Bridge hanging basket construction suspension equipment
By adopting the design of vertical support columns and irregularly shaped limiting plates in the suspension equipment for bridge hanging basket construction, the problem of inconvenient height adjustment of the bearing platform is solved, realizing convenient installation and improved stability, and adapting to the needs of different construction stages.
Patent Information
- Application Number
- CN202520032505.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-07
- Publication Date
- 2025-12-16
- Estimated Expiration
- 2035-01-07
AI Technical Summary
Among the existing bridge hanging basket construction suspension equipment, the height adjustment of the bearing platform is inconvenient and the installation and dismantling operations are cumbersome, making it difficult to meet the diverse needs of different construction stages.
The design incorporates multiple vertical support columns, fixed connecting plates, suspension mechanisms, platform support rods, and irregularly shaped limiting plates. The platform support rods are easily installed by inserting the irregularly shaped limiting plates into rectangular through holes, forming a stable load-bearing platform in combination with the pedals and protective netting.
It enables convenient installation and disassembly of the support platform, improves construction efficiency, and enhances the stability and safety of the platform.
Smart Images

Figure CN223675182U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The application belongs to the technical field of bridge engineering, and specifically relates to a bridge hanging basket construction suspension equipment. BACKGROUND
[0002] The hanging basket construction suspension equipment is an auxiliary equipment specially used for high-altitude construction of bridges, buildings and the like, and its main function is to safely suspend construction materials and workers at a high-altitude working surface. The equipment is generally composed of a support frame, a hanging basket, a hoisting device and a safety protection device, etc. The support frame is usually made of a high-strength steel structure to ensure that it can bear corresponding weight and load during construction. The hanging basket is a bearing platform, on which workers perform construction, and is usually equipped with protective railings to improve safety.
[0003] For example, the utility model patent with the announcement number CN216765639U discloses a bridge hanging basket construction suspension device, which belongs to the technical field of bridge engineering, and aims to solve the problem that the existing hanging basket suspension device requires construction personnel to work on it, and the construction personnel may slip and climb unstably when climbing the hanging basket suspension device, resulting in the construction personnel falling from a high place and being injured.
[0004] However, it is found in actual use that, in the existing hanging basket structure, a construction bearing platform is usually arranged at the bottom of the suspender, which aims to provide a working space for construction personnel to carry out bridge construction work.
[0005] However, the existing construction bearing platform is usually directly fixed to the bottom cross beam by bolts, which makes it extremely inconvenient to adjust the height of the platform, and the installation and disassembly process is complicated, which consumes a lot of manpower and time cost, and it is difficult to efficiently adapt to the diversified requirements of the height of the bearing platform and the convenience of installation and disassembly at different construction stages. Therefore, a bridge hanging basket construction suspension equipment is provided. UTILITY MODEL CONTENTS
[0006] The purpose of the present application is to solve the above-mentioned problems, and to provide a bridge hanging basket construction suspension equipment.
[0007] The technical scheme adopted by the present application is as follows: a bridge hanging basket construction suspension equipment, comprising a plurality of vertical support columns, a fixed connection plate is installed on the front side of each of the plurality of vertical support columns, a suspension mechanism connected with the vertical support column is arranged on the top surface of the vertical support column, two rectangular through holes are arranged on the front side of the vertical support column above the fixed connection plate, a platform support rod is arranged on the front side of the fixed connection plate, two special-shaped limiting plates corresponding to the rectangular through holes are fixedly installed on the top surface of the platform support rod, the special-shaped limiting plates are inserted into the rectangular through holes, and a footboard is fixedly installed on one side of the platform support rod.
[0008] In a preferred implementation form, the suspension mechanism comprises a boom crossbeam, a boom I, the top surface of the vertical support column is provided with the boom crossbeam, the top surface of the boom crossbeam is provided with the boom I fixedly installed through the boom crossbeam, and the bottom end of the boom I is fixed to the top surface of the vertical support column.
[0009] In a preferred implementation form, the top surface of the platform support rod is fixedly installed with a connecting vertical rod, the top surface of the boom crossbeam is fixedly installed with a boom II through the boom crossbeam, and the bottom end of the boom II is fixed to the top end of the connecting vertical rod.
[0010] In a preferred implementation form, one side of the connecting vertical rod is fixedly installed with a protective net plate.
