High-strength steel bar rapid binding tool for building construction

By introducing a restraint mechanism into the high-strength steel bar quick-tying tool, the safety hazard of the tool falling is solved, and a more stable grip and improved safety are achieved.

CN223724189UActive Publication Date: 2025-12-26HUNAN HENGSHENG CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520126145.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-20
Publication Date
2025-12-26
Estimated Expiration
2035-01-20

AI Technical Summary

Technical Problem

Existing high-strength steel bar quick-binding tools used in construction are prone to falling from workers' hands after prolonged use, posing a safety hazard, especially in high-altitude operations or densely populated environments where they may injure others.

Method used

A high-strength rebar quick-tying tool was designed, which includes a sleeve, a rotating column, a hook, a pushing plate, a spring, and a restraining mechanism. The restraining mechanism restrains the worker's hand to ensure that the tool is firmly fixed in the hand and prevents it from falling.

Benefits of technology

It improves safety during use, prevents tools from falling and injuring others, and enhances the stability and safety of workers holding the tool.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223724189U_ABST
    Figure CN223724189U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, in particular to a high-strength steel bar fast binding tool for building construction, which comprises a sleeve, a rotating column is rotatably connected in the sleeve, a hook is fixedly connected to the top end of the rotating column, a pushing piece is fixedly connected to the bottom end of the rotating column, and a first spring is sleeved on the outer side of the rotating column. A binding mechanism used for binding the palm is arranged on the outer side of the sleeve, the binding mechanism comprises a holding belt, a fixing seat and two connecting rods, the holding belt is arranged on the outer side of the sleeve, the top end of the fixing seat is fixedly connected to the bottom end of the sleeve, and the outer sides of the two connecting rods are slidably connected to the interior of the fixing seat. Therefore, the high-strength steel bar rapid binding tool is firmly fixed to the palm of a worker, the worker can better hold the binding tool, the situation that the rapid binding tool falls off from the hand of the worker and hurts other workers is avoided, and the use safety is improved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to building construction technical field, concretely is a kind of high-strength steel bar fast binding tool for building construction. BACKGROUND

[0002] High-strength steel bar fast binding tool for building construction generally refers to mechanical equipment specially used for fast binding high-strength steel bars, especially in some large building construction projects, such tools can greatly improve the efficiency and quality of steel bar binding.

[0003] In the prior art, after workers use high-strength steel bar fast binding tool for building construction to bind steel bars for a long time, long-time single holding operation will quickly consume the gripping force of workers' wrists, workers cannot hold the binding tool well, causing the fast binding tool to fall from the workers' hands, in high-altitude operation or densely populated construction site environment, the falling tool may hit other workers' feet, heads and other parts, causing serious injuries.

[0004] Therefore, we propose a high-strength steel bar fast binding tool for building construction. UTILITY MODEL CONTENT

[0005] The utility model aims to provide a high-strength steel bar fast binding tool for building construction to solve the problems raised in the above background.

[0006] To achieve the above purpose, the utility model provides the following technical scheme: a high-strength steel bar fast binding tool for building construction, comprising a sleeve, a rotating column is rotatably connected inside the sleeve, a hook is fixedly connected to the top end of the rotating column, a push piece is fixedly connected to the bottom end of the rotating column, a spring one is sleeved outside the rotating column, and a binding mechanism for binding the palm is arranged outside the sleeve.

[0007] The binding mechanism comprises a grip belt, a fixed seat, two connecting rods, the grip belt is arranged outside the sleeve, the top end of the fixed seat is fixedly connected to the bottom end of the sleeve, the two connecting rods are slidably connected inside the fixed seat, one end of the two connecting rods is fixedly connected to a driving plate, the other end of the two connecting rods is fixedly connected to a push plate, a fixed strip is fixedly connected outside the push plate, and a spring two is sleeved outside the two connecting rods.

[0008] The spring one is arranged inside the sleeve.

[0009] The grip belt is slidably connected inside the fixed seat.

