Aluminum alloy formwork convenient to splice quickly

By setting slots and clamping plates on the aluminum alloy template and combining them with bolt fasteners, rapid splicing can be achieved, solving the problem of long time consumption in traditional bolt connection methods and improving construction efficiency.

CN223738987UActive Publication Date: 2025-12-30YUNNAN JIANZHU AUTO REFITMENT FACTORY +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423173402.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-23
Publication Date
2025-12-30
Estimated Expiration
2034-12-23

AI Technical Summary

Technical Problem

Traditional aluminum alloy formwork is assembled using multiple bolts, which makes the installation and disassembly process cumbersome, time-consuming, and affects construction efficiency.

Method used

The device uses a first slot and a card plate to engage for positioning, and a bolt fastener to secure the connecting plate, card plate and template body, reducing the number of bolts used and simplifying operation.

Benefits of technology

It greatly saves construction time, reduces operational complexity, improves convenience for construction personnel, and reduces labor and time costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223738987U_ABST
    Figure CN223738987U_ABST
Patent Text Reader

Abstract

The utility model provides an aluminum alloy formwork convenient to splice quickly, and relates to the technical field of aluminum alloy formworks, the aluminum alloy formwork comprises a formwork body, a plurality of first mounting holes are formed in the two sides of the formwork body, a connecting plate is slidably connected into the formwork body, and a plurality of second inserting rods are fixedly mounted on the side face of the connecting plate; one end of each second inserting rod penetrates through a first mounting hole in one side of the formwork body, first clamping grooves are formed in the multiple second inserting rods, clamping plates are connected among the multiple first clamping grooves in an inserted mode, and bolt fixing parts are arranged among the connecting plate, the clamping plates and the formwork body. The first clamping grooves and the clamping plates are clamped so that the two formwork bodies can be limited after being spliced together, the connecting plates, the clamping plates and the formwork bodies are locked through one bolt fixing piece, only one bolt fixing piece needs to be operated in the disassembly and assembly process, and the construction time is greatly saved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to aluminium alloy template technical field, specifically, relate to an aluminium alloy template convenient to quick splice. BACKGROUND

[0002] In the field of building construction, aluminium alloy template is widely applied because of its light weight, high strength, corrosion resistance and reusability, the traditional aluminium alloy template splicing mode adopts bolt connection, that is, adjacent templates are fastened together through a plurality of bolts, although this connection mode ensures the stability and safety of the template structure, but in actual operation, the installation and dismounting process of the bolt is tedious, time-consuming, and corresponding tools need to be equipped, which greatly affects the construction efficiency, especially in large building projects requiring a large number of template splicing, the inconvenience of the traditional bolt connection mode is particularly prominent, which increases the labor cost and time cost. Therefore, we improve it and propose an aluminium alloy template convenient to quick splice. SUMMARY

[0003] The utility model discloses a kind of aluminium alloy templates convenient to quick splice, to improve the above-mentioned problems.

[0004] To achieve the above-mentioned purposes, the utility model provides an aluminium alloy template convenient to quick splice to improve the above-mentioned problems.

[0005] The application is as follows:

[0006] An aluminium alloy template convenient to quick splice, comprising a template main body, a plurality of first mounting holes are formed on both sides of the template main body, a connecting plate is slidably connected in the template main body, a plurality of second insertion rods are fixedly installed on the side surface of the connecting plate, one end of the second insertion rod penetrates the first mounting hole on one side of the template main body, a first clamping groove is formed on each of the plurality of second insertion rods, a clamping plate is inserted between the plurality of first clamping grooves, and a bolt fixing piece is arranged between the connecting plate, the clamping plate and the template main body.

[0007] As a preferred technical solution of the application, the bolt fixing piece comprises a second through hole formed on the clamping plate and a fastening bolt connected between the first mounting hole, the connecting plate and the second through hole, and a nut is arranged on the outer surface of the fastening bolt.

