Upstream and downstream slope protection construction reinforcing device for reservoir danger removal

By combining the anti-detachment mechanism and the protective net, the problem of loosening of existing slope reinforcement devices is solved, and the reinforcement frame is firmly fixed and the stability of the slope is improved, which also enables planting.

CN223633869UActive Publication Date: 2025-12-05FENGHUANG COUNTY WATER CONSERVANCY BUREAU
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202423238314.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-27
Publication Date
2025-12-05
Estimated Expiration
2034-12-27

AI Technical Summary

Technical Problem

The existing slope protection reinforcement devices have relatively simple fixing bolt structures, which are prone to loosening during long-term use and affect the protective effect of the slope.

Method used

An anti-detachment mechanism is adopted, including fixing blocks, insert rods, and conical plates. The insert rods are inserted through the reinforcement frame and fixed to the soil before the concrete hardens. Combined with the outward expansion and tilting design of the conical plates, the strength of the reinforcement frame is increased. Further reinforcement is carried out through protective netting and planting of vegetation to enhance the stability of the slope.

Benefits of technology

It effectively prevents the reinforcement frame from falling off, improves the stability and protection effect of the slope, and allows for planting, thus enhancing the long-term protection capability of the slope.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223633869U_ABST
    Figure CN223633869U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of slope protection construction, and discloses an upstream and downstream slope protection construction reinforcing device for reservoir danger removal. The slope protection device comprises a slope protection body and a U-shaped block, a plurality of reinforcing mechanisms are arranged at the front end of the slope protection body, anti-falling mechanisms are arranged at the four corners of the front end of each reinforcing mechanism, and protective nets are arranged on the opposite inner sides of the reinforcing mechanisms; before the slope protection body is laid, soil on the slope protection body is tamped firstly, and the rear end, needing to be covered, of the reinforcing frame is subjected to concrete reinforcing layer construction after the soil on the slope protection body is tamped; before the concrete is solidified, the reinforcing frame is placed at the front end of the concrete, then the anti-falling mechanisms penetrate through the holes formed in the four corners of the reinforcing frame, and the insertion rods penetrate through the reinforcing frame and the concrete to be fixed to compacted soil, so that the firmness of the reinforcing frame can be improved after the concrete is solidified, and the reinforcing frame is reinforced while the reinforcing frame is prevented from falling off.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The application belongs to the technical field of slope protection construction, in particular to a upstream and downstream slope protection construction reinforcement device for reservoir danger removal. BACKGROUND

[0002] The upstream and downstream slope protection construction reinforcement is an important measure to ensure the stability of the slope body and prevent water and soil loss, and helps to ensure the stability and effectiveness of the slope structure.

[0003] According to the search of the patent file CN 219327088 U, a foundation pit slope reinforcement device is disclosed, which comprises a fixed frame, a fixed block is arranged on the front end outer surface of the fixed frame, a fixed bolt is arranged on the rear end outer surface of the fixed frame, fixed clamping grooves are arranged at both ends of the inner wall of the fixed frame, a reinforcement mechanism is arranged on the inner wall of the fixed clamping groove, a protection and buffering mechanism is arranged on the rear end outer surface of the reinforcement mechanism, the protection and buffering mechanism comprises a fixed base, a fixed frame, a buffer pad and a fixed screw, the reinforcement mechanism comprises a connecting screw, a connecting piece, a reinforcement frame, a reinforcing rod, a reflective sheet, a fixed hole and a metal mesh. The foundation pit slope reinforcement device can protect the rear end of the reinforcement device, avoid damage to the slope caused by the collision of the reinforcement device, improve the reinforcement effect of the device, and facilitate people to observe the position of the reinforcement device at night.

[0004] However, the inventor has found that the technical solution still has at least the following defects:

[0005] The design uses a fixed bolt to fix the protection device, but the structure of the fixed bolt is relatively simple, and it may loosen to some extent during long-term fixation, which reduces the protection effect of the protection device on the slope, thereby affecting the subsequent slope. CONTENT OF THE UTILITY MODEL

[0006] The purpose of the present application is to solve the problems mentioned above, and to provide a upstream and downstream slope protection construction reinforcement device for reservoir danger removal.

