power storage bin 36, the top of the power storage bin 36 is fixedly connected with a solar panel photovoltaic panel 37, an inverter used in cooperation with the solar panel photovoltaic panel 37 is installed inside the power storage bin 36, outdoor solar energy light resources are collected through the solar panel photovoltaic panel 37, the inverter timely converts light resources into electric power resources, which are uniformly stored through the power storage bin 36, providing power resource supply for outdoor equipment operation, improving the use flexibility of the equipment.
[0041] With reference to Figures 1-3 , the top of the first support table 2 is fixedly connected with a first driving motor 22, the output end of the first driving motor 22 is fixedly connected with a first rotating frame 23, the top of the first rotating frame 23 is fixedly connected with equidistantly distributed support vertical rods 24, the support vertical rods 24 are distributed in a circular ring shape, the top of two of the support vertical rods 24 is fixedly connected with a first drying plate 25, the top of the other two support vertical rods 24 is fixedly connected with a second drying plate 26, the first drying plate 25 and the second drying plate 26 are staggered, the two sides of the first support table 2 are fixedly connected with reinforcing side plates 21, one side of each of the reinforcing side plates 21 is connected with the processing support frame 1, the bottom of the processing support frame 1 is fixedly connected with universal wheels 6, the overall equipment is conveniently moved through the driving of the universal wheels 6, the top of each of the first drying plate 25 and the second drying plate 26 is installed with an article just finished with paint and equipment, the first support table 2 and the processing support frame 1 are reinforced and connected through the cooperation of the two reinforcing side plates 21, through the operation of the first driving motor 22, the first rotating frame 23 is driven to rotate, driving the four support vertical rods 24 to rotate, the positions of the first drying plate 25 and the second drying plate 26 on the top of the support vertical rods 24 are changed, and the overall air drying efficiency is improved.
[0042] With reference to Figures 1-5The top of the support plate 32 and one side of the support column 33 are fixedly connected with a wireless signal transceiver 38, the inside of the wireless signal transceiver 38 is fixedly connected with a main control board, the outside of the main control board is fixedly connected with a control chip, the first driving motor 22, the second driving motor 31, the power storage bin 36, the solar panel photovoltaic panel 37, the wireless signal transceiver 38, the valve 47 and the electric telescopic rod 51 are electrically connected with the control chip, and the control chip is used for controlling the first driving motor 22, the second driving motor 31, the power storage bin 36, the solar panel photovoltaic panel 37, the wireless signal transceiver 38, the valve 47 and the electric telescopic rod 51 to run, so that the normal management of the power equipment is realized.
[0043] Working principle:
[0044] When in use, the electric telescopic rod 51 is operated to drive the push rod 52 to move downward, so that the installation bottom plate 39 moves downward under stress, thereby adjusting the working height of the paint spraying mechanism 4 as a whole, improving the use flexibility of the equipment, and meeting different working scenes. When the installation bottom plate 39 slides, the four sliding support rods 54 are simultaneously driven to slide out from the inside of the corresponding connecting sleeve 53, so that the equipment buffering effect is realized.
[0045] The valve 47 is used for controlling the opening of the discharge port 46, and the handle 44 is used for conveniently and conveniently processing the paint spraying mechanism 4 as a whole.
[0046] The inside of the power storage bin 36 is provided with an inverter matched with the solar panel photovoltaic panel 37. The outdoor solar energy light resources are collected through the solar panel photovoltaic panel 37. The inverter timely converts the light resources into electric power resources, which are uniformly stored through the power storage bin 36, so as to provide power resource supply for outdoor equipment operation, and improve the use flexibility of the equipment.
[0047] The first drying plate 25 and the second drying plate 26 are staggered, and the top of the first drying plate 25 and the second drying plate 26 is provided with the equipment and the article just finished with paint spraying.
[0048] The whole equipment is conveniently moved through the universal wheel 6.
[0049] The control chip controls the first driving motor 22, the second driving motor 31, the power storage bin 36, the solar panel photovoltaic panel 37, the wireless signal transceiver 38, the valve 47 and the electric telescopic rod 51 to run, so that the normal management of the power equipment is realized.
[0050] The height adjusting mechanism 5 as a whole is installed, the control knob 45 and the valve 47 are opened, and the normal paint spraying treatment is carried out. When the paint spraying height needs to be adjusted, the electric telescopic rod 51 is operated to drive the push rod 52 to move downward, so that the installation bottom plate 39 moves downward under stress, thereby adjusting the working height of the paint spraying mechanism 4 as a whole, improving the use flexibility of the equipment, and meeting different working scenes.
