Maintenance cover for padstone
By designing a frame component and a plastic film maintenance cover, automated periodic watering is achieved, solving the problem of low efficiency in traditional manual watering, improving the maintenance efficiency and structural stability of bridge bearing pad stones, and reducing costs.
Patent Information
- Application Number
- CN202423179652.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-23
- Publication Date
- 2025-11-25
- Estimated Expiration
- 2034-12-23
AI Technical Summary
Traditional bridge bearing pad stones have low maintenance efficiency, and manual watering is ineffective, increasing labor and time costs.
Design a curing cover comprising a frame assembly and a plastic membrane, with an internal water supply component to achieve automated periodic watering, reduce water evaporation, maintain a moist state, and improve water utilization and structural stability through a collection tank and guide pipe.
It improves maintenance efficiency, reduces labor and time costs, ensures the moisture state of the foundation stone, which is conducive to hydration reaction and hardening process, and also enhances structural stability.
Smart Images

Figure CN223593232U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of curing cover, concretely relates to a curing cover for cushion stone. BACKGROUND
[0002] In the construction process of bridge engineering, the cushion stone of support is the key structure of placing support, supporting and transmitting load to the lower structure. However, in the construction process, the maintenance of the cushion stone of support is an important link that cannot be ignored, and the quality of the maintenance directly affects the final quality of the cushion stone of support and the overall performance of the bridge.
[0003] The traditional maintenance of the cushion stone of bridge support usually adopts artificial watering, and the artificial watering has the defects of low efficiency and poor maintenance effect. In the past, the cushion stone of bridge support was maintained by covering plastic film to keep water after removing the formwork, or was maintained by covering geotextile and watering, and people need to repeatedly water to maintain humidity during the maintenance process, which increases the labor of people. UTILITY MODEL CONTENT
[0004] The utility model provides a curing cover for cushion stone, which can overcome some or some defects of the prior art.
[0005] According to the curing cover for cushion stone, the curing cover main body is arranged on the cushion block, the curing cover main body comprises a frame assembly and a plastic film wrapped outside the frame assembly, the plastic film and the frame assembly jointly form a curing cavity with an opening downward, the curing cavity is used for placing the cushion block, a water delivery assembly is arranged at the top wall of the inner cavity in a ring shape, and the water delivery assembly is used for regularly watering the cushion block.
[0006] Through the cooperation of the plastic film, the frame assembly and the water delivery assembly, compared with the traditional artificial watering and film covering and moisturizing method, the curing cover can realize automatic regular watering, can slow down and reduce the evaporation of water, can keep the cushion stone in a moist state, is favorable for the hydration reaction of cement and the hardening process of the cushion stone, and the curing cover can be repeatedly used, the curing efficiency is improved, and the labor cost and time cost are reduced.
[0007] Preferably, the frame assembly comprises a bottom frame arranged in a rectangular shape, vertical angle steels are arranged at the four corners of the bottom frame, angle steel frames for mounting the water delivery assembly are arranged between the top walls of the angle steels at the four corners; a collection groove recessed inward is formed at the top wall of the bottom frame, and the collection groove is used for collecting water attached to the inner wall of the plastic film.
[0008] Through the arrangement of the bottom frame, some water droplets or evaporated water vapor may be attached to the inner wall of the plastic film during watering and maintenance, the water droplets or evaporated water vapor can flow into the collection groove along the plastic film, the water in the collection groove can be collected, and the utilization rate of water is improved.
[0009] It can be understood that the water in the collecting groove can effectively maintain the humidity stability in the maintenance cavity and improve the stability of the maintenance cover main body.
[0010] Preferably, an outer baffle is formed at the top wall of the collecting groove in contact with the inner wall of the plastic film, and an inner baffle is formed at the top wall of the collecting groove away from the plastic film, and the height of the collecting groove is higher than the height of the inner baffle.
[0011] Through the cooperation of the outer baffle and the inner baffle, the capacity of the collecting groove is effectively increased.
[0012] Through the setting of the outer baffle, the water droplets adhering to the inner wall of the plastic film at the top wall of the collecting groove in contact with the inner wall of the plastic film are guided to flow into the collecting groove along the outer baffle, ensuring that the accumulated water can be effectively collected.
[0013] It can be understood that the outer baffle can also prevent the accumulated water from overflowing from the edge of the collecting groove under the action of wind.
[0014] Preferably, a water receiving pipe is formed at the side wall of the base frame and penetrates the water delivery assembly, and a connecting pipe is formed at the side wall of the base frame and penetrates the collecting groove.
[0015] Through the setting of the water receiving pipe, the water delivery assembly can be conveniently connected to an external water source such as tap water, a water tank or a water pump, etc., ensuring that the water delivery assembly can continuously and stably provide the required moisture for the cushion block to meet the watering needs in the maintenance process.
