Novel drainer locking nut and drainer with novel drainer locking nut

By integrating the connecting block into the drain pipe body in the drain lock nut, the problems of poor rigidity and complex manufacturing in the prior art are solved, achieving a connection effect that is simple in structure, high in strength and low in cost.

CN223635095UActive Publication Date: 2025-12-05NANAN CHANGTONG SANITARY WARE TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520048164.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-09
Publication Date
2025-12-05
Estimated Expiration
2035-01-09

AI Technical Summary

Technical Problem

The existing drain lock nuts have poor rigidity during assembly, are easily damaged, and have a complex manufacturing process and high cost.

Method used

The drain pipe body is connected to the pipe using a connecting block. The connecting block is designed to be an integral part of the drain pipe body and the drain pipe body. The connecting block has strong rigidity and is fixed to the inner wall of the drain channel. The connecting block has a water guiding chamber and a water guiding channel. The surface of the drain pipe body is provided with anti-slip stripes and sealing grooves. The drain pipe is provided with threads and stepped bosses.

Benefits of technology

It improves the rigidity and sealing of the connection, simplifies the manufacturing process, and reduces costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223635095U_ABST
    Figure CN223635095U_ABST
Patent Text Reader

Abstract

The utility model provides a novel drainer locking nut with a simple structure and high strength and a drainer with the novel drainer locking nut, which comprise a drainer main body, and are characterized by also comprising a drainer connecting pipe body, a sewer pipe arranged on the drainer connecting pipe body and connected with a pipeline, and at least two connecting blocks connected with the drainer connecting pipe body, a sewer channel communicated with a sewer pipe is formed in the sewer connecting pipe body, one end of the connecting block is fixedly arranged on the inner wall of the sewer channel, and a connecting device connected with a pipeline on the drainer body is arranged at the other end of the connecting block.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of sewer, especially a new sewer locking nut and a sewer with the new sewer locking nut. BACKGROUND

[0002] The sewer is a connector frequently used in bathroom products and kitchen and bathroom products, and the new sewer locking nut is an indispensable part of the sewer. Figure 1 As shown in the prior art sewer locking nut, a sewer connector body 1', a sewer pipe 2' connected to the pipe at the lower end of the sewer connector body 1', the sewer connector body 1' is provided with a sewer passage 3' penetrating through the sewer connector body 1', the connection pipe 4' is provided in the sewer passage 3' of the sewer connector body 1', the connection pipe 4' and the sewer connector body 1' have a water guide groove 5', a plurality of water outlet passages are formed in the bottom of the connection pipe 4' and are in communication with the water guide groove 5', so that the overflow water can flow out from the connection pipe 4' after entering the water guide groove 5', and a thread is formed in the inside of the connection pipe 4' and is connected to the sewer.

[0003] To solve this problem, the utility model is produced. UTILITY MODEL CONTENTS

[0004] Therefore, in view of the above problems, the utility model provides a new sewer locking nut with simple structure and high strength and a sewer with the new sewer locking nut.

[0005] To solve the above technical problems, the utility model adopts the following solution: the new sewer locking nut comprises a sewer connector body, a sewer pipe connected to the pipe on the sewer connector body, and at least two connection blocks connected to the sewer connector body, a sewer passage is formed in the sewer connector body and is in communication with the sewer pipe, one end of the connection block is fixedly arranged on the inner wall of the sewer passage, and the other end of the connection block is provided with a connection device connected to the sewer pipe.

[0006] Further improvement is that the connection device is that the connection block is provided with a connection thread matched with the sewer pipe.

[0007] Further improvement is that the connection block is provided with a water guide chamber, and a water guide passage is formed in the bottom of the connection block and penetrates through the connection block to connect the water guide chamber and the sewer passage.

[0008] Further improvement is that the surface of the drain pipe body is provided with a plurality of anti-skid stripes.

[0009] Further improvement is that the upper end of the drain pipe body is provided with a sealing groove.

[0010] Further improvement is that the drain pipe is provided with a thread connected with the pipeline.