[0008] As a preferred technical solution of the application, a first insertion rod is fixedly connected to the connecting plate, a first through hole is formed on the clamping plate, and the first insertion rod penetrates the first mounting hole and the first through hole.

[0009] The first through hole and the second through hole are respectively located at both ends of the clamping plate.

[0010] As a preferred technical scheme of the present application, a second clamping groove is formed on the side of the first inserting rod away from the second inserting rod, and the second clamping groove is clamped with the inner wall of the first through hole.

[0011] As a preferred technical scheme of the present application, a reinforcing member is arranged in the template main body, and the reinforcing member is used for reinforcing the template main body.

[0012] As a preferred technical scheme of the present application, the reinforcing member comprises a plurality of first reinforcing strips, and the plurality of first reinforcing strips are fixedly installed in the template main body.

[0013] As a preferred technical scheme of the present application, the reinforcing member further comprises a second reinforcing strip, and the second reinforcing strip is fixedly installed between the template main body and the plurality of first reinforcing strips.

[0014] As a preferred technical scheme of the present application, a plurality of grooves are formed on one side of the connecting plate, and the inner wall of the groove is in sliding connection with the outer surface of the first reinforcing strip.

[0015] As a preferred technical scheme of the present application, a plurality of second installation holes are formed on the top and the bottom of the template main body.

[0016] As a preferred technical scheme of the present application, a limiting plate is fixedly installed on one side of the template main body, and a limiting groove is formed on the other side of the template main body.

[0017] Compared with the prior art, the present application has the following beneficial effects:

[0018] In the scheme of the present application:

[0019] In order to solve the problem that in the prior art, adjacent templates are fastened together by a plurality of bolts, and the installation and disassembly process is complicated and time-consuming, the first clamping groove and the clamping plate are arranged to limit the two template main bodies after splicing, and a bolt fixing piece is used to lock the connecting plate, the clamping plate and the template main body, so that only one bolt fixing piece needs to be operated during the disassembly process, which greatly saves the construction time. Compared with the traditional multi-bolt connection method, the number of bolts used is reduced, the operation complexity is reduced, and the operation convenience of the construction personnel is improved without the need for frequent replacement and tightening of multiple bolts. BRIEF DESCRIPTION OF DRAWINGS

[0020] Figure 1 The structure diagram of the aluminum alloy formwork provided by the present application is convenient for rapid splicing;

[0021] Figure 2 The exploded view of the aluminum alloy formwork provided by the present application is convenient for rapid splicing;

[0022] Figure 3The aluminum alloy template provided by the application is convenient for quick splicing Figure 1 An enlarged structural schematic view at position A in the middle;

[0023] Figure 4 A structural schematic view of the first clamping groove and the second clamping groove of the aluminum alloy template provided by the application;

[0024] Figure 5 The aluminum alloy template provided by the application is convenient for quick splicing Figure 1 An enlarged structural schematic view at position B in the middle;

[0025] Figure 6 A structural schematic view of the two template main bodies of the aluminum alloy template provided by the application when connected together.

[0026] Indicated in the figure:

[0027] 1, template main body; 101, first reinforcing strip; 102, second reinforcing strip;

[0028] 2, first mounting hole;

[0029] 3, connecting plate; 301, first insertion rod; 302, second insertion rod; 303, first clamping groove; 304, second clamping groove; 305, clamping plate; 306, first through hole; 307, second through hole; 308, fastening bolt; 309, groove;

[0030] 4, limiting plate; 401, limiting groove;

[0031] 5, second mounting hole. DETAILED DESCRIPTION

[0032] In order for those skilled in the art to better understand the technical scheme of the present application, the technical scheme in the embodiments of the present application will be described clearly and completely below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, not all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative labor should belong to the scope of protection of the present application.

