Climbing frame with safety protection for building construction

By introducing safety protection components such as threaded pipes and safety ropes into the climbing scaffolding for construction, the problem of poor safety performance of existing climbing scaffolding has been solved, and a comprehensive safety protection effect has been achieved.

CN223675796UActive Publication Date: 2025-12-16FOSHAN NANHAI GUANGZHI PRECISION MACHINERY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423138094.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-19
Publication Date
2025-12-16
Estimated Expiration
2034-12-19

AI Technical Summary

Technical Problem

The existing construction scaffolding lacks safety protection components, resulting in poor safety performance and making it easy for workers to have accidents.

Method used

A climbing scaffold with safety protection was designed, including components such as a right-side support, a left-side support, cross reinforcement bars, a ladder, a load-bearing frame, an installation pipe, a threaded pipe, a safety rope, and a top protective plate. The threaded connection and detachable structure provide multi-layered safety protection for construction workers.

Benefits of technology

It improves the safety of construction workers, reduces safety hazards during construction, and provides comprehensive safety protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223675796U_ABST
    Figure CN223675796U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, and discloses a climbing frame with safety protection for building construction, which comprises a right side support, a left side support and an internal thread pipe, crossed reinforcing rods are arranged between the right side support and the left side support in a staggered manner, and the side edges of the right side support and the left side support are provided with climbing ladders. A bearing frame is clamped above the right side support and the left side support, right side mounting pipes are inserted into the right side support, left side mounting pipes are inserted into the left side support, connecting rods are arranged between the right side mounting pipes and the left side mounting pipes, and the connecting rods are movably sleeved with first movable sleeves; and an internal thread connecting sleeve is fixed to the first movable sleeve, threaded rods are in threaded connection with the interiors of the two sides of the internal thread pipe correspondingly, and mounting connectors in threaded connection with the internal thread connecting sleeve are fixed to the right sides of the threaded rods, so that safety protection can be better conducted on constructors conveniently, and potential safety hazards do not exist easily when the constructors conduct construction operation.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of building construction, specifically is a building construction is with the safety protection's climbing frame. BACKGROUND

[0002] The building construction climbing frame can be divided into the steel pipe frame of erection and the scaffold of temporary building construction, and the scaffold refers to various supports that are erected at the construction site for workers to operate and solve vertical and horizontal transportation.

[0003] The scaffold in the prior art does not have a safety protection component to protect workers, and the safety protection measures are few, so that the safety performance of the scaffold is poor, accidents during work of workers are prone to occur, and the scaffold cannot meet the current work requirements.

[0004] Therefore, the technical scheme provides the building construction climbing frame with safety protection, which can better solve the above problems. UTILITY MODEL CONTENTS

[0005] The utility model discloses a building construction climbing frame with safety protection, including right side support, left side support and internal thread pipe, staggeredly arranged with cross reinforcing bars between right side support and left side support, and the side of right side support and left side support is provided with the climbing ladder, and the upper portion of right side support and left side support is clamped with the bearing frame.

[0006] The right side mounting pipe is inserted on the right side support, the left side mounting pipe is inserted on the left side support, a group of right side mounting pipes and a group of left side mounting pipes are all provided with connecting rods, and the movable sleeve one is movably arranged on the connecting rod, the internal thread connecting sleeve is fixed on the movable sleeve one, the screw rod is screw connected with the internal thread connecting sleeve on the both sides of the internal thread pipe, and the mounting connector is screw connected with the internal thread connecting sleeve on the right side of the screw rod, the movable sleeve two is movably arranged on the internal thread pipe, and the safety rope that is used in cooperation with the safety belt on the worker's body is fixed on the movable sleeve two.

[0007] The top protection plate is detachably installed on the right side mounting pipe and the left side mounting pipe.

[0008] In a preferred embodiment, the right side support and the cross reinforcing bar are provided with universal wheels below.

[0009] In a preferred embodiment, the bearing frame is provided with semicircular clamping hooks on both sides, and the clamping hooks are clamped on the upper horizontal rods of the right side support and the left side support.

[0010] In a preferred embodiment, the right mounting pipe and the bottom end of the positioning column one are fixed with the positioning column one, and the positioning column one is inserted into the right support and the left support from above.

[0011] In a preferred embodiment, the threaded connection between the mounting joint and the internally threaded connecting sleeve is a threaded column, and the threaded column is screwed into the threaded groove in the internally threaded connecting sleeve.

[0012] In a preferred embodiment, the bottom of the top protection plate is fixed with the positioning column two, and the positioning column two is inserted into the right mounting pipe and the left mounting pipe from above.

