Oil injection extension device for front end bearing of gear and rack type lifting equipment
By designing an extension device for the front bearing of the rack and pinion lifting equipment, the oil injection hole is extended to a position that is easy to operate, which solves the problems of safety hazards and high labor intensity in high-altitude operations, and achieves improved safety and increased oil injection efficiency.
Patent Information
- Application Number
- CN202520169616.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-24
- Publication Date
- 2025-12-05
- Estimated Expiration
- 2035-01-24
AI Technical Summary
The bearing oil injection holes of the rack and pinion lifting equipment on offshore wind power installation vessels are located at high altitudes, which poses significant safety hazards and high labor intensity for manual high-altitude suspended operations, and existing technologies are unable to effectively solve this problem.
Design a front bearing oil injection extension device for a rack and pinion lifting device. The oil injection hole is extended to a convenient operation position by means of a ferrule and a single oil pipe clamp, and fixed by a support and a single oil pipe clamp. Multiple oil injection nozzles are centrally arranged to reduce the labor intensity of operators.
It achieves improved safety and reduced labor intensity, increased oil injection efficiency, avoids the safety risks of working at height, and simplifies the replacement and maintenance process of oil pipes.
Smart Images

Figure CN223635898U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to bearing oil injection system, in particular to a gear rack type lifting equipment front end bearing oil injection extension device. BACKGROUND
[0002] At present, offshore wind power installation ships mostly adopt the form of outrigger ships, among the outrigger ships, the gear rack type self-elevating and self-propelled integrated offshore wind power installation platform is the main design form, mainly composed of a ship body, four truss type pile legs, four sets of gear rack type lifting systems and the like. The bearing used by each set of lifting system will reserve an oil injection hole on the end cover thereof, facilitating the replacement of lubricating oil in the later period, but the highest motor in the lifting system is more than 8 meters away from the main deck, and there is no operation platform for personnel to stand around the oil injection hole of the motor bearing end cover, so it is difficult to replace the lubricating oil. At present, the replacement of lubricating oil is usually completed by manual high-altitude suspension operation, the internal truss of the pile leg is complex, the bottom is directly connected to the sea, and the safety hidden danger is large during operation, and each set of lifting system has six rows of oil injection nozzles, all of which are operated manually, so the labor intensity is large. SUMMARY
[0003] The utility model solves the technical problem that a gear rack type lifting equipment front end bearing oil injection extension device is provided, the oil injection hole is extended to a position convenient for operation, the safety problem during high-altitude oil injection operation is avoided, the labor intensity of the operating personnel is effectively reduced, and the oil injection efficiency is improved.
[0004] To solve the above technical problems, the utility model adopts the technical scheme that:
[0005] A gear rack type lifting equipment front end bearing oil injection extension device, including the sleeve, the sleeve one end is connected with the first oil injection nozzle on the corresponding bearing end cover, the other end is connected with the oil pipe, a plurality of oil pipes are parallelled and led out and are fixed through a plurality of groups of oil pipe single pipe clamps, each group of oil pipe single pipe clamp can be detachably installed on the support of the fixed pile frame, the input end of each group of oil pipe is connected with the second oil injection nozzle through the oil injection nozzle connector, and the second oil injection nozzle is arranged at a position convenient for operation.
[0006] A plurality of second oil injection nozzles are arranged in a centralized manner.
[0007] The support is processed from angle steel and includes vertical angle steel and horizontal angle steel, the lower end of the vertical angle steel is welded with the fixed pile frame, and the upper end is welded and fixed with the horizontal angle steel.
[0008] The oil pipe single pipe clamp includes a lower pipe clamp and an upper pipe clamp, and the lower pipe clamp and the upper pipe clamp are screwed through bolts and form a locking hole through which the oil pipe passes.
[0009] The utility model provides a gear rack type lifting equipment front end bearing oil injection extension device, which has the following technical effects:
[0010] 1) By extending the oil injection port of the front cover of the lifting equipment to a convenient position below through the oil injection pipeline, the safety problems of workers when performing oil injection operations at height are avoided. At the same time, the oil injection ports in the same row are concentrated in one place, which effectively reduces the labor intensity of the workers and improves the oil injection efficiency.
[0011] 2) By using supports, the vertical angle steel section of the supports is welded to the surface of the fixed pile frame, reducing the impact of welding on the surface of the fixed pile frame. The oil pipe single clamp is fixed to the right angle side of the angle steel by bolts, which facilitates the replacement and maintenance of the oil pipe in the future.
[0012] The single pipe clamp consists of two steel plates on the top and bottom, and two polymer materials in the middle. The clamping force comes from the bolt fastening, so a support 7 is needed to give the single pipe clamp a certain space to install the bolt. Attached Figure Description
[0013] The present invention will be further described below with reference to the accompanying drawings and embodiments:
[0014] Figure 1 This is a schematic diagram (front view) of the layout of this utility model.
[0015] Figure 2 This is a schematic diagram showing the connection between the single pipe clamp and the support in this utility model.
[0016] Figure 3 This is a schematic diagram of the structure of the second oil nozzle in this utility model.
[0017] Figure 4 This is a schematic diagram of the ferrule structure in this utility model.