[0033] As described in the background, the traditional splicing method of the aluminum alloy template is mostly bolt connection, that is, adjacent templates are fastened together through a plurality of bolts. Although this connection method ensures the stability and safety of the template structure, in actual operation, the installation and disassembly process of the bolts is tedious, time-consuming, and requires corresponding tools, which greatly affects the construction efficiency, especially in large-scale building projects that require a large number of template splicing, the inconvenience of the traditional bolt connection method is particularly prominent, increasing the labor cost and time cost.

[0034] In order to solve the technical problem, the utility model provides a kind of aluminium alloy formwork that is convenient for quick splicing.

[0035] Specifically, please refer to Figures 1-5 The aluminium alloy formwork that is convenient for quick splicing specifically includes:

[0036] Formwork main body 1, the both sides of formwork main body 1 are equipped with several first installation holes 2, slidingly connected with connecting plate 3 in formwork main body 1, the side of connecting plate 3 is fixedly installed with multiple second inserting rod 302, one end of second inserting rod 302 passes through the first installation hole 2 of one side of formwork main body 1, multiple second inserting rod 302 are all equipped with first clamping groove 303, multiple first clamping groove 303 are inserted with clamping plate 305, and bolt fixing piece is arranged between connecting plate 3, clamping plate 305 and formwork main body 1.

[0037] The aluminium alloy formwork that is convenient for quick splicing provided by the utility model, first clamping groove 303 and clamping plate 305 are engaged to limit two formwork main bodies 1 after splicing together, and one bolt fixing piece is used to lock between connecting plate 3, clamping plate 305 and formwork main body 1, so that only one bolt fixing piece needs to be operated in dismounting process, greatly save construction time, compared with traditional multi-bolt connection mode, the number of bolt used is reduced, and the operation complexity is reduced, without frequently replacing and tightening multiple bolts, the operation convenience of construction personnel is improved.

[0038] In order to make the personnel in the technical field better understand the utility model scheme, the technical scheme in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings.

[0039] It should be noted that, in the case of no conflict, the embodiments in the utility model and the features and technical solutions in the embodiments can be combined with each other.

[0040] It should be noted that: similar signs and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings.

[0041] Embodiment 1, please refer to Figures 1-5The utility model provides a kind of aluminum alloy template convenient for quick splicing, including template main body 1, a plurality of first installation holes 2 are set in the two sides of template main body 1, connecting plate 3 is slidably connected in template main body 1, a plurality of second insertion rod 302 are fixedly installed on the side surface of connecting plate 3, one end of second insertion rod 302 passes through the first installation hole 2 of one side of template main body 1, a plurality of first clamping groove 303 are set on a plurality of second insertion rod 302, and clamping plate 305 is inserted between a plurality of first clamping groove 303, and bolt fixing piece is arranged between connecting plate 3, clamping plate 305 and template main body 1;First clamping groove 303 and clamping plate 305 are engaged to limit two template main body 1 after splicing together in the utility model, and one bolt fixing piece is used to lock between connecting plate 3, clamping plate 305 and template main body 1, so that only one bolt fixing piece needs to be operated in dismounting process, greatly save construction time, compared with traditional multi-bolt connection mode, the utility model reduces the number of bolt used, reduces operation complexity, without frequently replacing and tightening multiple bolts, improve the operation convenience of construction personnel.

[0042] Further, as shown in Figure 1 、 Figure 2 and Figure 4 , the bolt fixing piece includes a second through hole 307 provided on the clamping plate 305 and a fastening bolt 308 connected between the first installation hole 2, the connecting plate 3 and the second through hole 307, and a nut is arranged on the outer surface of the fastening bolt 308. The clamping plate 305 can be fixed by the cooperation of the fastening bolt 308 and the nut, so as to improve the stability of the insertion of the clamping plate 305 and the first clamping groove 303.

[0043] Further, as shown in Figure 1 、 Figure 2 and Figure 4 , the connecting plate 3 is fixedly connected with a first insertion rod 301, and the clamping plate 305 is provided with a first through hole 306. The first insertion rod 301 passes through the first installation hole 2 and the first through hole 306. The clamping plate 305 can be further limited by the cooperation of the first insertion rod 301 and the first through hole 306, so as to further improve the stability of the clamping plate 305.