[0051] When the installation bottom plate 39 slides, the four sliding support rods 54 are synchronously driven to slide out from the inside of the corresponding connecting sleeve 53, achieving the equipment buffering effect;
[0052] When the paint spraying orientation needs to be adjusted, the second driving motor 31 is operated to drive the support plate 32 to rotate, thereby driving the overall orientation adjustment of the height adjusting mechanism 5, and the angle fine adjustment of the raw material storage tank 42 installed inside can be realized through the cooperation of the limiting box 41, which improves the comprehensiveness of the actual painting of the scaffold and can also paint single articles and equipment. After the painting is completed, the equipment and articles can be classified and placed on the surfaces of the first airing plate 25 and the second airing plate 26. The first driving motor 22 is operated to drive the first rotating frame 23 to rotate, thereby driving the four support vertical rods 24 to rotate, the position transformation of the first airing plate 25 and the second airing plate 26 at the top of the support vertical rods 24 is realized, the overall air-drying efficiency is accelerated, and the technical problem of the single overall painting function is solved.
[0053] Although the preferred embodiments of the present application have been described, those skilled in the art who have the basic inventive concept can make further changes and modifications to these embodiments. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.
[0054] Obviously, those skilled in the art can make various modifications and variations to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application also intends to include these modifications and variations.
Claims
1. A scaffolding anti-rust spraying device, comprising a processing support frame (1), characterized in that, The top of the processing support frame (1) is equipped with a first support platform (2); A second support platform (3) is installed on the top of the processing support frame (1) and on one side of the first support platform (2). Reinforcing side plates (21) are fixedly connected to both sides of the second support platform (3). A second drive motor (31) is fixedly connected to the top of the second support platform (3). A support plate (32) is fixedly connected to the output end of the second drive motor (31). A mounting horizontal plate (34) is fixedly connected to the top of the support plate (32). A connecting horizontal plate (35) is fixedly connected to one side of the mounting horizontal plate (34). A painting mechanism (4) is installed below the connecting horizontal plate (35). A height adjustment mechanism (5) is installed between the painting mechanism (4) and the support column (33). The painting mechanism (4) includes a limiting box (41). A mounting base plate (39) is installed below the height adjustment mechanism (5). The limiting box (41) is fixedly connected to the bottom of the mounting base plate (39). A raw material storage tank (42) is rotatably connected inside the limiting box (41). A limiting shaft (48) penetrating the raw material storage tank (42) is installed on the outside of the limiting box (41). Both ends of the limiting shaft (48) penetrate the limiting box (41). A spray gun (43) is installed at the bottom of the raw material storage tank (42). A discharge port (46) is installed at the bottom of the spray gun (43).
2. The scaffolding anti-rust spraying device according to claim 1, characterized in that, A handle (44) is installed on one side of the spray gun (43), a control knob (45) is installed on one side of the spray gun (43) and below the handle (44), and a valve (47) is fixedly connected to the outside of the discharge port (46).
3. The scaffolding anti-rust spraying device according to claim 2, characterized in that, The height adjustment mechanism (5) includes an electric telescopic rod (51) and a push rod (52). The electric telescopic rod (51) is fixedly connected to the bottom of the connecting horizontal plate (35). The push rod (52) is fixedly connected to the output end of the electric telescopic rod (51). One bottom end of the push rod (52) is fixedly connected to the mounting base plate (39). Connecting sleeves (53) are fixedly connected to the bottom of the connecting horizontal plate (35) and around the electric telescopic rod (51). Sliding support rods (54) are slidably connected to the bottom of the four connecting sleeves (53). One bottom end of the four sliding support rods (54) is fixedly connected to the mounting base plate (39).
4. The scaffolding anti-rust spraying device according to claim 3, characterized in that, The top of the mounting plate (34) is fixedly connected to an energy storage compartment (36), and the top of the energy storage compartment (36) is fixedly connected to a solar photovoltaic panel (37).
5. A scaffolding anti-rust spraying device according to claim 4, characterized in that, The top of the first support platform (2) is fixedly connected to a first drive motor (22), the output end of the first drive motor (22) is fixedly connected to a first rotating frame (23), and the top of the first rotating frame (23) is fixedly connected to equidistant support poles (24).
6. The scaffolding anti-rust spraying device according to claim 5, characterized in that, Two of the support poles (24) are fixedly connected to the top of a first drying board (25), and the other two support poles (24) are fixedly connected to the top of a second drying board (26). The first drying board (25) and the second drying board (26) are staggered. Both sides of the first support platform (2) are fixedly connected to a reinforcing side plate (21). One side of the reinforcing side plate (21) is connected to the processing support frame (1). The bottom of the processing support frame (1) is fixedly connected to casters (6).
7. A scaffolding anti-rust spraying device according to claim 5, characterized in that, A wireless transceiver (38) is fixedly connected to the top of the support plate (32) and to one side of the support column (33). The first drive motor (22), the second drive motor (31), the battery storage compartment (36), the solar photovoltaic panel (37), the valve (47), and the electric telescopic rod (51) are all electrically connected to the wireless transceiver (38).