[0010] The fixed strip is slidably connected inside the grip belt.

[0011] The driving plate is used to fix the fixed strip.

[0012] The outer side of the fixing strip is slidably connected to the inside of the fixing base.

[0013] The utility model at least has the following beneficial effects:

[0014] The worker's palm is bound by the binding mechanism, so that the high-strength steel bar fast binding tool is fixed on the worker's palm, the worker holds the binding tool better, the high-strength steel bar fast binding tool is prevented from falling from the worker's hand and hurting other workers, and the safety of use is improved. BRIEF DESCRIPTION OF DRAWINGS

[0015] Fig. 1 It is a structural perspective view of the utility model;

[0016] Fig. 2 It is a sleeve structure schematic view of the utility model;

[0017] Fig. 3 It is a grip belt structure schematic view of the utility model;

[0018] Fig. 4 It is a connecting rod structure schematic view of the utility model.

[0019] In the drawing: 1, sleeve; 2, rotating column; 3, hook; 4, push piece; 5, spring one; 6, binding mechanism; 601, grip belt; 602, fixing base; 603, connecting rod; 604, driving plate; 605, push plate; 606, fixing strip; 607, spring two. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model.

[0021] Embodiment one

[0022] Please refer to Figs. 1 to 4 The utility model provides a kind of technical solutions: a kind of high-strength steel bar fast binding tool for building construction, including sleeve 1, the design of sleeve 1 is to facilitate accommodating rotating column 2 and other structures, rotating column 2 is rotatably connected in the inside of sleeve 1, the design of rotating column 2 is to connect hook 3 and push piece 4, hook 3 is fixedly connected at the top of rotating column 2, the design of hook 3 is to facilitate hooking steel wire, push piece 4 is fixedly connected at the bottom of rotating column 2, the design of push piece 4 is to let spring one 5 push it, to drive rotating column 2 and hook 3, spring one 5 is sleeved on the outside of rotating column 2, sleeve 1 outside is provided with binding mechanism 6 for binding palm.

[0023] The binding mechanism 6 comprises a holding belt 601, a fixing base 602, two connecting rods 603, the holding belt 601 is arranged on the outer side of the sleeve 1, the holding belt 601 is designed to facilitate accommodation of other structures, the top end of the fixing base 602 is fixedly connected to the bottom end of the sleeve 1, the fixing base 602 is designed to facilitate installation of other structures, the outer sides of the two connecting rods 603 are slidingly connected to the inner side of the fixing base 602, the connecting rods 603 are designed to connect the driving plate 604 and the pushing plate 605, one end of the two connecting rods 603 is fixedly connected with the driving plate 604, the driving plate 604 is designed to fix the fixing strip 606, the other end of the two connecting rods 603 is fixedly connected with the pushing plate 605, the pushing plate 605 is designed to be pushed by the spring 2 607, so as to drive the connecting rods 603 and the driving plate 604, the outer side of the pushing plate 605 is fixedly connected with the fixing strip 606, the fixing strip 606 is designed to be clamped with the clamping groove on the holding belt 601, the outer sides of the two connecting rods 603 are sleeved with the spring 2 607, and the spring 2 607 is designed to push the pushing plate 605.

[0024] The spring 1 5 is arranged in the inner side of the sleeve 1, and the spring 2 607 is designed to push the pushing plate 605, so as to drive the connecting rods 603 and the driving plate 604.

[0025] The holding belt 601 is slidingly connected to the inner side of the fixing base 602, and the holding belt 601 is designed to facilitate binding of the palm.