[0013] In a preferred embodiment, the top protection plate is formed by two protection plates hinged together to form an integral top protection plate.

[0014] In summary, due to the adoption of the above technical scheme, the present application has the advantages of: better safety protection for the construction personnel, and no safety hazards during construction operation.

[0015] 1. In the present application, the positioning column two is inserted into the right mounting pipe and the left mounting pipe from above after the top protection plate is opened, and the installation of the top protection plate is completed at this time, and the top protection plate can protect the construction personnel from above, and there are no safety hazards.

[0016] 2. In the present application, the threaded rod is moved out of the internally threaded pipe by rotating the mounting joint, and the mounting joint is screwed into the internally threaded connecting sleeve, and the installation and positioning of the internally threaded pipe are completed at this time, and the safety rope and the safety belt on the construction personnel are bound together, and the construction personnel are installed and protected at this time, and the movable sleeve one can move forward and backward on the connecting rod, and the movable sleeve two can move left and right on the internally threaded pipe, and the construction personnel can work without being affected. BRIEF DESCRIPTION OF DRAWINGS

[0017] Figure 1 It is a structure schematic view of the first state of the present application.

[0018] Figure 2 It is a structure schematic view of the second state of the present application.

[0019] Figure 3 It is a structure schematic view of the second state of the present application. Figure 2 It is an enlarged schematic view of the A area structure of the present application.

[0020] Marked in the figure: 1-right side support; 2-left side support; 3-intersecting reinforcing rod; 4-omniwheel; 5-climbing ladder; 6-bearing frame; 7-right side mounting pipe; 8-left side mounting pipe; 9-positioning column I; 10-connecting rod; 11-movable sleeve I; 12-internal thread connecting sleeve; 13-internal thread pipe; 14-threaded rod; 15-mounting joint; 16-movable sleeve II; 17-safety rope; 18-top protection plate; 19-positioning column II. DETAILED DESCRIPTION

[0021] To make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor belong to the protection scope of the utility model.

[0022] The technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the embodiments of the utility model. Figures 1-3 The building construction climbing frame with safety protection in the embodiments of the utility model will be described in detail.

[0023] Referring to Figures 1-2 As shown in the figure, the building construction climbing frame with safety protection comprises right side support 1, left side support 2 and internal thread pipe 13, intersecting reinforcing rods 3 are arranged between right side support 1 and left side support 2, omniwheels 4 are arranged below right side support 1 and intersecting reinforcing rods 3, climbing ladders 5 are arranged on the side edges of right side support 1 and left side support 2, bearing frames 6 are clamped on the upper sides of right side support 1 and left side support 2, semicircular clamping hooks are arranged on the two sides of bearing frame 6, and the clamping hooks are clamped on the upper crossbars of right side support 1 and left side support 2.

[0024] Referring to Figures 1-3 As shown in the figure, right side mounting pipes 7 are inserted into right side support 1, left side mounting pipes 8 are inserted into left side support 2, positioning columns I 9 are fixed to the bottom ends of right side mounting pipes 7 and positioning columns I 9, positioning columns I 9 are inserted into right side support 1 and left side support 2, connecting rods 10 are arranged between one group of right side mounting pipes 7 and one group of left side mounting pipes 8, movable sleeves I 11 are movably sleeved on connecting rods 10, internal thread connecting sleeves 12 are fixed to movable sleeves I 11, threaded rods 14 are threadedly connected to the interiors of internal thread pipes 13 on the two sides, mounting joints 15 threadedly connected to internal thread connecting sleeves 12 are fixed to the right sides of threaded rods 14, the threaded connection between mounting joints 15 and internal thread connecting sleeves 12 is a threaded column, the threaded column is threadedly connected in a threaded groove in the interior of internal thread connecting sleeve 12, movable sleeves II 16 are movably sleeved on internal thread pipes 13, and safety ropes 17 used in cooperation with safety belts on construction workers are fixed to movable sleeves II 16.

[0025] Reference Figures 1-2 As shown, the right mounting pipe 7 and the left mounting pipe 8 are detachably mounted with the top guard plate 18, the top guard plate 18 is hinged together by two guard plates to form an integral top guard plate, the bottom of the top guard plate 18 is fixed with the positioning column two 19 around, and the positioning column two 19 is inserted into the inside of the right mounting pipe 7 and the left mounting pipe 8.

[0026] The above-mentioned overall technical scheme can protect the construction above the constructor and can protect the constructor himself, through double protection, the safety of the constructor during construction can be better guaranteed, and safety hazards are not easy to exist.