[0007] The technical solution adopted by the present application is as follows: a upstream and downstream slope protection construction reinforcement device for reservoir danger removal, comprising a slope body and a U-shaped block, a plurality of reinforcement mechanisms are arranged at the front end of the slope body, a anti-dropping mechanism is arranged at the four corners of the front end of the reinforcement mechanism, and a protective net is arranged on the opposite inner side of the reinforcement mechanism; the anti-dropping mechanism comprises a fixed block, a plug rod is fixedly connected to the lower end of the fixed block, a plurality of rotating rods are fixedly connected to the outer end of the plug rod, and a conical sheet is arranged in the rotating rod.

[0008] Through the above technical scheme, before laying the utility model, the soil on the slope protection body is first tamped, the rear end covered by the reinforcing frame is reinforced by a concrete reinforcing layer after tamping, the reinforcing frame is placed in front of the concrete before the concrete solidifies, the anti-disengagement mechanism is penetrated through the holes formed in the four corners of the reinforcing frame, and the insertion rod is penetrated through the reinforcing frame and the concrete and the tamped soil to be fixed, which can increase the firmness of the reinforcing frame after the concrete solidifies, prevent the reinforcing frame from falling off, and reinforce the reinforcing frame.

[0009] In a preferred embodiment, the inner wall of the U-shaped block is fixedly connected with a connecting plate, the opposite inner side of the connecting plate is fixedly connected with a rotating rod, and the lower end of the conical sheet is rotationally connected with the rotating rod.

[0010] Through the above technical scheme, the conical sheet is outwardly expanded and inclined, which can be used to reinforce and grab the slope body when the reinforcing frame is loose, thereby increasing the firmness.

[0011] In a preferred embodiment, the reinforcing mechanism comprises a reinforcing frame, and four corners of the front end of the reinforcing frame are provided with holes through which the U-shaped blocks can be penetrated.

[0012] Through the above technical scheme, the reinforcing frame is fixed by penetrating the anti-disengagement mechanism, and the holes through which the U-shaped blocks can be penetrated facilitate the penetration of the U-shaped blocks after the penetration, thereby preventing the conical sheets after unfolding from falling off.

[0013] In a preferred embodiment, the inner side of the front end of the reinforcing frame is fixedly connected with a plurality of protective net threaded nails two, the outer end of the protective net threaded nails two is connected with a plurality of connecting blocks, and the opposite inner side of the connecting blocks is fixedly connected with a protective net one.

[0014] Through the above technical scheme, after the reinforcing frame is installed, the hollow part of the reinforcing frame can be protected by the protective net one, and the soil left inside the protective net one can be planted with plants, thereby further reinforcing the slope protection.

[0015] In a preferred embodiment, the outer side of the front end of the reinforcing frame is fixedly connected with a plurality of protective net fixed threaded nails, the outer end of the protective net fixed threaded nails is hingedly connected with the protective net, and the upper end of the fixed block is penetrated and threadedly connected with a reinforcing threaded nail.

[0016] Through the above technical scheme, the two sides of the protective net are connected with the protective net fixed threaded nails, which can fix the protective net and facilitate replacement of the protective net.

[0017] In summary, due to the adoption of the above technical scheme, the beneficial effects of the present application are:

[0018] In the application, before laying the utility model, the soil on the slope protection body is first tamped, the rear end covered by the reinforcing frame is reinforced with a concrete reinforcing layer after tamping, the reinforcing frame is placed in front of the concrete before the concrete solidifies, the anti-disengagement mechanism is penetrated through the holes provided in the four corners of the reinforcing frame, the insertion rod is penetrated through the reinforcing frame and the concrete and the tamped soil to be fixed, which can increase the firmness of the reinforcing frame after the concrete solidifies, prevent the reinforcing frame from falling off, and reinforce the reinforcing frame at the same time, the hollow part of the reinforcing frame can be protected by the protective net one, the soil reserved in the protective net one can be planted with plants, so as to further reinforce the slope protection, and the reinforcing frame and the protective net on both sides of the reinforcing frame can protect the large-area slope protection; through the cooperation of the above structures, the slope protection is reinforced and protected. BRIEF DESCRIPTION OF DRAWINGS

[0019] Figure 1 It is a structural schematic view of the application;

[0020] Figure 2 It is a front view in the application;

[0021] Figure 3 It is a structural schematic view of the reinforcing mechanism in the application;

[0022] Figure 4 It is a structural schematic view of the anti-disengagement mechanism in the application;

[0023] Figure 5 It is a top view of the anti-disengagement mechanism in the application.

