Brake pad production mixed material temporary sampling trolley
By designing a temporary sampling trolley for mixing materials during brake pad production, the problem of inconvenient material recycling after sampling was solved, achieving convenient material recycling and simplified operation.
Patent Information
- Application Number
- CN202520103916.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-16
- Publication Date
- 2025-11-21
- Estimated Expiration
- 2035-01-16
AI Technical Summary
In the existing technology, it is not convenient to recycle brake pad production materials after sampling, the operation is complicated and there is serious waste of materials.
A temporary sampling trolley for mixing materials in brake pad production was designed, which includes a frame, a receiving bin, and a connecting shaft. The bottom of the receiving bin has a discharge trough. By flipping the receiving bin, the material can automatically fall into the container, simplifying the operation and facilitating recycling.
It enables convenient recycling of materials after sampling, reduces operational complexity and material waste, and improves the ease of use for operators.
Smart Images

Figure CN223574440U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model belongs to the technical field of brake pad raw material sampling, and particularly relates to a brake pad production mixing temporary sampling trolley. BACKGROUND
[0002] The brake pad production material is obtained by mixing a plurality of raw materials, the plurality of raw materials are mixed by using a mixing and stirring device, and then the production material is transported to a subsequent forming procedure after being loaded into a barrel. The brake pad production material needs to be sampled and inspected after being mixed. Since the discharging speed of the mixing and stirring device is relatively high, a small sampler is inconvenient for an operator to sample. Therefore, a sampling trolley is usually moved to the discharging port of the stirring device to sample, and the sampling bin on most of the current sampling trolleys is fixed on the trolley. After sampling is completed, the excess material in the sampling bin needs to be reloaded into the material barrel to avoid waste of the material. Currently, an operator needs to use a tool to load the excess material into the barrel, which is relatively complicated to operate and is inconvenient for cleaning the material in the sampling bin. SUMMARY
[0003] The utility model embodiment provides a kind of brake pad production mixing temporary sampling trolley, to solve the problem that brake pad production material is not convenient to recycle after sampling in prior art.
[0004] To achieve the above object, the utility model adopts the technical scheme of providing a kind of brake pad production mixing temporary sampling trolley, comprising:
[0005] A frame;
[0006] A material receiving bin is installed on the frame, the length direction of the material receiving bin is defined as the first direction, and a material discharging groove is arranged at both ends of the material receiving bin along the length direction.
[0007] Two connecting shafts are fixedly installed on the bottom of the material receiving bin along the first direction in parallel and at intervals, and the length direction of the connecting shafts is arranged along the width direction of the material receiving bin. The top of the frame is provided with a groove for mounting the connecting shafts.
[0008] In a possible implementation manner, the width dimension of the material discharging groove gradually decreases in the direction away from the material receiving bin.
[0009] In a possible implementation manner, the material discharging groove is arranged to be inclined upward in the direction away from the material receiving bin.
[0010] In a possible implementation manner, the top of the material receiving bin and the material discharging groove is both arranged to be bent inwardly with a reinforcing rib plate, and a protective rib plate is arranged to be bent downwardly on the side edge of the reinforcing rib plate to avoid scratching the operator.
[0011] In a possible implementation, the support column for mounting the connecting shaft is fixedly mounted on the frame, the groove is located on the support column, both ends of the connecting shaft are provided with the support column, and the limiting piece is fixedly mounted on the connecting shaft and located between the material receiving bin and the support column.
[0012] In a possible implementation, the support frame for supporting the connecting shaft is hingedly arranged on the frame.
[0013] In a possible implementation, the end of the support frame is provided with an arc-shaped slot for placing the connecting shaft.
[0014] In a possible implementation, two cross beams are fixedly mounted on the frame, the two cross beams are arranged at intervals along the width direction of the material receiving bin, the length direction of the two cross beams is arranged in a first direction, the support frame is provided with a lap rod extending outward, and the lap rod is lapped on the cross beam when the support frame is accommodated on the frame.