[0018] In the diagram: 1. Oil pipe; 2. Second oil injection nozzle; 3. Compression fitting; 4. Oil pipe clamp; 5. Pipe connector; 6. Oil injection nozzle connector; 7. Support; 8. Bearing end cap; 9. Pile frame; 10. Main deck. Detailed Implementation
[0019] like Figure 1 As shown, a gear and rack type lifting device front bearing oil injection extension device includes a fixed pile frame 9, which is the main structure of the self-elevating platform leg cofferdam. Multiple sets of supports 7 are fixed on the upper surface of the fixed pile frame 9. Each set of supports 7 is equipped with a single oil pipe clamp 4, which provides centralized fixed support for multiple sets of oil pipes 1. One end of each set of oil pipes 1 is connected to the first oil injection nozzle (stainless steel flat-mouth grease nipple) on the bearing end cover 8 through a clamp 3, and the other end of each set of oil pipes 1 is connected to the second oil injection nozzle 2 (stainless steel flat-mouth grease nipple) through a grease nipple connector 6.
[0020] Each support 7 is welded by vertical angle steel perpendicular to the surface of the fixed pile frame 9 and horizontal angle steel parallel to the surface of the fixed pile frame 9, and the upper end of the horizontal angle steel is arranged with the oil pipe single pipe clamp 4. The oil pipe single pipe clamp 4 is used for clamping the pipeline. The oil pipe single pipe clamp 4 is composed of a lower pipe clamp 4.1 and an upper pipe clamp 4.2, and the lower pipe clamp 4.1, the upper pipe clamp 4.2 and the horizontal angle steel are all provided with mounting holes, and bolts pass through the mounting holes of the lower pipe clamp 4.1, the upper pipe clamp 4.2 and the horizontal angle steel and are tightened, and the lower pipe clamp 4.1 and the upper pipe clamp 4.2 form a locking hole 4.3 through which the oil pipe 1 passes.
[0021] The surface of the part with poor corrosion resistance is subjected to galvanizing treatment. The part with poor corrosion resistance specifically refers to the support 7, the oil pipe single pipe clamp 4 and the like.
[0022] When the oil pipe 1 is long, a plurality of oil pipes 1 can be connected and lengthened through the pipeline connecting head 5.
[0023] As shown in Figure 4 The sleeve 3 is made of stainless steel, one end of the sleeve 3 is connected with the oil pipe 1 as a whole, and the other end of the sleeve 3 is tightly connected with the bearing end cover 8 through threads.
[0024] One end of the oil nozzle connecting head 6 is connected with the oil pipe 1 and is tightened through a rubber ring and a nut, and the other end of the oil nozzle connecting head 6 is connected with the second oil nozzle 2 through threads.
[0025] The sleeve 3, the pipeline connecting head 5 and the oil nozzle connecting head 6 all adopt the existing conventional pipe joint connecting structure.
[0026] Preferably, the oil pipe single pipe clamp 4 and the support 7 are coated with a corrosion-resistant layer.
[0027] Preferably, the second oil nozzle 2 is arranged close to the main deck 10.
[0028] Working principle and process: Before the modification, the upper oil injection hole needs to be climbed to inject oil, and after the modification, the pipeline is lengthened and arranged downward and concentrated below, and when injecting oil, only the oil injection port of the oil injection machine and the second oil nozzle 2 of the pipeline need to be connected, the oil injection machine is provided with an oil pump, and the lubricating oil is directly input upward to complete the oil injection.
Claims
1. A rack and pinion lift front end bearing oiling extension device, characterized by: The oil injection system comprises a sleeve (3), one end of the sleeve (3) is connected with a first oil injection nozzle on a corresponding bearing end cover (8), the other end is connected with an oil pipe (1), a plurality of oil pipes (1) are combined and led out and fixed through a plurality of groups of oil pipe single pipe clamps (4), each group of oil pipe single pipe clamp (4) is detachably installed on a support (7) of a fixed pile frame (9), and an input end of each group of oil pipe (1) is connected with a second oil injection nozzle (2) through an oil injection nozzle connecting head (6).
2. A rack and pinion lift front end bearing oiling extension as defined in claim 1, wherein: A plurality of groups of second oil injection nozzles (2) are arranged in a centralized manner.
3. The oiling extension device for rack and pinion lift front end bearing of claim 1, wherein: The support (7) is made of angle steel and comprises vertical angle steel and horizontal angle steel, the lower end of the vertical angle steel is welded with the fixed pile frame (9), and the upper end is welded and fixed with the horizontal angle steel.
4. The oiling extension device for rack and pinion lift front end bearing of claim 1, wherein: The oil pipe single pipe clamp (4) comprises a lower pipe clamp (4.1) and an upper pipe clamp (4.2), the lower pipe clamp (4.1) and the upper pipe clamp (4.2) are tightened through bolts and form a locking hole (4.3) through which the oil pipe (1) passes.
5. The oiling extension device for rack and pinion lift front end bearing of claim 1, wherein: The oil pipe single pipe clamp (4) and the support (7) are coated with a corrosion-resistant layer.
6. A pinion rack type lift apparatus front end bearing oiling extension device according to claim 1, characterized in that: The second oil injection nozzle (2) is arranged at a position close to a main deck (10).
7. The oiling extension device for rack and pinion lift front end bearing of claim 1, wherein: The oil pipes (1) are connected and extended through pipeline connecting heads (5).