Safety belt auxiliary hanging structure and combination

By designing a safety belt auxiliary suspension structure with limit rods and buckles, the problem of the suspension structure being unable to detach in an emergency and move horizontally during high-altitude operations was solved, achieving safety assurance and maximizing the working range in the event of a fire or toxic substance leak.

CN223668504UActive Publication Date: 2025-12-16FRIENDSHIP INT ENG CONSULTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422632685.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-30
Publication Date
2025-12-16
Estimated Expiration
2034-10-30

AI Technical Summary

Technical Problem

In high-altitude operations, existing safety belt suspension structures cannot provide safety guarantees for emergency escape and horizontal movement in the event of fire or leakage of toxic or corrosive substances, and cannot maximize the working range when performing tasks such as exterior wall painting.

Method used

Design a safety belt auxiliary suspension structure, including a limiting rod and a buckle. The limiting rod is connected to the concrete exterior wall through a threaded structure, and the buckle is used to fix the safety belt hook, which, together with the safety rope, provides a stable suspension structure.

Benefits of technology

It improves the safety of construction workers when working at heights, ensuring that they can evacuate in an emergency and move horizontally within a certain range, providing good safety assurance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223668504U_ABST
    Figure CN223668504U_ABST
Patent Text Reader

Abstract

The utility model discloses a safety belt auxiliary suspension structure and combination, which comprises a limit rod, the limit rod is used for penetrating through a retention hole, one end part of the limit rod is provided with a first fastener, the first fastener is provided with a first through hole part, and the first through hole part is used for allowing a hook connected with a safety belt to penetrate through. According to the safety belt hanging device, the limiting rod and the first buckle piece are arranged, the limiting rod penetrates through the retention hole in the concrete outer wall and then is matched with a constructor to use the hook at one end of the safety rope worn on the body to be hung in the first through hole part, and therefore a good safety belt hanging structure is provided for the constructor working aloft; the safety coefficient of constructors during high-altitude operation is improved, and the safety of the constructors during construction is effectively guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to construction safety auxiliary tool technical field especially safety belt auxiliary suspension structure and combination. BACKGROUND

[0002] When working on high platform or scaffold, the worker must wear safety helmet and safety belt according to the state regulation, and the safety belt must be hung on reliable hanging point. With the improvement of the safety consciousness of the worker, at present, the safety belt as essential protective article is widely used when working at high place, which avoids the safety risk of falling when stepping on empty or slipping and guarantees the safety of the worker working at high place.

[0003] But for some high-altitude operation such as external wall painting, the safety belt worn by the worker can not only protect safety when falling, but also can be separated in emergency when fire or toxic and corrosive material leakage accident occurs, and need to be horizontally moved within a certain range (such as 5 meters) to realize the maximization of the operation range.

[0004] Therefore, it is urgent to provide a safety belt auxiliary suspension structure to solve the problems. CONTENT OF THE UTILITY MODEL

[0005] Therefore, the utility model aims at providing a safety belt auxiliary suspension structure applied to external wall, which effectively guarantees the safety of the construction personnel during construction.

[0006] In order to solve the above technical problem, the utility model adopts the technical scheme of a safety belt auxiliary suspension structure, which comprises a limiting rod, the limiting rod is arranged through a retention hole, one end of the limiting rod is provided with a first buckle, a first perforated part is arranged on the first buckle, and the first perforated part is arranged for the hook connected with the safety belt.

[0007] In one embodiment, the limiting rod is a threaded rod structure, and the threaded structure arranged on the outer side of the limiting rod is threadedly connected with the retention hole on the concrete external wall.

[0008] In one embodiment, the first buckle is integrally formed with the limiting rod.

[0009] In one embodiment, the first buckle is threadedly connected with one end of the limiting rod, the first buckle comprises an integrally formed connecting block and buckle block, the connecting block is a cylindrical structure, a threaded groove is arranged in the connecting block, one end of the limiting rod is clamped in the threaded groove, and the limiting rod is threadedly connected with the connecting block; the cross section of the buckle block is triangular structure, and the first perforated part is arranged through the buckle block.

[0010] In one of the embodiments, the other end of the limiting rod is provided with a threaded part, and a nut member is connected to the threaded part.

[0011] In one of the embodiments, the nut member comprises a nut block, which is threadedly connected with the limiting rod.