[0015] Compared with the prior art, the scheme shown in the embodiment of the application has the following advantages: the frame is provided, the material receiving bin is mounted on the top of the frame, two connecting shafts are fixedly mounted on the bottom of the material receiving bin, the two ends of the connecting shafts extend outward from the material receiving bin and are lapped in the grooves on the top of the frame, and the discharge grooves are arranged at the two ends of the material receiving bin. In use, the material receiving bin can be placed on the frame, and the two connecting shafts at the bottom of the material receiving bin are located in the grooves on the top of the frame, so that the material receiving bin is in a horizontal state. The frame can be pushed to move to the discharging port of the mixing and stirring device for material receiving, and the operator can take samples from the inside of the material receiving bin. After the sampling is completed, the trolley can be moved to the material containing barrel. The material receiving bin is turned over, so that the material in the material receiving bin falls into the material containing barrel from the discharge grooves, and the discharge grooves are arranged at the two ends of the material receiving bin, so that the on-site operator can use more conveniently, and the operation is convenient and the use is convenient, and the sampling material is convenient to recycle. BRIEF DESCRIPTION OF DRAWINGS
[0016] Figure 1 A structure schematic view of the brake pad production mixing temporary sampling trolley is provided in the embodiment of the application;
[0017] Figure 2 A Figure 1 A partial enlarged view of the middle A part;
[0018] Figure 3 An installation structure schematic view of the support frame is provided in the embodiment of the application.
[0019] EXPLANATION OF REFERENCE NUMERALS:
[0020] 1, frame; 11, support column; 12, cross beam; 2, material receiving bin; 3, material discharging groove; 31, reinforcing plate; 32, protective plate; 4, connecting shaft; 41, limiting piece; 5, support frame; 51, overlapping rod. DETAILED DESCRIPTION
[0021] In order to make the technical problems, technical solutions and beneficial effects of the utility model clearer, the utility model will be further described in detail below in combination with the drawings and examples. It should be understood that the specific examples described herein are only used to explain the utility model and not to limit the utility model.
[0022] Please refer to Figures 1 to 3 , now the brake pad production mixing temporary sampling trolley provided by the utility model will be described. The brake pad production mixing temporary sampling trolley comprises a frame 1, a material receiving bin 2 and a connecting shaft 4. The material receiving bin 2 is installed on the frame 1, the length direction of the material receiving bin 2 is defined as the first direction, and the material receiving bin 2 is provided with a material discharging groove 3 at both ends along the length direction; the number of the connecting shafts 4 is two, the two connecting shafts 4 are fixedly installed at the bottom of the material receiving bin 2 in parallel along the first direction, and the length direction of the connecting shaft 4 is arranged along the width direction of the material receiving bin 2, and the top of the frame 1 is provided with a groove for installing the connecting shaft 4.
[0023] The brake pad production mixing temporary sampling trolley provided by the embodiment compared with the prior art, by setting the frame 1, the material receiving bin 2 is installed on the top of the frame 1, and the two connecting shafts 4 are fixedly installed at the bottom of the material receiving bin 2, the two ends of the connecting shaft 4 extend out of the outside of the material receiving bin 2 and are overlapped in the groove on the top of the frame 1. And the material receiving bin 2 is provided with a material discharging groove 3 at both ends. In use, the material receiving bin 2 can be placed on the frame 1, and the two connecting shafts 4 at the bottom of the material receiving bin 2 are located in the groove on the top of the frame 1, at this time the material receiving bin 2 is in a horizontal state. The frame 1 can be pushed to move to the material discharging port of the mixing and stirring device for material receiving, and the operator can take samples from the inside of the material receiving bin 2. When the sampling is completed, the trolley can be moved to the material containing barrel. The material receiving bin 2 is turned over to make the material in the material receiving bin 2 fall into the material containing barrel from the material discharging groove 3, and the material receiving bin 2 is provided with a material discharging groove 3 at both ends, so that it is more convenient for the on-site operator to use, and the operation is convenient, the use is convenient, and the sampling material is convenient to recycle.
[0024] Specifically, in the embodiment, the two ends of the connecting shaft 4 are arranged to extend out of the outside of the material receiving bin 2, and the part of the connecting shaft 4 extending out of the outside of the material receiving bin 2 is freely overlapped in the inner wall of the groove on the top of the frame 1. The operator can lift a single connecting shaft 4 and turn over the material receiving bin 2 with the axis of the other connecting shaft 4 as the center according to the on-site use condition.
