Drilling platform for steel trestle pile foundation construction
By using a bearing plate and support rod structure on the drilling platform for the pile foundation construction of the steel trestle bridge, and fixing it in the soft soil with fixing holes and steel bars, the problems of the steel trestle bridge tilting on the soft soil and workers falling off were solved, thus improving the stability and safety of the platform.
Patent Information
- Application Number
- CN202520036258.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-08
- Publication Date
- 2025-12-26
- Estimated Expiration
- 2035-01-08
AI Technical Summary
There are safety hazards of tilting and workers falling when fixing the steel trestle bridge pile foundation construction platform on soft soil.
A drilling platform for steel trestle bridge pile foundation construction was designed. It adopts a bearing plate and support rod structure. The support rod is equipped with plates and fixing holes, and is fixed in soft soil by steel bars to enhance the stability of the platform.
This effectively prevented the steel trestle from tilting on soft soil, improving the stability of the construction platform and the safety of workers.
Smart Images

Figure CN223725977U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to steel trestle pile foundation construction platform technical field, concretely related to a steel trestle pile foundation construction drilling platform. BACKGROUND
[0002] The main purpose of steel trestle pile drilling is to build stable foundation structure in water or soft soil foundation to support the weight and bearing capacity of steel trestle. By drilling, steel pipe pile or concrete pile can be inserted into the ground to provide stable support and ensure the safety and stability of steel trestle during use.
[0003] According to the disclosure (announcement) number: CN211256688U, the disclosure (announcement) day: August 14, 2020, the disclosure of a kind of steel trestle integrated construction platform and steel pipe pile positioning system, including anchor rod, anchor pull rod, inclined pull rod, fixed rod, fixed cross bar, anchor vertical rod and later on its fixed rod erection's construction platform;Anchor rod is set between anchor pull rod, anchor rod and the already erected bailey group is fixed;Anchor vertical rod is set between anchor pull rod, anchor vertical rod and anchor rod are vertically arranged and fixed into an organic whole;Anchor vertical rod and anchor rod are set between inclined pull rod;The lower end of anchor vertical rod and fixed rod are perpendicular and fixed into an organic whole;Fixed rod is set between fixed cross bar, anchor vertical rod and fixed rod are set between inclined pull rod;Fixed rod and fixed cross bar are fixed with steel pipe pile.
[0004] In the prior art including the above patent, when the soft soil fixed construction platform, the worker will cause the steel trestle to dump on the soft soil or the worker to fall from the steel trestle after stepping on the steel trestle on the platform, it is more dangerous. INVENTION CONTENTS
[0005] The utility model aims at providing a kind of steel trestle pile foundation construction drilling platform, realize the inclination when avoiding steel trestle in soft soil fixed.
[0006] In order to achieve the above object, the utility model provides the following technical scheme: a kind of steel trestle pile foundation construction drilling platform, including bearing plate, the bottom of the bearing plate is provided with multiple linear array arrangement support rod, the support rod is fixedly provided with plate piece, multiple linear array arrangement fixing hole is opened in the plate piece, steel bar is arranged in the fixing hole, the support rod is fixed by the steel bar.
[0007] As preferred, the fixing block is provided between the bearing plate and the support rod, the fixing groove is opened in the fixing block, the bottom of the bearing plate is provided with the plug-in block, and the plug-in block is inserted into the fixing groove.
[0008] As preferred, multiple linear array arrangement screw holes are opened in the bearing plate, and the slot hole is opened in the fixing block and communicated with the screw hole.
[0009] As preferred, the internal thread of the threaded hole is provided with a screw rod which penetrates through the threaded hole and enters into the slot hole.
[0010] As preferred, the bearing plate is symmetrically provided with baffles, and a plurality of drill holes arranged in linear array are formed between the baffles.
[0011] As preferred, a plurality of hanging holes arranged in linear array are formed on the outer side of each of the two baffles.