[0012] In one of the embodiments, the nut member further comprises a pad block, which is integrally formed with the nut block and is threadedly connected with the limiting rod, and the cross-sectional area of the pad block is larger than that of the nut block.

[0013] In one of the embodiments, the other end of the limiting rod is provided with a threaded part, and a limiting sleeve rod is connected to the threaded part, and a second buckle member is arranged at one end of the limiting sleeve rod, and a second perforated part is arranged on the second buckle member, and the second perforated part is used for allowing a safety belt hook to pass through.

[0014] In one of the embodiments, the limiting sleeve rod is provided with a connecting sleeve rod, which is integrally formed with the second buckle member and the limiting rod, and the connecting sleeve rod is sleeved on the threaded part of the other end of the limiting rod and is arranged close to a concrete outer wall.

[0015] The utility model also provides a kind of safety belt auxiliary suspension combination, it includes first safety belt auxiliary suspension structure, second safety belt auxiliary suspension structure and safety rope, the first safety belt auxiliary suspension structure and second safety belt auxiliary suspension structure all include limiting rod, the limiting rod is used to be arranged in the retention hole, and the first buckle member is arranged at one end of the limiting rod, and first perforated part is arranged on the first buckle member;The safety rope is provided with two hooks respectively at two ends, and the two hooks are connected with the first perforated part of the first buckle member of the first safety belt auxiliary suspension structure and the second safety belt auxiliary suspension structure respectively, and the safety rope is used for the safety belt hook to be hung and arranged.

[0016] In conclusion, the utility model discloses a kind of safety belt auxiliary suspension structure and combination, by being provided with limiting rod and first buckle member, after limiting rod is arranged in the retention hole on concrete outer wall, cooperation construction personnel is hung and held in first perforated part using the hook of one end of safety rope worn on body, to provide good safety belt suspension structure for construction personnel of high-altitude operation, to improve the safety factor of construction personnel when high-altitude operation, effectively guarantee the safety of construction personnel when construction. ACCURATE DRAWINGS

[0017] Figure 1 It is the use state diagram of the first safety belt auxiliary suspension structure of the utility model;

[0018] Figure 2The first safety belt auxiliary suspension structure is another perspective view of the use state diagram of the utility model;

[0019] Figure 3 The safety belt auxiliary suspension structure is a structure schematic diagram of the utility model;

[0020] Figure 4 The safety belt auxiliary suspension structure is a structure exploded view of the utility model;

[0021] Figure 5 The second safety belt auxiliary suspension structure is a use state diagram of the utility model;

[0022] Figure 6 The safety belt auxiliary suspension structure is a use state diagram of the utility model. DETAILED DESCRIPTION

[0023] The technical solutions of the utility model will be described clearly and completely below in combination with the drawings. Obviously, the described embodiments are part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by the ordinary skilled in the art without making creative efforts belong to the protection scope of the utility model.

[0024] In the description of the utility model, it needs to be explained that the directions or position relations of the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" and the like are based on the directions or position relations shown in the drawings, and are only for the convenience of describing the utility model and simplifying the description, and cannot be understood as indicating or implying that the indicated devices or elements must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the utility model. In addition, the terms "first", "second", "third" are only for the purpose of description, and cannot be understood as indicating or implying relative importance.

[0025] In the description of the utility model, it needs to be explained that, unless otherwise explicitly specified and limited, the terms "mounting", "connection", "connection" should be understood broadly, for example, it can be fixedly connected, or it can be detachably connected, or integrally connected; it can be mechanically connected, or it can be electrically connected; it can be directly connected, or it can be indirectly connected through an intermediate medium; it can be the communication inside two elements. For the ordinary skilled in the art, the specific meaning of the above terms in the utility model can be understood according to the specific circumstances.

[0026] Please refer to Figures 1 to 6The utility model discloses a safety belt auxiliary suspension structure applies to the wall of building, and the utility model discloses a safety belt auxiliary suspension structure can provide good safety belt suspension structure for the construction personnel of high altitude operation in combination with the retention hole 301, to improve the safety factor of construction personnel when high altitude operation, effectively guarantee the safety of construction personnel when construction.

