Water conservancy construction pipeline embedding device

By designing a pipeline burial device for water conservancy construction, the problems of insufficient protection and inaccurate burial depth caused by direct pipeline burial were solved. This achieved neat arrangement of cables and stable support of the device, reducing safety hazards and construction costs.

CN223583700UActive Publication Date: 2025-11-21HEILONGJIANG LONGHANG ENG GENERAL CONTRACT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423166740.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-23
Publication Date
2025-11-21
Estimated Expiration
2034-12-23

AI Technical Summary

Technical Problem

The existing water conservancy construction pipelines are directly buried without effective protection, making them easy to be scratched by sharp stones in the soil. The burial depth and level are difficult to control precisely, resulting in safety hazards, shortened service life, and increased construction costs.

Method used

A hydraulic construction pipeline burial device was designed, comprising a burial support component, a pipeline fixing component, and a movement control component. Through a rotating structure, an elastic structure, and a locking structure, the device achieves neat arrangement of cables and stable support, and is moved smoothly using a crane.

Benefits of technology

It achieves neat cable arrangement and stable support for the device, avoids cable tangling, reduces the risk of damage, simplifies construction and maintenance, and reduces construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223583700U_ABST
    Figure CN223583700U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of water conservancy construction equipment, and particularly relates to a water conservancy construction pipeline embedding device which comprises an embedding supporting assembly, a pipeline fixing assembly is installed in the embedding supporting assembly, and the side of the embedding supporting assembly is connected with a movement control assembly. The pipeline fixing assembly comprises a rotating shaft, the outer wall of the rotating shaft is rotationally connected with a fixing block, the side of the fixing block is fixedly connected with a U-shaped plate, a first spring is installed in the U-shaped plate, and the outer wall of the U-shaped plate is fixedly connected with a convex block; according to the utility model, cables can be orderly fixed in the wire slots at the bottoms of the fixing blocks, winding is prevented, the fixing blocks are fixed through the first springs and the convex blocks, maintenance and replacement of the cables are facilitated, meanwhile, the embedded mounting rack and the supporting top can be connected through the mounting holes, and the obliquely arranged supporting plate and the embedded mounting rack form a triangle, so that the device is supported more firmly.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to water conservancy construction equipment technical field, concretely is a water conservancy construction pipeline burying device. BACKGROUND

[0002] Water conservancy construction is an important link in the process of water conservancy engineering construction, it involves a series of technology and engineering activities, aims at realizing the control and allocation of surface water and groundwater to achieve the purpose of eliminating harm and benefiting.

[0003] The existing water conservancy construction pipeline burying exists usually all directly burying pipeline in the soil, this will lead to the lack of effective protection of pipeline, the sharp stone, sundry etc. in the soil can cause scratch to the surface of pipeline, with the lapse of time, these tiny injuries can gradually expand, reduce the overall strength of pipeline, and further cause pipeline leakage and other security risks, secondly, direct burying is difficult to guarantee that the burying depth and levelness of pipeline reach the accurate design requirement, can appear the condition of too shallow or too deep burying depth, too shallow burying depth can make pipeline vulnerable to external damage, such as being injured by excavation equipment in subsequent construction or daily use, too deep burying depth can increase construction cost and the difficulty of subsequent maintenance, when pipeline is directly buried in the soil, in the complex soil environment, such as existing acid and alkali components or long-term erosion of underground water, pipeline lacks corresponding isolation protection measures, can accelerate the corrosion of pipeline, shorten its service life, and have adverse effects on the long-term stable operation of the whole water conservancy project.

[0004] Therefore, the water conservancy construction pipeline burying device is proposed for the above problems. UTILITY MODEL CONTENTS

[0005] In order to make up for the deficiencies of the prior art, the problem that pipeline is usually directly buried in the soil, which leads to the lack of effective protection of pipeline, the sharp stone, sundry etc. in the soil can cause scratch to the surface of pipeline, with the lapse of time, these tiny injuries can gradually expand, reduce the overall strength of pipeline, and further cause pipeline leakage and other security risks, secondly, direct burying is difficult to guarantee that the burying depth and levelness of pipeline reach the accurate design requirement, can appear the condition of too shallow or too deep burying depth, too shallow burying depth can make pipeline vulnerable to external damage, such as being injured by excavation equipment in subsequent construction or daily use, too deep burying depth can increase construction cost and the difficulty of subsequent maintenance, when pipeline is directly buried in the soil, in the complex soil environment, such as existing acid and alkali components or long-term erosion of underground water, pipeline lacks corresponding isolation protection measures, can accelerate the corrosion of pipeline, shorten its service life, and have adverse effects on the long-term stable operation of the whole water conservancy project is solved.