[0016] Preferably, a guide pipe is vertically arranged between the angle steel frame and the base frame, and a support pipe corresponding to the guide pipe is arranged between the inner walls of the angle steel frame, and the support pipe is inclined downward from the middle to both ends.
[0017] Through the cooperation of the guide pipe and the support pipe, a stable support structure is formed, improving the structural stability of the entire maintenance cover.
[0018] It can be understood that the support pipe is inclined downward from the middle to both ends, so that the middle part of the plastic film is raised, so that the water vapor at the inner wall of the plastic film can slide downward, facilitating the collection of water droplets.
[0019] Preferably, a through cavity is formed in the guide pipe and penetrates the collecting groove, and a water droplet groove is formed at the bottom wall of the support pipe and recessed inward, and the water droplet groove is in communication with the through cavity.
[0020] Through the above structure, when the water droplets generated by the water delivery assembly during the watering process fall on the support pipe, the water droplets will flow into the through cavity along the water droplet groove and finally be discharged into the collecting groove, improving the water recovery effect.
[0021] Preferably, a handle is arranged at the top of the plastic film and mounted on the angle steel frame.
[0022] Through the above structure, the construction personnel can easily hold and move the maintenance cover, so that the maintenance cover is conveniently opened or closed. BRIEF DESCRIPTION OF DRAWINGS
[0023] Figure 1 It is a whole structure schematic view of a kind of cushion stone maintenance cover.
[0024] Figure 2 It is a frame assembly structure schematic view of a kind of cushion stone maintenance cover.
[0025] Figure 3 It is a support pipe and guide pipe section structure schematic view of a kind of cushion stone maintenance cover.
[0026] Figure 4 It is a collection groove section structure schematic view of a kind of cushion stone maintenance cover. DETAILED DESCRIPTION
[0027] For further understanding of the contents of the present application, the present application is described in detail in conjunction with examples. It should be understood that examples are merely to explain the present application and not to limit.
[0028] Example 1
[0029] Please refer to Figures 1-4 The present embodiment provides a cushion stone maintenance cover, which comprises a maintenance cover body 100 arranged on the cushion block, the maintenance cover body 100 comprises a frame assembly and a plastic film 110 wrapped outside the frame assembly, the plastic film 110 and the frame assembly together form a maintenance cavity with an opening downward, the maintenance cavity is used for placing the cushion block, and a water delivery assembly 270 is arranged in the annular top wall of the inner cavity, which is used for regularly watering the cushion block.
[0030] The cushion stone maintenance cover of the present disclosure is cooperatively arranged by the plastic film 110, the frame assembly and the water delivery assembly 270, compared with the traditional artificial watering and film covering and moisturizing method, the present maintenance cover can realize automatic regular watering, can slow down and reduce the evaporation of water, maintain the wet state of the cushion stone, is beneficial to the hydration reaction of cement and the hardening process of the cushion stone, and the present maintenance cover can be repeatedly used, improves the maintenance efficiency, reduces the labor cost and time cost.
[0031] In the present embodiment, the frame assembly comprises a bottom frame 210 arranged in a rectangular shape, the bottom frame 210 is provided with an angle steel 220 arranged vertically at each corner, and an angle steel frame 240 for installing the water delivery assembly 270 is arranged between the top walls of the angle steels 220 at the four corners; the top wall of the bottom frame 210 is formed with a collection groove 410 recessed inward, which is used for collecting water adhered to the inner wall of the plastic film 110.
[0032] Through the setting of the bottom frame 210, in the watering and maintenance process, some water droplets or evaporated water vapor may be attached to the inner wall of the plastic film 110, which can flow into the collecting groove 410 along the plastic film, facilitating the collection of water in the collecting groove 410 and improving the utilization rate of water.
[0033] It can be understood that the water in the collecting groove 410 can effectively maintain the stability of the humidity in the maintenance cavity and improve the stability of the maintenance cover main body 100.
[0034] In this embodiment, the collecting groove 410 is formed with an outer baffle 430 at the top wall of the side in contact with the inner wall of the plastic film 110, and the collecting groove 410 is formed with an inner baffle 420 at the top wall of the side away from the plastic film 110. The height of the collecting groove 410 is higher than the height of the inner baffle 420.
[0035] Through the cooperation of the outer baffle 430 and the inner baffle 420, the capacity of the collecting groove 410 is effectively increased.
[0036] Through the setting of the outer baffle 430, at the top wall of the side in contact with the inner wall of the plastic film 110, the water droplets attached to the inner wall of the plastic film 110 are guided to flow into the collecting groove 410 along the outer baffle 430, ensuring that the accumulated water can be effectively collected.
[0037] It can be understood that the outer baffle 430 can also prevent the accumulated water from overflowing from the edge of the collecting groove 410 under the action of wind.
[0038] In this embodiment, the side wall of the bottom frame 210 is formed with a water receiving pipe 280 penetrating the water delivery assembly 270, and the side wall of the bottom frame 210 is formed with a connecting pipe 260 penetrating the collecting groove 410.