[0026] The fixed strip 606 is slidingly connected inside the grip belt 601, and the design of the fixed strip 606 is to clamp the grip belt 601 to adjust the length of the grip belt 601. When high-strength steel fastening tools are needed to bundle steel bars, first bend the iron wire, then pass it through the steel bar and hook it on the hook 3. At this time, pull the sleeve 1, and the rotating column 2 will also rotate several turns in the process, and the iron wire will be just bundled on the steel bar. After releasing the hand, the spring 1 5 will push the push piece 4, so as to reset the rotating column 2. In the process, the worker passes his palm through the grip belt 601 and holds the sleeve 1. When the tightness of the grip belt 601 needs to be adjusted, press the push plate 605 with your hand, so that the push plate 605 drives the connecting rod 603, and then drives the driven plate 604, so that the fixed strip 606 is separated from the grip belt 601. At this time, the tightness of the grip belt 601 can be adjusted. After the tightness is determined, release the hand pressing the push plate 605, and the spring 2 607 will push the push plate 605, so as to drive the driven plate 604 and the fixed strip 606 through the connecting rod 603, so that the fixed strip 606 is clamped with different clamping grooves on the grip belt 601, so as to adjust the tightness of the grip belt 601. By using the restraint mechanism 6 to restrain the worker's palm, the high-strength steel fastening tool is firmly fixed on the worker's palm, so that the worker can better hold the fastening tool, avoid the fastening tool from falling off the worker's hand and hurting other workers, and improve the safety of use.

[0027] Embodiment two

[0028] The driven plate 604 is used to fix the fixed strip 606, and the design of the fixed strip 606 is to facilitate being driven to drive the fixed strip 606 to clamp the fixed strip 606 with the grip belt 601.

[0029] The outer side of the fixed strip 606 is slidingly connected inside the fixed seat 602, and the design of the fixed strip 606 is to clamp the grip belt 601.

[0030] It should be noted that, in the present text, relational terms such as first and second and the like can only be used to distinguish one entity or operation from another entity or operation, without necessarily requiring or implying any such actual relationship or order between these entities or operations. Moreover, the terms "include", "contain" or any other variant thereof are intended to cover non-exclusive inclusion, so that the process, method, article or equipment including a series of elements not only includes those elements, but also includes other elements not explicitly listed or inherent to such process, method, article or equipment.

[0031] Although the embodiments of the present application have been shown and described, it is to be understood that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present application, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A tool for rapid binding of high-strength steel bars in building construction, comprising a sleeve (1), characterized in that: The sleeve (1) is rotatably connected to a rotating column (2), the top of the rotating column (2) is fixedly connected to a hook (3), the bottom of the rotating column (2) is fixedly connected to a push plate (4), a spring (5) is sleeved on the outside of the rotating column (2), and a restraint mechanism (6) for restraining the palm is provided on the outside of the sleeve (1).

2. The high-strength steel bar quick-tying tool for building construction according to claim 1, characterized in that: The restraint mechanism (6) includes a grip (601), a fixed seat (602), and two connecting rods (603). The grip (601) is located on the outside of the sleeve (1). The top end of the fixed seat (602) is fixedly connected to the bottom end of the sleeve (1). The outer sides of the two connecting rods (603) are slidably connected to the inside of the fixed seat (602). One end of the two connecting rods (603) is fixedly connected to a drive plate (604), and the other end of the two connecting rods (603) is fixedly connected to a push plate (605). The outer side of the push plate (605) is fixedly connected to a fixing strip (606), and a spring (607) is sleeved on the outer side of each of the two connecting rods (603).

3. The high-strength steel bar quick-tying tool for building construction according to claim 2, characterized in that: The spring (5) is located inside the sleeve (1).

4. The high-strength steel bar quick-tying tool for building construction according to claim 2, characterized in that: The grip strap (601) is slidably connected inside the fixed base (602).

5. The high-strength steel bar quick-tying tool for building construction according to claim 2, characterized in that: The fixing strip (606) is slidably connected inside the grip strap (601).

6. The high-strength steel bar quick-tying tool for building construction according to claim 2, characterized in that: The drive plate (604) is used to fix the fixing strip (606).

7. The high-strength steel bar quick-tying tool for building construction according to claim 2, characterized in that: The outer side of the fixing strip (606) is slidably connected to the inside of the fixing seat (602).