[0006] The utility model discloses a technical scheme that solves its technical problem is adopted: The utility model discloses a water conservancy construction pipeline burying device, including burying support subassembly, the inside installation of burying support subassembly has pipeline fixed component, and the side of burying support subassembly is connected with mobile control assembly, the pipeline fixed component includes pivot, the outer wall rotation of pivot is connected with fixed block, and the side fixed connection of fixed block has U type board, the inside installation of U type board has first spring, and the outer wall fixed connection of U type board has protruding piece.

[0007] Preferably, the fixed block is rotatably connected with the burying support subassembly through the pivot, and the fixed block is detachably connected with the burying support subassembly through the U-shaped plate and the protruding piece, and the protruding piece is elastically connected with the fixed block through the U-shaped plate and the first spring.

[0008] Preferably, the burying support subassembly includes a burying mounting frame, the bottom of the burying mounting frame is fixedly connected with a support plate, the top of the burying mounting frame is fixedly connected with a mounting plate, the inside of the mounting plate is provided with mounting holes, and the top of the mounting plate is clampedly connected with a support top.

[0009] Preferably, the mounting holes are equidistantly arranged inside the mounting plate and the support top, the support top and the mounting plate form a clamping structure, and the burying mounting frame and the support plate form a right triangle structure.

[0010] Preferably, the mobile control assembly includes a clamping block, the inside of the clamping block is clampedly connected with a connecting block, the side of the connecting block is fixedly connected with a fixed clamping hook, the top of the fixed clamping hook is provided with a rotating seat, the outer wall of the rotating seat is rotatably connected with a movable clamping hook, and the side of the movable clamping hook is provided with a second spring.

[0011] Preferably, the movable clamping hook is elastically connected with the fixed clamping hook through the second spring, the movable clamping hook is rotatably connected with the fixed clamping hook through the rotating seat, and the fixed clamping hook is clampedly connected with the clamping block through the connecting block.

[0012] The utility model discloses a beneficial aspect lies in:

[0013] 1. The utility model discloses a pipeline fixed component, which can orderly fix the cable at the bottom of the fixed block, so that the cable can be neatly embedded in the wire slot, the mutual entanglement between the cables can be avoided, the neat arrangement of the cables in the water conservancy construction pipeline burying device is ensured, the subsequent construction operation and maintenance are facilitated, the fixed block can be fixed through the first spring and the protruding piece, thereby facilitating the maintenance or replacement of the cable.

[0014] 2. The utility model discloses set up and bury support subassembly, bury and install the frame with the support top will be connected through the installation hole, and the support plate is inclined to set up at the bottom of bury and install the frame to make bury and install the frame with the support plate between triangle set, with this can be more firm support of device.

[0015] 3. The utility model discloses set up and move control subassembly, when needing to move device position, fixed clasp can be connected with bury and install the frame through the clamping block, then can through the crane, and the position of device is removed, and the operator can slowly, stably with device is transported to the designated position through the control system of crane, avoided the damage of device or the damage to construction environment that possibly caused because manual handling or other simple removal mode. DRAWINGS

[0016] In order to more clearly illustrate the utility model embodiment or prior art technical scheme, below will to the drawing needed to use in the embodiment or prior art description simple introduction, obviously, below description's drawing only some embodiments of the utility model, for the ordinary skill in the art person, under the premise of not paying the creative labor, can also obtain other drawings according to these drawings.

[0017] Figure 1 It is the three-dimensional structure schematic diagram of the utility model whole side view;

[0018] Figure 2 It is the three-dimensional structure schematic diagram of pipeline fixed component of the utility model;

[0019] Figure 3 It is the three-dimensional structure schematic diagram of bury and support subassembly of the utility model;

[0020] Figure 4 It is the three-dimensional structure schematic diagram of move control subassembly of the utility model.