[0025] In some embodiments, the above-mentioned discharge chute 3 can adopt the structure as shown in Figure 1 、 Figure 3 . Referring to Figure 1 、 Figure 3 , the width dimension of the discharge chute 3 gradually decreases in the direction away from the receiving bin 2. The end of the discharge chute 3 away from the receiving bin 2 has a small width dimension, which can guide the material to be discharged through the discharge chute 3 and transported to the inner wall of the receiving bin. This prevents the material from flowing to the outside of the receiving bin when being discharged from the discharge chute 3. The stability during the discharging process is improved.
[0026] In some embodiments, the above-mentioned discharge chute 3 can adopt the structure as shown in Figure 1 、 Figure 3 . Referring to Figure 1 、 Figure 3 , the discharge chute 3 is arranged upwardly inclined in the direction away from the receiving bin 2. The discharge chute 3 at both ends of the receiving bin 2 is arranged upwardly inclined, which can play a role in blocking the material during the material taking process of the receiving bin 2, avoiding the material overflowing from the inside of the discharge chute 3 during the material taking process or the movement of the frame 1. Thus, the waste of material is avoided.
[0027] In some embodiments, the above-mentioned receiving bin 2 and discharge chute 3 can adopt the structure as shown in Figure 2 . Referring to Figure 2 , the top of the receiving bin 2 and the discharge chute 3 is both arranged with a reinforcing rib plate 31 inwardly bent, and a protective rib plate 32 is arranged downwardly bent on the side of the reinforcing rib plate 31 to avoid scratching the operator. A wing plate is arranged upwardly bent on both sides of the receiving bin 2 and the discharge chute 3 along the width direction of the receiving bin 2, and a reinforcing rib plate 31 is arranged inwardly bent on the top side of the wing plate. The reinforcing rib plate 31 can enhance the strength of the receiving bin 2 and the discharge chute 3, thereby reducing the deformation of the receiving bin 2 during the turning process. A protective rib plate 32 is arranged downwardly bent on the side of the reinforcing rib plate 31 away from the wing plate. This can play a protective role and avoid scratching the operator by the side of the reinforcing rib plate 31.
[0028] Preferably, in the present embodiment, the reinforcing rib plate 31 and the protective rib plate 32 can play a certain role in preventing the material from overflowing from the side of the wing plate. During the turning of the receiving bin 2 for unloading, a certain material blocking effect can be achieved.
[0029] In some embodiments, the above-mentioned frame 1 can adopt the structure as shown in Figure 1 、 Figure 3 . Referring to Figure 1 、 Figure 3The support column 11 is fixedly installed on the frame 1 and is used for mounting the connecting shaft 4. The recess is located on the support column 11. The two ends of the connecting shaft 4 are provided with the support column 11. The limiting piece 41 is fixedly installed on the connecting shaft 4. The limiting piece 41 is located between the material receiving bin 2 and the support column 11. Four support columns 11 are fixedly installed on the top of the frame 1. The two ends of each connecting shaft 4 are respectively overlapped on two support columns 11. The limiting piece 41 is sleeved on the outer side of the connecting shaft 4 and is fixedly installed on the connecting shaft 4 by welding. The limiting piece 41 is located between the material receiving bin 2 and the support column 11, thereby limiting the position of the material receiving bin 2 on the frame 1 along the width direction of the material receiving bin 2. During the overturning process of the material receiving bin 2, the stability of the position of the material receiving bin 2 is ensured.
[0030] In some embodiments, the above-mentioned frame 1 can adopt the structure as shown in Figure 1 、 Figure 3 . Referring to Figure 1 、 Figure 3 , the support frame 5 for supporting the connecting shaft 4 is further hingedly arranged on the frame 1. The support frame 5 is located at the bottom of the material receiving bin 2. One end of the support frame 5 is hingedly arranged on the frame 1. The axis of the hinge of the support frame 5 on the frame 1 is arranged in parallel with the connecting shaft 4. In use, one end of the connecting bin can be overturned upward. The support frame 5 is rotated so that the end of the support frame 5 abuts against the connecting shaft 4, thereby fixing the material receiving bin 2 in the overturned state. This facilitates the operator to clean the materials remaining in the material receiving bin 2.
[0031] Preferably, in the present embodiment, two support frames 5 are installed on the frame 1. The two support frames 5 are respectively used for supporting the two connecting shafts 4.