[0027] The utility model discloses a safety belt auxiliary suspension structure includes spacing rod 10, and spacing rod 10 is used to set up the retention hole 301 from the through, thereby before the construction personnel carry out high altitude operation, the spacing rod 10 is placed on the concrete outer wall 300, and the subsequent construction such as painting, installation outer porcelain tile etc. operation is facilitated, and one end of spacing rod 10 is provided with first buckle piece 20, and the first buckle piece 20 is provided with first perforated part 201, and first perforated part 201 is used for the hook 50 that is connected with safety belt 40 to set up or is used for connecting external safety rope 400, thereby providing good safety belt 40 suspension structure for the construction personnel of high altitude operation, to improve the safety factor of construction personnel when high altitude operation, effectively guarantee the safety of construction personnel when construction.

[0028] In one embodiment, the length of the spacing rod 10 is much greater than the thickness of the concrete outer wall 300, so that when the construction personnel perform high altitude operation, the spacing rod 10 will not easily fall off the concrete outer wall 300, causing an accident to occur.

[0029] In one embodiment, the spacing rod 10 is a threaded rod structure, and the threaded structure provided on the outer side of the spacing rod 10 is threadedly connected with the retention hole 301 on the concrete outer wall 300, thereby enhancing the fixing stability of the spacing rod 10 on the concrete outer wall 300, effectively avoiding the spacing rod 10 from falling off the concrete outer wall 300, causing an accident to occur, thereby improving the safety factor of the construction personnel when high altitude operation, effectively guaranteeing the safety of the construction personnel when construction.

[0030] In one embodiment, the first buckle piece 20 is integrally formed with the spacing rod 10, thereby improving the stability of the connection between the first buckle piece 20 and the spacing rod 10, and the cross section of the first buckle piece 20 is triangular in structure. The construction personnel sets the hook 50 through the first perforated part 201, and the buckle block 21 forms a supporting effect on the hook 50, thereby providing good safety belt 40 suspension structure for the construction personnel of high altitude operation, to improve the safety factor of construction personnel when high altitude operation, effectively guarantee the safety of construction personnel when construction.

[0031] Alternatively, the first buckle 20 is threadedly connected with one end of the limiting rod 10, the first buckle 20 comprises an integrally-formed connecting block 22 and a buckle block 21, the connecting block 22 is in a cylindrical structure, a threaded groove 202 is arranged in the connecting block 22, one end of the limiting rod 10 is clamped in the threaded groove 202, and the limiting rod 10 is threadedly connected with the connecting block 22; the buckle block 21 is in a triangular structure in section, a first perforated portion 201 is arranged through the buckle block 21, the construction personnel sets the hook 50 through the first perforated portion 201, and the buckle block 21 is used to form a supporting effect on the hook 50, so that a good safety belt 40 suspension structure is provided for the construction personnel in high-altitude operation, the safety coefficient of the construction personnel in high-altitude operation is improved, and the safety of the construction personnel in construction is effectively ensured.

[0032] Embodiment one

[0033] Please refer to Figures 2 to 4 In order to improve the stable fixing effect of the limiting rod 10 on the concrete outer wall 300, the following structure can be used in the embodiment to solve the problem.

[0034] The other end of the limiting rod 10 is provided with a threaded portion 11, a nut member 60 is connected on the threaded portion 11, the nut member 60 is sleeved on the threaded portion 11, so that the threaded connection with the limiting rod 10 is realized, after the limiting rod 10 passes through the retention hole 301 of the concrete outer wall 300, the threaded portion 11 protrudes out of the retention hole 301, the external nut member 60 is connected with the threaded portion 11, so that the limiting rod 10 is stably fixed on the concrete outer wall 300, the situation that the limiting rod 10 falls off from the concrete outer wall 300 and causes an accident is effectively avoided, the safety coefficient of the construction personnel in high-altitude operation is improved, and the safety of the construction personnel in construction is effectively ensured.

[0035] Specifically, the nut member 60 comprises a nut block 61, the nut block 61 is threadedly connected with the limiting rod 10, when the nut member 60 limits the limiting rod 10 on the concrete outer wall 300, the swing of the safety belt 40 will apply force to the limiting rod 10 in the construction process of the construction personnel, the limiting rod 10 transmits the force to the concrete outer wall 300 and the nut member 60, since the nut member 60 is fixed with the limiting rod 10, the nut member 60 provides a reaction force to the limiting rod 10, the reaction force also acts on the outer wall, the sectional area of the nut block 61 is small, and a large pressure is provided to the concrete outer wall 300, so that the concrete outer wall 300 is slightly damaged.