[0039] The connecting pipe 260 is connected with a water tank for collecting water, and the water tank is provided with a water pump for pumping water in the collecting groove 410 into the water tank. The water delivery assembly 270 is provided with a recycling pipe penetratingly connected with the water tank, so that the water delivery assembly 270 can perform secondary spraying of the water in the water tank.
[0040] Through the setting of the water receiving pipe 280, the water delivery assembly 270 can be conveniently connected to an external water source such as tap water, a water tank or a water pump, etc., ensuring that the water delivery assembly 270 can continuously and stably provide the required moisture for the cushion block to meet the watering demand in the maintenance process.
[0041] In this embodiment, a guide pipe 230 is vertically arranged between the angle steel frame 240 and the bottom frame 210, and a support pipe 250 corresponding to the guide pipe 230 is arranged between the inner walls of the angle steel frame 240. The support pipe 250 is inclined downward from the middle to both ends.
[0042] Through the cooperation of the guide pipe 230 and the support pipe 250, a stable support structure is formed, and the structural stability of the entire maintenance cover is improved.
[0043] It can be understood that the support pipe 250 is inclined downward from the middle to both ends, so that the middle of the plastic film 110 is raised, so that the water vapor at the inner wall of the plastic film 110 can slide downward, facilitating the collection of water droplets.
[0044] In the embodiment, the guide pipe 230 is internally formed with a through cavity 320 communicating with the collection groove 410, and the support pipe 250 is formed with a water droplet groove 310 recessed inward at the bottom wall, and the water droplet groove 310 is in communication with the through cavity 320.
[0045] Through the above structure, when the water droplets generated by the water delivery assembly 270 during the watering process fall on the support pipe 250, the water droplets will flow into the through cavity 320 along the water droplet groove 310, and finally be discharged into the collection groove 410, improving the water recovery effect.
[0046] In the embodiment, the plastic film 110 is provided with a handle 120 mounted at the angle steel frame 240 at the top.
[0047] Through the above structure, the construction personnel can easily grasp and move the maintenance cover, so as to conveniently open or close the maintenance cover.
[0048] It is easy to understand that those skilled in the art can combine, split, recombine, etc. on the basis of one or more embodiments provided in the present application to obtain other embodiments, and these embodiments do not exceed the protection scope of the present application.
[0049] The above describes the present application and its embodiments in a schematic manner, and the description is not restrictive, and the embodiments shown are only part of the embodiments of the present application, and the actual structure is not limited thereto. Therefore, if those skilled in the art are inspired by the above, without departing from the creative purpose of the present application, without creative design, similar structure and embodiments of the technical solutions can be obtained, which should belong to the protection scope of the present application.
Claims
1. A maintenance cover for stone pads, characterized in that, The system includes a curing cover body (100) covering the pad, the curing cover body (100) including a frame assembly and a plastic film (110) covering the frame assembly. The plastic film (110) and the frame assembly together form a curing cavity with an opening facing downwards. The curing cavity is used to place the pad. A ring-shaped water supply component (270) is provided on the top wall of the inner cavity. The water supply component (270) is used to spray water on the pad periodically.
2. The maintenance cover for stone pads according to claim 1, characterized in that: The frame assembly includes a rectangular base frame (210), with vertically arranged angle steel (220) at each of the four corners of the base frame (210). An angle steel frame (240) for installing the water conveying assembly (270) is provided between the top walls of the angle steel (220) at the four corners. A recessed collection groove (410) is formed on the top wall of the base frame (210), which is used to collect water adhering to the inner wall of the plastic film (110).
3. The maintenance cover for stone pads according to claim 1, characterized in that: An outer baffle (430) is formed on the top wall of the collection tank (410) on the side that contacts the inner wall of the plastic film (110), and an inner baffle (420) is formed on the top wall of the collection tank (410) on the side away from the plastic film (110). The height of the collection tank (410) is higher than the height of the inner baffle (420).
4. A maintenance cover for stone pads according to claim 2, characterized in that: A water inlet pipe (280) is formed on the side wall of the base frame (210) and a connecting pipe (260) is formed on the side wall of the base frame (210) and a collection tank (410).
5. A maintenance cover for stone pads according to claim 2, characterized in that: A vertically arranged guide tube (230) is provided between the angle steel frame (240) and the base frame (210), and a support tube (250) corresponding to the guide tube (230) is provided between the inner walls of the angle steel frame (240). The support tube (250) is inclined downward from the middle to both ends.
6. A maintenance cover for stone pads according to claim 5, characterized in that: The guide tube (230) has a cavity (320) that communicates with the collection tank (410) inside, and a drip groove (310) that is recessed inward is formed at the bottom wall of the support tube (250). The drip groove (310) is connected to the cavity (320).
7. A maintenance cover for stone pads according to claim 2, characterized in that: The top of the plastic film (110) is provided with a handle (120) installed at the angle steel frame (240).