[0011] Further improvement is that the drain pipe is provided with a plurality of stepped bosses connected with the pipeline.

[0012] Further improvement is that the connecting block has four.

[0013] The drain ware with the novel drain ware locking nut comprises a drain ware body, a drain pipe body, a drain pipe connected with the pipeline, at least two connecting blocks connected with the drain pipe body, a drain passage communicated with the drain pipe in the drain pipe body, one end of the connecting block fixedly arranged on the inner wall of the drain passage, and a connecting device arranged on the other end of the connecting block and connected with the pipeline of the drain ware body.

[0014] Further improvement is that the connecting device is that the connecting block is provided with a connecting thread matched with the pipeline of the drain ware.

[0015] Further improvement is that the connecting block is provided with a water guide chamber, and the bottom of the connecting block is provided with a water guide passage penetrating through the connecting block and communicated with the water guide chamber and the drain passage.

[0016] Further improvement is that the surface of the drain pipe body is provided with a plurality of anti-skid stripes.

[0017] Further improvement is that the upper end of the drain pipe body is provided with a sealing groove.

[0018] Further improvement is that the drain pipe is provided with a thread connected with the pipeline.

[0019] Further improvement is that the drain pipe is provided with a plurality of stepped bosses connected with the pipeline.

[0020] Further improvement is that the connecting block has four.

[0021] By adopting the foregoing technical scheme, the utility model has the beneficial effects that:

[0022] The structure is simple and the strength is high. When installation, the connecting block is connected, the connecting block has strong rigidity, is not easy to damage when being screwed, the connecting block is fixed on the inner wall of the drain passage and is integrally arranged with the drain pipe body, the rigidity is further improved, the connecting block is not easy to be damaged, the screwed nut and the drain pipe body are more beneficial to be screwed, and the connecting block is better connected and the sealing of the connection is improved. Meanwhile, the connecting block is directly integrally arranged, the structure is simple, the process is simple, manufacturing is greatly facilitated, and the cost is reduced. BRIEF DESCRIPTION OF DRAWINGS

[0023] Figure 1 is a sectional view of a prior art drain lock nut.

[0024] Figure 2 is a sectional view of a prior art drain lock nut.

[0025] Figure 3 is a sectional view of a prior art drain lock nut.

[0026] Figure 4 is a sectional view of a prior art drain lock nut. DETAILED DESCRIPTION

[0027] The utility model is further described in combination with the drawings and specific embodiments.

[0028] REFERENCE Figures 2-3 The utility model discloses a novel drain lock nut, which comprises a drain pipe body, a drain pipe body 1, a drain pipe 2 arranged on the drain pipe body 1 and connected with a pipeline, at least two connecting blocks 4 connected with the drain pipe body 1, a drain passage 3 arranged in the drain pipe body 1 and communicated with the drain pipe 2, the connecting block 4 is fixed on the inner wall of the drain passage 3, the connecting block 4 is arranged in a ring and is uniformly distributed, and the other end of the connecting block 4 is matched with the pipeline of the drain pipe body and is provided with a connecting thread. When installation, the connecting block 4 is directly screwed into the connecting block 4, and the installation is completed. Since the connecting block 4 is connected, the connecting block 4 has strong rigidity and is not easy to be damaged when being screwed, and the connecting block 4 is fixed on the inner wall of the drain passage 3 and is integrally arranged with the drain pipe body 1, the rigidity is further improved, the connecting block 4 is not easy to be damaged, the screwed nut and the drain pipe body are more beneficial to be screwed, and the connecting block 4 is better connected and the sealing of the connection is improved. Meanwhile, the connecting block 4 is directly integrally arranged, the structure is simple, the process is simple, manufacturing is greatly facilitated, and the cost is reduced.