[0032] In some embodiments, the above-mentioned support frame 5 can adopt the structure as shown in Figure 3 . Referring to Figure 3 , the end of the support frame 5 is provided with an arc-shaped groove for placing the connecting shaft 4. The arc-shaped groove is arranged on the support frame 5 away from the end of the hinge of the support frame 5 on the frame. The size of the arc-shaped groove is matched with the outer size of the connecting shaft 4. The arrangement of the arc-shaped groove can improve the stability of the support frame 5 supporting the connecting shaft 4. This avoids the danger of the material receiving bin 2 being overturned downward due to the support frame 5 slipping off the connecting shaft 4 during the supporting process.
[0033] In some embodiments, the above-mentioned frame 1 can adopt the structure as shown in Figure 3 . Referring to Figure 3The two cross beams 12 are fixedly installed on the frame 1, are arranged at intervals along the width direction of the material receiving bin 2, and the length direction of the two cross beams 12 is arranged along the first direction. The support frame 5 is provided with a lap joint rod 51 extending outward, and when the support frame 5 is received on the frame 1, the lap joint rod 51 is lapped on the cross beam 12. Two cross beams 12 are fixedly installed above the frame 1, and the height of the cross beam 12 is lower than the hinge shaft of the support frame 5 on the frame 1. When the support frame 5 is received on the frame 1, the lap joint rod 51 on the outer side of the cross beam 12 is lapped on the cross beam 12, so that the support frame 5 can be limited to continue to turn down to receive the support frame 5 on the frame 1. It is convenient to take and hold the support frame 5 during later use.
[0034] The above only describes the preferred embodiments of the present application and is not intended to limit the present application. Any modification, equivalent replacement and improvement within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A temporary sampling trolley for brake pad production mix, characterized in that, Include: Frame (1); Material receiving bin (2) is installed on the frame (1), and the length direction of the material receiving bin (2) is defined as the first direction, and the material receiving bin (2) is provided with a discharge chute (3) at both ends along the length direction thereof; The connecting shaft (4) is two, two connecting shafts (4) are fixedly installed in parallel along the first direction at the bottom of the material receiving bin (2), and the length direction of the connecting shaft (4) is arranged along the width direction of the material receiving bin (2), and the top of the frame (1) is provided with a groove for mounting the connecting shaft (4).
2. The brake pad production compound temporary sampling trolley of claim 1, wherein, The width dimension of the discharge chute (3) gradually decreases in the direction away from the material receiving bin (2).
3. The brake pad production compound temporary sampling trolley of claim 1 or 2, wherein, The discharge chute (3) is arranged upwardly inclined in the direction away from the material receiving bin (2).
4. The brake pad production compound temporary sampling trolley of claim 1, wherein, The top of the material receiving bin (2) and the discharge chute (3) is provided with a reinforcing rib plate (31) which is bent inwardly, and the side edge of the reinforcing rib plate (31) is provided with a protective rib plate (32) which is bent downwardly to avoid scratching the operator.
5. The brake pad production compound temporary sampling trolley of claim 1, wherein, The frame (1) is fixedly provided with a support column (11) for mounting the connecting shaft (4), and the groove is located on the support column (11), and the both ends of the connecting shaft (4) are provided with the support column (11), and the connecting shaft (4) is fixedly provided with a limiting piece (41), and the limiting piece (41) is located between the material receiving bin (2) and the support column (11).
6. The brake pad production compound temporary sampling trolley of claim 1, wherein, The frame (1) is also hingedly provided with a support frame (5) for supporting the connecting shaft (4).
7. The brake pad production compound temporary sampling trolley of claim 6, wherein, The end of the support frame (5) is provided with an arc-shaped groove for placing the connecting shaft (4).
8. The brake pad production compound temporary sampling trolley of claim 6, wherein, The frame (1) is fixedly provided with two cross beams (12), and the two cross beams (12) are arranged in parallel along the width direction of the material receiving bin (2), and the length direction of the two cross beams (12) is arranged along the first direction, and the support frame (5) is provided with a lap rod (51) which is arranged outwardly, and when the support frame (5) is received on the frame (1), the lap rod (51) is lapped on the cross beam (12).