[0011] In a preferred implementation form, the bottom end of the vertical support column is fixedly installed with a connecting beam, the side of the connecting beam is symmetrically fixedly installed with a plurality of fixed plates, and the top surface of each of the plurality of fixed plates is provided with a fixed hole.
[0012] In a preferred implementation form, the inside of the connecting beam is provided with an auxiliary support rod, and the top end of the auxiliary support rod is in contact with the bottom surface of the platform support rod.
[0013] In summary, due to the adoption of the above technical scheme, the application has the following beneficial effects:
[0014] 1. In the application, the construction personnel first inserts the special-shaped limiting plate into the rectangular through hole, and after the special-shaped limiting plate is inserted into the rectangular through hole, the platform support rod moves downward, so that the top of the fixed connecting plate can be inserted into the bottom of the special-shaped limiting plate, thereby realizing the clamping connection of the special-shaped limiting plate and the fixed connecting plate, providing convenience for the installation of the platform support rod. The platform support rod, the pedal and the protective net plate are combined into an integral bearing platform, and the bearing platform is installed by the cooperation of the plurality of special-shaped limiting plates, the rectangular through holes and the fixed connecting plates, so that the installation and disassembly operation of the bearing platform is relatively convenient. BRIEF DESCRIPTION OF DRAWINGS
[0015] Figure 1 The overall structure of the application is shown in the figure;
[0016] Figure 2 The overall structure of the application is shown in the figure; Figure 1 The enlarged structure of A in the application is shown in the figure;
[0017] Figure 3 The vertical support column structure of the application is shown in the figure.
[0018] Marked in the figure: 1, vertical support column; 2, fixed connecting plate; 3, suspension mechanism; 4, rectangular through hole; 5, platform support rod; 6, special-shaped limiting plate; 7, pedal; 8, boom cross beam; 9, boom one; 10, connecting vertical rod; 11, boom two; 12, protective net plate; 13, connecting beam; 14, fixed plate; 15, auxiliary support rod. DETAILED DESCRIPTION
[0019] To make the purpose, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be described clearly and completely below in conjunction with the embodiments of the present application. Obviously, the described embodiments are some of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the scope of protection of the present application.
[0020] Reference Figure 1 , Figure 2 and Figure 3 , a bridge hanging basket construction suspension equipment, comprising a plurality of vertical support columns 1, a plurality of vertical support columns 1 are provided with fixed connecting plates 2 on the front side, and the top surface of the vertical support column 1 is provided with a suspension mechanism 3 connected thereto; by providing a plurality of vertical support columns 1, the overall strength of the hanging basket can be effectively maintained, thereby providing convenience for the support and fixation of the bearing platform, and the provision of a plurality of fixed connecting plates 2 enables the bearing platform to be installed at a suitable height. In addition, the presence of the suspension mechanism 3 facilitates the suspension operation of the vertical support column 1, which is conducive to subsequent workers to carry out construction work.
[0021] Reference Figure 1 , Figure 2 , the suspension mechanism 3 comprises a boom cross beam 8 and a boom one 9, the top surface of the vertical support column 1 is provided with the boom cross beam 8, the top surface of the boom cross beam 8 is provided with the boom one 9 fixedly installed, and the bottom end of the boom one 9 is fixed with the top surface of the vertical support column 1; the bottom surface of the boom cross beam 8 is fixed with the external hanging basket diamond frame, which can support the boom cross beam 8, and by providing the boom one 9, the vertical support column 1 can be suspended and supported, thereby improving the stability.
[0022] Reference Figure 1 , Figure 2 and Figure 3The front side of the vertical support column 1 is provided with two rectangular through holes 4 above the fixed connecting plate 2, the front side of the fixed connecting plate 2 is provided with a platform support rod 5, the top surface of the platform support rod 5 is fixedly installed with two special-shaped limiting plates 6 corresponding to the rectangular through holes 4, the special-shaped limiting plates 6 are inserted into the inside of the rectangular through holes 4, and one side of the platform support rod 5 is fixedly installed with a footboard 7.
[0023] Reference Figure 1 The top surface of the platform support rod 5 is fixedly installed with a connecting vertical rod 10, the top surface of the boom cross beam 8 is fixedly installed with a boom two 11, the bottom end of the boom two 11 is fixed with the top end of the connecting vertical rod 10, and one side of the connecting vertical rod 10 is fixedly installed with a protective net plate 12.