[0024] Marked in the figure: 1, slope body; 2, reinforcing mechanism; 201, reinforcing frame; 202, protective net fixing screw; 203, protective net screw two; 204, protective net one; 3, anti-disengagement mechanism; 301, fixed block; 302, insertion rod; 303, U-shaped block; 304, rotating rod; 305, conical piece; 306, reinforcing screw; 307, connecting plate; 4, protective net. DETAILED DESCRIPTION

[0025] To make the purpose, technical scheme and advantages of the embodiments of the application more clear, the technical scheme in the embodiments of the application will be described clearly and completely below in combination with the embodiments of the application. Obviously, the described embodiments are part of the embodiments of the application, rather than all the embodiments of the application. Based on the embodiments in the application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the application.

[0026] Embodiment:

[0027] Reference Figures 1-5The utility model provides a reservoir danger removal use upstream and downstream slope protection construction reinforcing device, including slope protection body 1 and U block 303, the front end of slope protection body 1 is provided with multiple reinforcing mechanisms 2, the front end four corners of reinforcing mechanism 2 are provided with anti -drop mechanism 3, and the opposite inner side of reinforcing mechanism 2 is provided with protective net 4;Anti -drop mechanism 3 includes fixed block 301, the lower end of fixed block 301 is fixedly connected with plug rod 302, the outer end of plug rod 302 is fixedly connected with multiple groups of rotating rod 304, the inside of rotating rod 304 is provided with conical sheet 305, before laying the utility model, the soil on the slope body is rammed first, after ramming, the rear end that reinforcing frame 201 needs to cover is reinforced with concrete layer, reinforcing frame 201 is placed into the concrete front end before the concrete solidification, then anti -drop mechanism 3 is penetrated through the hole of the four corners of reinforcing frame 201, and plug rod 302 is penetrated through reinforcing frame 201 and the concrete and rammed soil are fixed, can be used to increase the firmness of reinforcing frame 201 after the concrete solidification, prevent reinforcing frame 201 from falling off and reinforce reinforcing frame 201 at the same time.

[0028] Referring to Figures 1-5 , the inner wall of U block 303 is fixedly connected with connecting plate 307, the opposite inner side of connecting plate 307 is fixedly connected with rotating rod 304, the lower end of conical sheet 305 is rotatably connected with rotating rod 304, and the conical sheet 305 is outwardly expanded and inclined, which can be used to reinforce and grab the slope body 1 when reinforcing frame 201 loosens, thereby increasing the firmness.

[0029] Referring to Figures 1-5 , reinforcing mechanism 2 includes reinforcing frame 201, the four corners of the front end of reinforcing frame 201 are provided with holes for penetrating U block 303, reinforcing frame 201 is fixed through penetrating anti -drop mechanism 3, and the holes for penetrating U block 303 facilitate the penetration of U block 303 after the penetration, so that the conical sheet 305 after unfolding does not fall off.

[0030] Referring to Figures 1-5 , the inner side of the front end of reinforcing frame 201 is fixedly connected with multiple protective net thread nails two 203, the outer end of protective net thread nails two 203 is connected with multiple connecting blocks, the opposite inner side of the connecting block is fixedly connected with protective net one 204, after the installation of reinforcing frame 201, the hollow part of reinforcing frame 201 can be protected through protective net one 204, and the soil left in the interior of protective net one 204 can be planted with plants, so as to further reinforce the slope.