[0021] In the drawing: 1, bury and support subassembly;101, bury and install the frame;102, support plate;103, installation plate;104, installation hole;105, support top;2, pipeline fixed component;201, pivot;202, fixed block;203, U-shaped plate;204, first spring;205, protruding block;3, move control subassembly;301, clamping block;302, connecting block;303, fixed clasp;304, rotating seat;305, movable clasp;306, second spring. SPECIFIC EMBODIMENTS

[0022] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of the utility model.

[0023] Embodiment one

[0024] As Figure 1 With Figure 2 As shown in a water conservancy construction pipeline burying device, including burying support assembly 1, the inside installation of burying support assembly 1 has pipeline fixed assembly 2, and the side of burying support assembly 1 is connected with mobile control assembly 3;Pipeline fixed assembly 2, including shaft 201, fixed block 202, U-shaped plate 203, first spring 204, lug 205, pipeline fixed assembly 2 can be orderly fixed in the fixed block 202 bottom line groove, prevent winding, fixed block 202 is fixed by first spring 204, lug 205, it is convenient for cable maintenance replacement, fixed block 202 is formed into rotating structure with burying support assembly 1 by shaft 201, and fixed block 202 is formed into detachable structure with burying support assembly 1 by U-shaped plate 203, lug 205, and lug 205 is formed into elastic structure with fixed block 202 by U-shaped plate 203, first spring 204;By orderly fixing cable in the bottom of fixed block 202, the cable can be neatly embedded in the line groove, the mutual winding between cable can be avoided, the neat arrangement of cable in water conservancy construction pipeline burying device is guaranteed, it is favorable for subsequent construction operation and maintenance, fixed block 202 can be fixed by first spring 204, lug 205, so that it is convenient to maintain or replace cable.

[0025] As Figure 1 With Figure 3 As shown in a water conservancy construction pipeline burying device, burying support assembly 1, including burying installation frame 101, support plate 102, mounting plate 103, mounting hole 104, support top 105, burying support assembly 1 can be connected burying installation frame 101 and support top 105 by mounting hole 104, and the support plate 102 of inclined arrangement is formed into triangle with burying installation frame 101, so that the device is more firmly supported, the inside of mounting hole 104 is arranged at equal intervals about mounting plate 103, support top 105, and support top 105 and mounting plate 103 form clamping structure, burying installation frame 101 and support plate 102 form right triangle structure;Burying installation frame 101 and support top 105 will be connected through mounting hole 104, and support plate 102 is arranged at the bottom of burying installation frame 101 at the same time, so that burying installation frame 101 and support plate 102 are arranged in triangle, so that the device can be more firmly supported.

[0026] As Figure 1 With Figure 4 As shown in the water conservancy construction pipeline burying device, the moving control assembly 3 includes the clamping block 301, the connecting block 302, the fixed clasp 303, the rotating seat 304, the movable clasp 305, and the second spring 306. The device is slowly and smoothly moved to the designated position by the crane, which can avoid damage to the device. The movable clasp 305 and the fixed clasp 303 constitute an elastic structure through the second spring 306. The movable clasp 305 and the fixed clasp 303 constitute a rotating structure through the rotating seat 304. The fixed clasp 303 and the clamping block 301 constitute a clamping structure through the connecting block 302. When the device needs to be moved, the fixed clasp 303 can be connected with the burying installation frame 101 through the clamping block 301. Then the position of the device can be moved by the crane. The operator can slowly and smoothly transport the device to the designated position through the control system of the crane, which avoids damage to the device or damage to the construction environment caused by manual transportation or other simple moving methods.

[0027] Working principle: First, the fixed clasp 303 is connected with the clamping block 301 through the connecting block 302. At this time, the fixed clasp 303 will be connected with the burying installation frame 101. At this time, the movable clasp 305 can be squeezed. The movable clasp 305 will rotate through the rotating seat 304 and will squeeze the second spring 306. Then the fixed clasp 303 is hooked to the fixed ring of the crane. At this time, the movable clasp 305 is released. The movable clasp 305 will return to the original position under the elastic force of the second spring 306. At this time, the operator slowly and smoothly transports the burying installation frame 101 to the designated position through the control system of the crane. When the position of the burying installation frame 101 is determined, the fixed clasp 303 can be removed from the burying installation frame 101. At the same time, the burying installation frame 101 and the support plate 102 constitute a triangle due to the inclined arrangement of the support plate 102 at the bottom of the burying installation frame 101. The triangle has stability, which can make the device more stable.