[0036] In order to reduce the slight damage of the nut member 60 to the concrete outer wall 300, the following structure is also used in the utility model to solve the problem.

[0037] The nut piece 60 further comprises a pad 62, the nut block 61 and the pad 62 are integrally formed, the nut block 61 and the pad 62 are both threadedly connected with the limiting rod 10, the cross-sectional area of the pad 62 is larger than that of the nut block 61, when the nut piece 60 limits the limiting rod 10 on the concrete outer wall 300, the swing of the safety belt 40 will apply force to the limiting rod 10 during the construction process of the construction personnel, the limiting rod 10 transmits the force to the concrete outer wall 300 and the nut piece 60, since the nut piece 60 is fixed with the limiting rod 10, the nut piece 60 provides a counterforce to the limiting rod 10, the counterforce acts on the outer wall, since the pad 62 increases the contact area between the nut piece 60 and the concrete outer wall 300, the pressure of the nut piece 60 on the concrete outer wall 300 is reduced, thereby reducing the damage of the nut piece 60 to the concrete outer wall 300.

[0038] Embodiment two

[0039] Please refer to Figure 5 In order to improve the stable fixing effect of the limiting rod 10 on the concrete outer wall 300, the following structure can also be used in this embodiment to solve the problem.

[0040] The other end of the limiting rod 10 is provided with a threaded part 11, the threaded part 11 is connected with a limiting sleeve rod 70, one end of the limiting sleeve rod 70 is provided with a second buckle piece 71, the second buckle piece 71 is provided with a second perforated part 701, the second perforated part 701 is used for the hook 50 to pass through, thereby providing a good safety belt 40 suspension structure for the construction personnel from the other side of the concrete outer wall 300, to improve the safety factor of the construction personnel during high-altitude operation, and effectively ensure the safety of the construction personnel during construction.

[0041] Specifically, the limiting sleeve rod 70 is provided with a connecting sleeve rod 72, the connecting sleeve rod 72 is integrally formed with the second buckle piece 71 as the structure of the limiting rod 10, the connecting sleeve rod 72 is sleeved on the threaded part 11 of the other end of the limiting rod 10, and is close to the concrete outer wall 300, thereby stably fixing the limiting rod 10 on the concrete outer wall 300, effectively avoiding the limiting rod 10 from falling off the concrete outer wall 300 to cause an accident, thereby improving the safety factor of the construction personnel during high-altitude operation, and effectively ensuring the safety of the construction personnel during construction.

[0042] Embodiment three

[0043] Please refer to Figure 6 The safety belt auxiliary suspension structure in the above-mentioned embodiment one or embodiment two can be applied in a safety belt auxiliary suspension combination, the safety belt auxiliary suspension combination comprises a first safety belt auxiliary suspension structure 100, a second safety belt auxiliary suspension structure 200 and a safety rope 400.

[0044] Please refer toFigure 3 and Figure 4 The first safety belt auxiliary hanging structure and the second safety belt auxiliary hanging structure both comprise a limiting rod 10, the limiting rod 10 is used for being arranged through the retaining hole 301, so that the limiting rod 10 is arranged on the concrete outer wall 300 before a construction worker performs high-altitude operation, subsequent operations such as painting and installing outer ceramic tiles are facilitated, one end of the limiting rod 10 is provided with a first buckle 20, a first perforated part 201 is formed in the first buckle 20, the first perforated part 201 is used for connecting a safety rope 400, so that a good safety belt 40 hanging structure is provided for the construction worker performing high-altitude operation.

[0045] Specifically, the safety rope 400 is provided with two hanging buckles 401 at two ends respectively, the two hanging buckles 401 are connected with the first perforated part 201 of the first buckle 20 of the first safety belt auxiliary hanging structure 100 and the second safety belt auxiliary hanging structure 200 respectively, so that the safety rope 400 is suspended between the first safety belt auxiliary hanging structure 100 and the second safety belt auxiliary hanging structure 200; the safety rope 400 is used for hanging a hook 50 thereon, so that a good safety belt 40 hanging structure is provided for the construction worker performing high-altitude operation, the safety coefficient of the construction worker during high-altitude operation is improved, and the safety of the construction worker during construction is effectively ensured; in the embodiment, the first safety belt auxiliary hanging structure 100 and the second safety belt auxiliary hanging structure 200 are arranged at the same height, so that the extension direction of the safety rope 400 is horizontally arranged, so that the construction worker performing high-altitude operation has a larger operation space when moving along the horizontal direction outside the concrete outer wall 300, and the safety of the construction worker during construction is effectively ensured.