[0044] The first through hole 306 and the second through hole 307 are respectively located at the two ends of the clamping plate 305, so that the fixing points of the clamping plate 305 are at the two ends, so as to improve the stability of the clamping plate 305 when being fixed.

[0045] Further, as shown in Figure 3 and Figure 4 , the side, away from the second insertion rod 302, of the first insertion rod 301 is provided with a second clamping groove 304, and the second clamping groove 304 is clamped with the inner wall of the first through hole 306. The clamping plate 305 can be limited and fixed at the end, away from the second through hole 307, by the cooperation of the second clamping groove 304 and the first through hole 306.

[0046] In the embodiment 2, the aluminum alloy formwork provided in the embodiment 1 is further optimized, and in particular, a reinforcing member is arranged in the formwork body 1, the reinforcing member is used for reinforcing the formwork body 1, and the stability of the formwork body 1 is improved.

[0047] Further, as shown in Figure 1 , the reinforcing member comprises a plurality of first reinforcing strips 101, the plurality of first reinforcing strips 101 are fixedly installed in the formwork body 1, the formwork body 1 can be reinforced through the plurality of first reinforcing strips 101, and the strength of the formwork body 1 is improved.

[0048] Further, as shown in Figure 1 , the reinforcing member further comprises a second reinforcing strip 102, the second reinforcing strip 102 is fixedly installed between the formwork body 1 and the plurality of first reinforcing strips 101, the second reinforcing strip 102 cooperates with the first reinforcing strip 101 to further reinforce, and the strength of the formwork body 1 is further improved.

[0049] Further, as shown in Figure 1 and Figure 2 , a plurality of grooves 309 are formed on one side of the connecting plate 3, the inner wall of the groove 309 is in sliding connection with the outer surface of the first reinforcing strip 101, and the groove 309 is arranged to enable the connecting plate 3 to avoid the first reinforcing strip 101.

[0050] In the embodiment 3, the aluminum alloy formwork provided in the embodiment 1 or 2 is further optimized, and in particular, as shown in Figure 1 , a plurality of second installation holes 5 are formed on the top and the bottom of the formwork body 1, and the second installation hole 5 is arranged to facilitate the connection between the formwork body 1 and other related components in use.

[0051] Further, as shown in Figure 1 , a limiting plate 4 is fixedly installed on one side of the formwork body 1, and a limiting groove 401 is formed on the other side of the formwork body 1, when two formwork bodies 1 are spliced together, the stability between the two formwork bodies 1 can be improved through the mutual insertion and cooperation of the limiting plate 4 and the limiting groove 401.

[0052] The use process of the aluminum alloy formwork provided by the utility model is as follows:

[0053] With the splicing between two template bodies 1 as an example, the two template bodies 1 are spliced together, the limiting plate 4 is inserted with the corresponding limiting slot 401, the connecting plate 3 is arranged in one of the template bodies 1, the first inserting rod 301 and the second inserting rod 302 are inserted through the first installation hole 2 on the side of the two template bodies 1 close to each other, then the first through hole 306 is inserted with the first inserting rod 301, the clamping plate 305 is rotated to make the clamping plate 305 inserted with the first clamping slot 303, the clamping plate 305 is pulled to the direction of the second through hole 307 to make the inner wall of the first through hole 306 clamped with the second clamping slot 304, the fastening bolt 308 is inserted through the template body 1, the connecting plate 3 and the second through hole 307, and then the nut is screwed to realize the connection between the two template bodies 1, that is, as shown in Figure 6 When disassembling, the nut on the fastening bolt 308 is unscrewed, the fastening bolt 308 is removed, the clamping plate 305 is rotated to make the clamping plate 305 separated from the first clamping slot 303, the clamping plate 305 is pushed to make the first through hole 306 separated from the second clamping slot 304, the clamping plate 305 is removed, and the connecting plate 3 is pulled to make the first inserting rod 301 and the second inserting rod 302 separated from the first installation hole 2, so that the fixing of the two template bodies 1 is released.