[0031] Referring to Figures 1-5 , the outer side of the front end of reinforcing frame 201 is fixedly connected with multiple protective net fixed thread nails 202, the outer end of protective net fixed thread nails 202 is hinged with protective net 4, and the upper end of fixed block 301 is threadedly connected with reinforcing thread nails 306, the two sides of protective net 4 are connected with protective net fixed thread nails 202, so that protective net 4 can be fixed, and protective net 4 can be replaced.

[0032] The implementation principle of the embodiment of the reservoir danger-removing upstream and downstream slope protection construction reinforcing device is:

[0033] Before laying the utility model, the soil on the slope protection body is first tamped, the rear end to be covered by the reinforcing frame 201 is reinforced with a concrete layer after tamping, the reinforcing frame 201 is placed into the front end of the concrete before the concrete solidifies, the anti-disengagement mechanism 3 is penetrated through the holes provided at the four corners of the reinforcing frame 201, the insertion rod 302 is penetrated through the reinforcing frame 201 and the concrete and the tamped soil to be fixed, the firmness of the reinforcing frame 201 can be increased after the concrete solidifies, the reinforcing frame 201 is prevented from falling off, the reinforcing frame 201 is reinforced at the same time, the hollow part of the reinforcing frame 201 can be protected through the protective net 1 204, the soil reserved in the protective net 1 204 can be planted with plants, so that the slope is further reinforced, the large-area slope can be protected through the reinforcing frame 201 and the protective net 4 on the two sides of the reinforcing frame 201; through cooperation of the above structure, the slope is reinforced and protected.

[0034] The above embodiments are only used to illustrate the technical solutions of the application, rather than limit them; although the application is described in detail with reference to the foregoing embodiments, those skilled in the art should understand that the technical solutions recorded in the foregoing embodiments can be modified or some technical features can be replaced equivalently; the modification or replacement does not make the essence of the corresponding technical solution deviate from the spirit and scope of the technical solutions of the embodiments of the application.

Claims

1. A reservoir risk-removal upstream and downstream slope construction reinforcement device, comprising a slope body (1) and a U-shaped block (303), characterized in that: The front end of the slope protection body (1) is provided with a plurality of reinforcing mechanisms (2), the front end of the reinforcing mechanism (2) is provided with a anti-off mechanism (3) at four corners, the opposite inner side of the reinforcing mechanism (2) is provided with a protective net (4); The anti-off mechanism (3) comprises a fixed block (301), the lower end of the fixed block (301) is fixedly connected with a inserting rod (302), the outer end of the inserting rod (302) is fixedly connected with a plurality of rotating rods (304), the inside of the rotating rod (304) is provided with a tapered sheet (305).

2. The upstream and downstream slope construction reinforcement device for reservoir danger removal according to claim 1, characterized in that: The inner wall of the U-shaped block (303) is fixedly connected with a connecting plate (307), the opposite inner side of the connecting plate (307) is fixedly connected with a rotating rod (304), the lower end of the tapered sheet (305) is rotatably connected with the rotating rod (304).

3. The upstream and downstream slope construction reinforcement device for reservoir danger removal according to claim 1, characterized in that: The reinforcing mechanism (2) comprises a reinforcing frame (201), the front end of the reinforcing frame (201) is provided with a hole for the U-shaped block (303) to penetrate.

4. The upstream and downstream slope construction reinforcement device for reservoir danger removal according to claim 3, characterized in that: The front end of the reinforcing frame (201) is fixedly connected with a plurality of protective net thread nails two (203), the outer end of the protective net thread nails two (203) is clamped with a plurality of connecting blocks, the opposite inner side of the connecting block is fixedly connected with a protective net one (204).

5. The upstream and downstream slope construction reinforcement device for reservoir danger removal according to claim 4, characterized in that: The front end of the reinforcing frame (201) is fixedly connected with a plurality of protective net fixed thread nails (202), the outer end of the protective net fixed thread nails (202) is hingedly connected with the protective net (4), the upper end of the fixed block (301) penetrates a reinforcing thread nail (306) in a threaded connection.

Citation Information

Patent Citations

  • Foundation pit slope protection reinforcing device

    CN219327088U