[0046] The first safety belt auxiliary hanging structure 100 and the second safety belt auxiliary hanging structure 200 are the same as the safety belt auxiliary hanging structure in the first embodiment or the second embodiment.

[0047] Taking the first embodiment as an example, when the utility model is used, after the limiting rod 10 is arranged through the suitable retaining hole 301 on the concrete outer wall 300, the other end of the limiting rod 10 protruding out of the concrete outer wall 300 is connected with the nut 60, so that the limiting rod 10 is stably fixed on the concrete outer wall 300, the hook 50 at one end of the safety rope 400 worn on the construction worker is connected with the first buckle 20 arranged at one end of the limiting rod 10, specifically, the hook 50 at one end of the safety rope 400 worn on the construction worker is hung in the first perforated part 201, so that a good safety belt 40 hanging structure is provided for the construction worker performing high-altitude operation, the safety coefficient of the construction worker during high-altitude operation is improved, and the safety of the construction worker during construction is effectively ensured.

[0048] In summary, the utility model discloses a safety belt auxiliary suspension structure through set up limiting rod 10 and first buckle piece 20, utilize limiting rod 10 after the stagnation hole 301 on the concrete outer wall 300 is penetrated, cooperate with the construction personnel and utilize the hook 50 of safety rope 400 one end worn on the body and hang in the first perforated portion 201, thereby provide good safety belt 40 suspension structure for the construction personnel of high altitude operation, improve the safety factor of construction personnel when high altitude operation, effectively guarantee the safety of construction personnel when construction.

[0049] The above-mentioned embodiments only express several implementation manners of the utility model, and the description is more specific and detailed, but it cannot be understood as the limitation of the scope of the utility model. It should be pointed out that for ordinary skilled persons in the art, several modifications and improvements can be made without departing from the concept of the utility model, and these all belong to the protection scope of the utility model. Therefore, the protection scope of the utility model should be subject to the appended claims.

Claims

1. A seat belt assist suspension structure, characterized by: The limiting rod is a threaded rod structure, and is screwed with the retaining hole on the concrete outer wall through the thread structure arranged on the outer side of the limiting rod. The first buckle piece is integrally formed with the limiting rod.

2. The belt assist suspension structure of claim 1, wherein: The first buckle piece is threadedly connected with one end of the limiting rod, and comprises an integrally formed connecting block and buckle block.

3. The belt assist suspension structure of claim 1, wherein: The other end of the limiting rod is provided with a threaded portion, and the threaded portion is connected with a nut piece.

4. The belt assist suspension structure of claim 1, wherein: The nut piece comprises a nut block, and the nut block is threadedly connected with the limiting rod.

5. The belt assist suspension structure of claim 1, wherein: The nut piece further comprises a pad block, and the nut block and the pad block are integrally formed.

6. A belt assist suspension structure according to claim 5, wherein: The limiting sleeve rod is provided with a connecting sleeve rod, which is integrally formed with the second buckle piece as the limiting rod.

7. A belt assist suspension structure according to claim 6, wherein: The first safety belt auxiliary hanging structure and the second safety belt auxiliary hanging structure each comprise a limiting rod, which is arranged through a retaining hole.

8. The belt assist suspension structure of claim 1, wherein: The first buckle piece is provided at one end of the limiting rod, and a first perforated portion is arranged on the first buckle piece.

9. A seat belt assist suspension assembly comprising: The other end of the limiting rod is provided with a threaded portion, and the threaded portion is connected with a nut piece. The nut piece comprises a nut block, and the nut block is threadedly connected with the limiting rod. The nut piece further comprises a pad block, and the nut block and the pad block are integrally formed. The limiting sleeve rod is provided with a connecting sleeve rod, which is integrally formed with the second buckle piece as the limiting rod. The safety rope is provided with a hanging buckle at each end, and the two hanging buckles are respectively connected with the first perforated portions of the first buckle pieces of the first safety belt auxiliary hanging structure and the second safety belt auxiliary hanging structure. The safety rope is used for hanging a hook on a safety belt.