[0054] In the present application, unless otherwise clearly specified and limited, the terms "mounting", "connecting", "connecting", "fixing" and the like should be understood in a broad sense, for example, it can be fixedly connected, or it can be detachably connected, or it can be integrated; it can be mechanically connected, or it can be electrically connected or in communication with each other; it can be directly connected, or it can be indirectly connected through an intermediate medium; it can be the communication or interaction relationship between two elements, unless otherwise clearly limited. For ordinary skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances.

[0055] Obviously, the above described embodiments are only part of the embodiments of the present application, not all the embodiments, and the preferred embodiments of the present application are given in the drawings, but do not limit the patent scope of the present application. The present application can be realized in many different forms, and conversely, the purpose of providing these embodiments is to make the disclosure of the present application more thorough and comprehensive. Although the present application has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions recorded in the foregoing embodiments, or make equivalent replacement for part of the technical features. Any equivalent structure made by using the contents of the present application specification and drawings, directly or indirectly used in other related technical fields, is also within the patent protection scope of the present application.

Claims

1. An aluminum alloy formwork facilitating quick assembly, characterized by, The utility model relates to a template, including template main part (1), a plurality of first installation hole (2) are seted up in both sides of template main part (1), the connecting plate (3) is slidably connected in template main part (1), a plurality of second insertion rod (302) are fixedly installed in the side of connecting plate (3), one end of second insertion rod (302) passes through the first installation hole (2) of template main part (1) one side, a plurality of first clamping slot (303) are seted up on second insertion rod (302), and the clamping plate (305) is inserted between a plurality of first clamping slot (303), and the bolt fixing spare is arranged between connecting plate (3), clamping plate (305) and template main part (1).

2. The aluminum alloy formwork of claim 1, wherein, The bolt fixing spare includes the second through -hole (307) seted up on the clamping plate (305) and the fastening bolt (308) connected between the first installation hole (2), the connecting plate (3) and the second through -hole (307), the outer surface of fastening bolt (308) is provided with the nut.

3. The aluminum alloy formwork of claim 2, wherein, The first insertion rod (301) is fixedly connected on the connecting plate (3), the first through -hole (306) is seted up on the clamping plate (305), and the first insertion rod (301) passes through the first installation hole (2) and the first through -hole (306). The first through -hole (306) and the second through -hole (307) are located at both ends of the clamping plate (305) respectively.

4. The aluminum alloy formwork of claim 3, wherein, The second clamping slot (304) is seted up on the side away from the second insertion rod (302) of first insertion rod (301), and the second clamping slot (304) is clamped with the inner wall of first through -hole (306).

5. The aluminum alloy formwork of claim 4, wherein, The reinforcing member is arranged in the template main part (1), and the reinforcing member is used for reinforcing the template main part (1).

6. The aluminum alloy formwork of claim 5, wherein, The reinforcing member includes a plurality of first reinforcing strips (101), and the plurality of first reinforcing strips (101) are fixedly installed in the template main part (1).

7. The aluminum alloy formwork of claim 6, wherein, The reinforcing member further includes a second reinforcing strip (102), and the second reinforcing strip (102) is fixedly installed between the template main part (1) and the plurality of first reinforcing strips (101).

8. The aluminum alloy formwork of claim 7, wherein, A plurality of grooves (309) are seted up on one side of the connecting plate (3), and the inner wall of the groove (309) is slidably connected with the outer surface of the first reinforcing strip (101).

9. The aluminum alloy formwork of claim 1, wherein, A plurality of second installation holes (5) are seted up on the top and the bottom of the template main part (1).

10. The aluminum alloy formwork of claim 1, wherein, The limiting plate (4) is fixedly installed on one side of the template main part (1), and the limiting groove (401) is seted up on the other side of the template main part (1).