[0028] Then, the cable is placed in the groove on the top of the buried installation frame 101, then the fixing block 202 is rotated through the rotating shaft 201, then the U-shaped plate 203 on the side of the fixing block 202 is inserted into the corresponding hole on the top of the buried installation frame 101, at this time the protrusion 205 will extrude the first spring 204, then after hearing the rebounding sound of the protrusion 205, it indicates that the fixing block 202 is fixed on the top of the buried installation frame 101, so that the mutual entanglement between the cables can be avoided, the neat arrangement of the cables in the water conservancy construction pipeline burying device is ensured, the subsequent construction operation and maintenance are facilitated, the support top 105 is inserted into the installation plate 103, then the support top 105 and the buried installation frame 101 are connected and fixed through the bolt and the installation hole 104, so that they are connected and fixed, then the device can be buried by soil.

[0029] The basic principle, main features and advantages of the utility model are shown and described above. It should be understood by those skilled in the art that the utility model is not limited by the above-mentioned embodiments, and the above-mentioned embodiments and descriptions in the specification are only for illustrating the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model can also have various changes and improvements, and these changes and improvements all fall within the scope of the utility model claimed.

Claims

1. A device for laying pipelines in water conservancy construction, characterized in that: It includes a buried support assembly (1), the buried support assembly (1) is equipped with a pipeline fixing assembly (2) inside, and a movement control assembly (3) is connected to the side of the buried support assembly (1); The pipeline fixing assembly (2) includes a rotating shaft (201), a fixing block (202) is rotatably connected to the outer wall of the rotating shaft (201), and a U-shaped plate (203) is fixedly connected to the side of the fixing block (202). A first spring (204) is installed inside the U-shaped plate (203), and a protrusion (205) is fixedly connected to the outer wall of the U-shaped plate (203).

2. The water conservancy construction pipeline laying device according to claim 1, characterized in that: The fixing block (202) forms a rotating structure with the embedded support assembly (1) through the rotating shaft (201), and the fixing block (202) forms a detachable structure with the embedded support assembly (1) through the U-shaped plate (203) and the protrusion (205), and the protrusion (205) forms an elastic structure with the fixing block (202) through the U-shaped plate (203) and the first spring (204).

3. The water conservancy construction pipeline laying device according to claim 1, characterized in that: The embedded support assembly (1) includes an embedded mounting frame (101), a support plate (102) is fixedly connected to the bottom of the embedded mounting frame (101), and an mounting plate (103) is fixedly connected to the top of the embedded mounting frame (101). The mounting plate (103) has an installation hole (104) inside, and a support top (105) is engaged with the top of the mounting plate (103).

4. The water conservancy construction pipeline laying device according to claim 3, characterized in that: The mounting holes (104) are equally spaced about the interior of the mounting plate (103) and the support top (105), and the support top (105) and the mounting plate (103) form a snap-fit ​​structure. The embedded mounting bracket (101) and the support plate (102) form a right-angled triangle structure.

5. A water conservancy construction pipeline laying device according to claim 1, characterized in that: The motion control component (3) includes a locking block (301), a connecting block (302) is internally engaged with the locking block (301), and a fixing hook (303) is fixedly connected to the side of the connecting block (302). A rotating seat (304) is installed on the top of the fixing hook (303), and a movable hook (305) is rotatably connected to the outer wall of the rotating seat (304). A second spring (306) is installed on the side of the movable hook (305).

6. The water conservancy construction pipeline laying device according to claim 5, characterized in that: The movable hook (305) forms an elastic structure with the fixed hook (303) through the second spring (306), and the movable hook (305) forms a rotating structure with the fixed hook (303) through the rotating seat (304), and the fixed hook (303) forms a locking structure with the locking block (301) through the connecting block (302).