[0027] The application has the advantages that the constructor can be better protected, and safety hazards are not easy to exist during construction operation.

[0028] The building construction climbing frame in the prior art is diversified, for example, a building construction climbing frame built by hand and a smart adjusting climbing frame. The building construction climbing frame built by hand is widely used in building construction, has good stability, although it needs to be assembled and wastes manpower, the smart adjusting climbing frame can ascend, descend, has electric control, sensors and a total electric box, and can be quickly lifted, but has limited use range, therefore, the two climbing frames can be selected and used according to the building construction demand in the prior art, and the technical scheme mainly improves the safety protection of the building construction climbing frame built by hand.

[0029] Working principle: when the constructor is protected, the positioning column one 9 fixed at the bottom of the right mounting pipe 7 and the left mounting pipe 8 is inserted into the inside of the right support 1 and the left support 2, the position of the right mounting pipe 7 and the left mounting pipe 8 is positioned, the top guard plate 18 is opened, the positioning column two 19 is inserted into the inside of the right mounting pipe 7 and the left mounting pipe 8, the installation of the top guard plate 18 is completed, the top guard plate 18 can protect the constructor above, and safety hazards are not easy to exist.

[0030] By rotating the mounting joint 15, the threaded rod 14 is moved out of the inside of the inner threaded pipe 13, the mounting joint 15 is threadedly connected in the inner threaded connecting sleeve 12, the installation and positioning of the inner threaded pipe 13 are completed, the safety rope 17 is bound together with the safety belt on the constructor, the constructor is installed and protected, the movable sleeve one 11 can move forward and backward on the connecting rod 10, the movable sleeve two 16 can move left and right on the inner threaded pipe 13, and the constructor is not easy to be affected to work.

[0031] The above-described embodiments only express several implementation manners of the utility model, the description is more specific and detailed, but can not therefore be understood as the limitation of the utility model patent range. It should be pointed out that for ordinary skilled person in the art, without departing from the utility model concept, several modifications and improvements can be made, which belong to the protection range of the utility model. Therefore, the protection range of the utility model patent should be subject to the appended claims.

Claims

1. A safety-protected climbing frame for building construction, comprising a right side support (1), a left side support (2) and an internally threaded pipe (13), characterized in that: The right side support (1) and the left side support (2) are staggered with cross reinforcing rods (3), and the side edges of the right side support (1) and the left side support (2) are provided with climbing ladders (5), and the upper parts of the right side support (1) and the left side support (2) are clamped with bearing frames (6), The right side support (1) is inserted with right side mounting pipes (7), and the left side support (2) is inserted with left side mounting pipes (8), a group of the right side mounting pipes (7) and a group of the left side mounting pipes (8) are provided with connecting rods (10), and the connecting rods (10) are movably sleeved with movable sleeves (11), the movable sleeves (11) are fixed with internally threaded connecting sleeves (12), the internally threaded pipes (13) are threadedly connected with threaded rods (14) on both sides, and the threaded rods (14) are fixed with mounting joints (15) which are threadedly connected with the internally threaded connecting sleeves (12), the internally threaded pipes (13) are movably sleeved with movable sleeves (16), and the movable sleeves (16) are fixed with safety ropes (17) which are used in cooperation with safety belts on the construction workers. The right side mounting pipes (7) and the left side mounting pipes (8) are detachably mounted with top protection plates (18).

2. The climbing frame with safety protection for building construction of claim 1, wherein: The right side support (1) and the cross reinforcing rods (3) are provided with universal wheels (4) below.

3. The climbing frame with safety protection for building construction of claim 1, wherein: Both sides of the bearing frame (6) are provided with semicircular clamps, and the clamps are clamped on the upper cross bars of the right side support (1) and the left side support (2).

4. The climbing frame with safety protection for building construction of claim 1, wherein: The bottom ends of the right side mounting pipes (7) and the positioning columns (9) are fixed with positioning columns (9), and the positioning columns (9) are inserted into the right side support (1) and the left side support (2) above.

5. The climbing frame with safety protection for building construction of claim 1, wherein: The threaded connection between the mounting joint (15) and the internally threaded connecting sleeve (12) is a threaded column, and the threaded column is threadedly connected in the threaded groove in the internally threaded connecting sleeve (12).

6. The climbing form with safety protection for building construction of claim 1, wherein: The bottom of the top protection plate (18) is fixed with positioning columns (19) around, and the positioning columns (19) are inserted into the right side mounting pipes (7) and the left side mounting pipes (8) above.

7. The climbing form with safety protection for building construction of claim 1, wherein: The top protection plate (18) is formed by two protection plates hinged together to form a whole top protection plate.