[0012] In the above technical solution, the steel trestle pile foundation construction drilling platform has the following beneficial effects: the bearing plate is used to bear the artificial drilling construction, a platform is provided for the drilling construction, the bearing plate is supported by the plurality of support rods at the bottom of the bearing plate, the support rods are fixed on the soft soil by the plate pieces on the support rods, the bearing plate on the soft soil is further fixed and inclined to be avoided, the support rods are fixed on the soft soil by the plurality of fixing holes on the plate pieces, and the stability of the bearing plate is improved by the reinforcing bars in the fixing holes which are fixed on the ground. BRIEF DESCRIPTION OF DRAWINGS
[0013] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the drawings needed in the embodiments will be briefly introduced as follows. Obviously, the drawings in the following description are only some embodiments of the present application, and other drawings can also be obtained by those skilled in the art according to these drawings.
[0014] Figure 1 The overall structure schematic diagram provided by the embodiments of the present application is shown in the figure.
[0015] Figure 2 The cross-sectional structure schematic diagram provided by the embodiments of the present application is shown in the figure.
[0016] Explanation of reference signs:
[0017] 1, bearing plate; 11, drill hole; 12, baffle; 13, threaded hole; 14, screw rod; 15, support rod; 16, embedded slot; 17, plate piece; 18, fixing hole; 19, fixing block; 20, fixing slot; 21, insertion block; 22, slot hole; 23, hanging hole. DETAILED DESCRIPTION
[0018] In order to make those skilled in the art better understand the technical solutions of the present application, the present application will be further described in detail with reference to the drawings.
[0019] As Figures 1-2As shown in the steel trestle pile foundation construction drilling platform, including the bearing plate 1, the bottom of the bearing plate 1 is provided with a plurality of linear array arranged support rod 15, the support rod 15 is fixedly provided with a plate 17, the plate 17 is provided with a plurality of linear array arranged fixing hole 18, the fixing hole 18 is provided with a reinforcing bar, the support rod 15 is fixed by the reinforcing bar.
[0020] Specifically, in use, the support rod 15 is inserted into the soft soil, and then the plate 17 is attached to the soft soil surface, and then the reinforcing bar is inserted into the fixing hole 18 to fix the plate 17 on the soft soil surface, ensuring the depth of the reinforcing bar in the soft soil, fixing the support rod 15, avoiding the worker on the bearing plate 1 when drilling, unable to ensure the balance and stability of the bearing plate 1, and at the same time, the embedded groove 16 on the support rod 15 is filled with soft soil, increasing the fixation.
[0021] In the above scheme, the bearing plate 1 is used to support the artificial drilling 11 construction to provide a platform for the drilling 11 construction, and the plurality of support rods 15 at the bottom of the bearing plate 1 are used to support the bearing plate 1, and the plate 17 on the support rod 15 is used to further fix the bearing plate 1 on the soft soil, avoiding the inclination of the bearing plate 1 on the soft soil, and the plurality of fixing holes 18 on the plate 17 are used to fix the support rod 15 on the soft soil, and the reinforcing bar in the fixing hole 18 is fixed in the ground, improving the stability of the bearing plate 1.
[0022] As a further provided embodiment of the utility model, according to Figure 1 And Figure 2 As shown in the figure, the fixing block 19 is arranged between the bearing plate 1 and the support rod 15, the fixing groove 20 is arranged on the fixing block 19, and the plug-in block 21 is arranged at the bottom of the bearing plate 1 and inserted into the fixing groove 20.
[0023] Specifically, during installation, the fixing block 19 is placed on the support rod 15, then the bearing plate 1 is placed on the fixing block 19, the plug-in block 21 at the bottom of the bearing plate 1 is inserted into the fixing groove 20, and the bearing plate 1 is fixed on the plug-in block 21.