[0029] In order to make the overflow water enter into the sewer channel 3 better and faster, the connecting block 4 is provided with a water guide chamber 5, and the bottom of the connecting block 4 is provided with a water guide channel (not shown in the figure) penetrating through the connecting block 4 to make the water guide chamber 5 and the sewer channel 3 communicate. Wherein, the water guide chamber 5 is arranged on the connecting block 4, so that the overflow water can enter into the water guide chamber 5, thereby making the overflow water at each position enter into the sewer channel 3, thereby improving the water seepage efficiency, and better discharging the overflow water.

[0030] In order to better twist the nut, thereby better connecting with the sewer main body, the surface of the sewer connector body 1 is provided with a plurality of anti-skid stripes 7.

[0031] In order to make the sealing ring on the sewer main body and the nut seal more conveniently, and improve the sealing effect, the upper end of the sewer connector body 1 is provided with a sealing groove 6.

[0032] As shown in the figure, Figure 2 In order to make the sewer pipe 2 and the external pipeline connect conveniently, the sewer pipe 2 is provided with a thread connected with the pipeline.

[0033] In order to make the pipeline of the sewer main body and the connecting block 4 connect more firmly, the connecting block 4 has four.

[0034] In order to make the sewer better, the connection between the sewer connector body 1 and the sewer pipe is conically arranged, so that the water flowing into the sewer channel 3 can flow out better.

[0035] As shown in the figure, Figure 4 Based on the above scheme, the connection mode of the sewer pipe 2 and the external pipeline can also be that the sewer pipe 2 is provided with three stepped bosses 8 connected with the pipeline.

[0036] The basic principle and main features of the utility model and its advantages are shown and described, and the person skilled in the art should understand that the utility model is not limited by the above examples, and the above examples and descriptions are only to illustrate the principle of the utility model, and various changes and improvements can be made without departing from the spirit and scope of the utility model, and these changes and improvements all fall within the scope of the utility model claimed, and the protection scope of the utility model is defined by the appended claims and their equivalents.

Claims

1. A new type of sewer lock nut, comprising a sewer connector body, a sewer pipe arranged on the sewer connector body and connected with a pipeline, and a sewer passage arranged in the sewer connector body and communicated with the sewer pipe, characterized in that: The connecting block is provided with a water guide chamber, and a water guide channel is formed through the connecting block to connect the water guide chamber and the drain passage.

2. The new locknut for a drain according to claim 1, characterized in that: The connecting block is provided with a water guide chamber, and a water guide channel is formed through the connecting block to connect the water guide chamber and the drain passage.

3. The new locknut for a drain according to claim 1, characterized in that: The drain pipe is provided with a plurality of stepped bosses for connecting with the pipeline.

4. The new locknut for a drain according to claim 1, characterized in that: The connecting block has four.

5. The new drain lock nut according to claim 1, wherein: The connecting block is provided with a water guide chamber, and a water guide channel is formed through the connecting block to connect the water guide chamber and the drain passage.

6. The new drain lock nut of claim 1, wherein: The connecting block is provided with a water guide chamber, and a water guide channel is formed through the connecting block to connect the water guide chamber and the drain passage.

7. The new drain lock nut of claim 1, wherein: The drain pipe is provided with a plurality of stepped bosses for connecting with the pipeline.

8. The new drain lock nut of claim 1, wherein: The connecting block has four.

9. A drain with a new type of drain lock nut, comprising a drain body, characterized in that: The connecting block is provided with a water guide chamber, and a water guide channel is formed through the connecting block to connect the water guide chamber and the drain passage.

10. The new-style disposer locknut disposer according to claim 9, wherein: The connecting block is provided with a water guide chamber, and a water guide channel is formed through the connecting block to connect the water guide chamber and the drain passage.

11. The drain according to claim 9, wherein: The drain pipe is provided with a plurality of stepped bosses for connecting with the pipeline.

12. The drain according to claim 9, wherein: The connecting block has four.

13. The drain with a new type of locknut for the drain according to claim 9, characterized in that: ​ 14. The drain according to claim 9, wherein: ​ 15. The drain according to claim 9, wherein: ​ 16. The drain with a new locking nut of the drain according to claim 9, characterized by: ​