[0024] Reference Figure 1 、 Figure 3 The bottom end of the vertical support column 1 is fixedly installed with a connecting beam 13, a plurality of fixed plates 14 are fixedly installed on the side of the connecting beam 13 in a symmetrical manner, and the top surface of each of the plurality of fixed plates 14 is provided with a fixed hole.
[0025] Reference Figure 1 The inside of the connecting beam 13 is provided with an auxiliary support rod 15, and the top end of the auxiliary support rod 15 is in contact with the bottom surface of the platform support rod 5.
[0026] The implementation principle of the embodiment of the bridge hanging basket construction suspension equipment is as follows: the construction personnel first install the suspender cross beam 8 with the external diamond-shaped frame, so that the device and the diamond-shaped frame jointly form a hanging basket whole, and the multiple vertical support columns 1 can be suspended at the bridge construction connection through the suspension mechanism 3, when the bearing platform installation work is to be carried out, the personnel can first insert the two special-shaped limiting plates 6 installed on the top surface of the platform support rod 5 into the rectangular through hole 4, after the special-shaped limiting plate 6 is inserted into the rectangular through hole 4, the platform support rod 5 will move downward, so that the top of the fixed connecting plate 2 can be inserted into the bottom of the special-shaped limiting plate 6, so as to realize the clamping of the special-shaped limiting plate 6 and the fixed connecting plate 2, and provide convenience for the installation of the platform support rod 5, so that the personnel can walk on the platform support rod 5 and the step plate 7 to implement the construction operation;
[0027] The platform support rod 5, the step plate 7 and the protective net plate 12 of the device are combined into a whole bearing platform, and the bearing platform is installed by the cooperation of the multiple special-shaped limiting plates 6, the rectangular through hole 4 and the fixed connecting plate 2, so that the installation and disassembly operation of the bearing platform is relatively convenient, at the same time, the auxiliary support rod 15 can assist the support of the platform support rod 5, and further enhance the stability of the bearing platform.
[0028] The above embodiments are only used to illustrate the technical solutions of the application, and not to limit them; although the application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that they can still modify the technical solutions recorded in the foregoing embodiments, or make equivalent replacement for part of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the application.
Claims
1. A suspension device for bridge basket construction, comprising a plurality of vertical support columns (1), characterized in that: The front side of the plurality of vertical support columns (1) is provided with a fixed connecting plate (2), the top surface of the vertical support column (1) is provided with a suspension mechanism (3) connected thereto, two rectangular through holes (4) are formed in the front side of the vertical support column (1) above the fixed connecting plate (2), the front side of the fixed connecting plate (2) is provided with a platform support rod (5), the top surface of the platform support rod (5) is fixedly provided with two special-shaped limiting plates (6) corresponding to the rectangular through holes (4), the special-shaped limiting plates (6) are inserted into the rectangular through holes (4), and one side of the platform support rod (5) is fixedly provided with a pedal (7).
2. The bridge form traveler construction suspension apparatus of claim 1, wherein: The suspension mechanism (3) comprises a boom cross beam (8) and a boom one (9), the top surface of the vertical support column (1) is provided with the boom cross beam (8), the top surface of the boom cross beam (8) is provided with the boom one (9) fixedly arranged through the boom cross beam (8), and the bottom end of the boom one (9) is fixed to the top surface of the vertical support column (1).
3. The bridge form traveler construction suspension apparatus of claim 2, wherein: The top surface of the platform support rod (5) is fixedly provided with a connecting vertical rod (10), the top surface of the boom cross beam (8) is provided with a boom two (11) fixedly arranged through the boom cross beam (8), and the bottom end of the boom two (11) is fixed to the top end of the connecting vertical rod (10).
4. The bridge basket construction suspension apparatus of claim 3, wherein: One side of the connecting vertical rod (10) is fixedly provided with a protective net plate (12).
5. The bridge basket construction suspension apparatus of claim 1, wherein: The bottom end of the vertical support column (1) is fixedly provided with a connecting beam (13), a plurality of fixed plates (14) are symmetrically fixed to the side of the connecting beam (13), and the top surface of each fixed plate (14) is provided with a fixed hole.
6. The bridge basket construction suspension apparatus of claim 5, wherein: The inside of the connecting beam (13) is provided with an auxiliary support rod (15), and the top end of the auxiliary support rod (15) is in contact with the bottom surface of the platform support rod (5).