[0024] As a further provided embodiment of the utility model, according to Figure 2 As shown in the figure, a plurality of linear array arranged threaded holes 13 are arranged on the bearing plate 1, and the slot hole 22 is arranged in communication with the threaded hole 13 on the fixing block 19.
[0025] Further, the screw rod 14 is screwedly arranged in the threaded hole 13 and enters the slot hole 22.
[0026] Specifically, the screw rod 14 is inserted into the threaded hole 13 on the bearing plate 1, and then the screw rod 14 passes through the threaded hole 13 and enters the slot hole 22 on the fixing block 19, so as to fix the bearing plate 1, the fixing block 19 and the support rod 15.
[0027] As a further provided embodiment of the utility model, according to Figure 2 As shown in the figure, the bearing plate 1 is symmetrically provided with baffles 12, and a plurality of drill holes 11 arranged in linear array are arranged between the baffles 12.
[0028] Further, a plurality of hanging holes 23 arranged in linear array are arranged on the outer side of the two baffles 12.
[0029] Specifically, the workers work on the drill holes 11, and at the same time, the safety ropes are bound on the hanging holes 23 to increase the protection of the workers.
[0030] Working principle: in use, the screw rod 14 is inserted into the threaded hole 13 on the bearing plate 1, and then the screw rod 14 passes through the threaded hole 13 and enters the slot hole 22 on the fixing block 19, so as to fix the bearing plate 1, the fixing block 19 and the support rod 15, then the support rod 15 is inserted into the soft soil, then the plate piece 17 is attached to the soft soil surface, and then the reinforcing steel is inserted into the fixing hole 18 to fix the plate piece 17 on the soft soil surface, so as to ensure the depth of the reinforcing steel in the soft soil surface, fix the support rod 15, avoid the workers on the bearing plate 1 when drilling, and ensure the balance and stability of the bearing plate 1, and at the same time, the embedded slot 16 on the support rod 15 is filled with soft soil on the soft soil surface, so as to increase the fixation.
[0031] The above only describes some exemplary embodiments of the utility model in a descriptive manner, and it is needless to say that for ordinary skilled persons in the art, the described embodiments can be modified in various ways without departing from the spirit and scope of the utility model. Therefore, the above drawings and description are illustrative in nature and should not be understood as limiting the scope of protection of the utility model claims.
Claims
1. A steel jetty pile foundation construction drilling platform, characterized by, The utility model provides a bearing plate (1), the bottom of bearing plate (1) is provided with a plurality of linear array arrangement support rod (15), support rod (15) is fixedly provided with plate piece (17), plate piece (17) is provided with a plurality of linear array arrangement fixed hole (18), fixed hole (18) is provided with reinforcing steel bar, support rod (15) is fixed through reinforcing steel bar.
2. A steel trestle pile foundation construction drilling platform according to claim 1, characterized in that, The utility model discloses a bearing plate (1) and support rod (15) are provided with fixed block (19), fixed block (19) is provided with fixed slot (20), the bottom of bearing plate (1) is provided with plug -in block (21), plug -in block (21) is inserted in fixed slot (20).
3. A steel trestle pile foundation construction drilling platform according to claim 2, characterized in that, The utility model discloses a bearing plate (1) is provided with a plurality of linear array arrangement screw hole (13), fixed block (19) is provided with the slot hole (22) of communicating with screw hole (13).
4. A steel jetty pile foundation construction drilling platform according to claim 3, characterised in that, The utility model discloses a screw rod (14) is screwedly provided in screw hole (13), and screw rod (14) passes through screw hole (13) and enters slot hole (22) in.
5. A steel jetty pile foundation construction drilling platform according to claim 1, characterized in that, The utility model discloses a bearing plate (1) is provided with symmetrically baffle (12), and a plurality of linear array arrangement drilling (11) are arranged between baffle (12).
6. A steel jetty pile foundation construction drilling platform according to claim 5, characterised in that, The outer side of two baffle (12) is provided with a plurality of linear array arrangement hanging hole (23).