Flexible support pile head anti-settlement device
By using the anti-settlement device for flexible support pile heads, and through the interlocking and spring devices of positioning clips, stabilizing clips, and supporting clips, the problem of support instability caused by pile foundation settlement of flexible support is solved, and the stability of the pile foundation and protection of the crossbeam are achieved within a certain range.
Patent Information
- Application Number
- CN202520171073.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-25
- Publication Date
- 2026-01-02
- Estimated Expiration
- 2035-01-25
AI Technical Summary
In long-span applications of flexible supports, the pile foundation is prone to settlement due to load, which can lead to instability of the support structure. Especially on poor foundations, existing technologies are not effective in preventing support deformation caused by pile settlement.
Design a flexible support pile head anti-settlement device, including a pile foundation top plate, a pile head connecting plate, a stabilizing sleeve, a stabilizing shaft, an upper top plate, a stabilizing sleeve, a stabilizing clamp, a stabilizing sleeve, a stabilizing shaft, and an upper top plate. Through the locking and spring device of the positioning clamp, stabilizing clamp, and supporting clamp, it cooperates with the settlement of the pile foundation to resist wind suction and maintain the stability of the crossbeam.
During the settlement process of the pile foundation, the device can support the load of the crossbeam, resist wind suction, prevent the crossbeam from deforming, maintain the stability of the pile foundation within a certain range, and protect the stability of the superstructure.
Smart Images

Figure CN223753364U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model belongs to photovoltaic power generation technical field especially relates to a flexible support pile head anti -settlement device. BACKGROUND
[0002] With new energy photovoltaic in the domestic large -scale popularization, new energy photovoltaic support structure also has changed, from the fixed support of the beginning to tracking support again to the flexible support that popularizes more in recent years, the advantage of flexible support is in the utilization ratio of complex terrain, large span and high space, when the span is larger, it will produce larger load to pile foundation, this leads to the settlement of some bad ground and thus causes the pile foundation to sink, further leads to the deformation of support, causes the instability of support structure.
[0003] The utility model discloses a flexible support pile head anti -settlement device solves the above -mentioned problem. UTILITY MODEL CONTENTS
[0004] In order to achieve the above purpose, the utility model adopts the following technical scheme:
[0005] A flexible support pile head anti -settlement device, it includes pile foundation top plate, pile head connecting plate, stable shaft sleeve, stable shaft, upper top plate, and the pile foundation top plate is installed on the pile foundation, and the pile head connecting plate is installed on the pile foundation top plate, and the upper top plate is located above the pile head connecting plate and is used for supporting crossbeam, and the stable shaft sleeve is located between the pile head connecting plate and the upper top plate, and the stable shaft sleeve is fixed on the pile head connecting plate, and the stable shaft is fixedly installed on the upper top plate, and the lower end of the stable shaft extends to the inside of the stable shaft sleeve;
[0006] The lower end of the upper top plate is installed with two positioning clamps, and the two positioning clamps are symmetrically distributed on the both sides of the stable shaft sleeve, and a plurality of stable clamps are placed in the inside of the positioning clamp, and a supporting clamp is placed in the inside of the stable clamp, and a spring device is arranged between the supporting clamp and the stable shaft sleeve, and the positioning clamp, the stable clamp and the supporting clamp are closely arranged between the pile head connecting plate and the upper top plate.
[0007] As a preferred scheme, the inner end of the positioning clamp and the inner end of the stable clamp are provided with a clamping groove, and the outer end of the stable clamp and the outer end of the supporting clamp are provided with a clamping block matched with the clamping groove, and the height of the clamping block is above the clamping groove.
[0008] As a preferred scheme, the lower end of the stable shaft is provided with a clamping block inside the stable shaft sleeve.
[0009] As a preferred scheme, the pile head connecting plate is fixed on the pile foundation top plate through a fastener, and the pile foundation top plate is fixed on the pile foundation through a fastener.
[0010] As a preferred scheme, the stabilizing sleeve is fixed on the pile head connecting plate in a threaded connection mode, and the stabilizing shaft is fixedly connected with the upper top plate through threaded fasteners.
[0011] As a preferred scheme, the positioning clamping piece is fixed on the upper top plate in a welding mode, and the lower end of the positioning clamping piece abuts against the upper end of the pile head connecting plate in an initial state.
[0012] As a preferred scheme, the upper end of the upper top plate is provided with two corner codes, and the lateral surface of the cross beam is welded with a cross beam transition plate, and the cross beam transition plate is connected with the corner codes through bolt fasteners.
[0013] Compared with the prior art, the utility model has the advantages that:
[0014] 1、The utility model discloses a pile foundation along with the settlement phenomenon, and the stable clamping piece and the positioning clamping piece are clamped in sequence, the two stable clamping pieces are clamped with each other, and the support clamping piece and the stable clamping piece are clamped, which plays a supporting cross beam load role under different settlement depths, can resist the uplift force caused by wind suction, avoids the large internal force change of the top cross beam caused by the settlement phenomenon, and thus the cross beam deformation is avoided, a certain range of pile foundation settlement phenomenon is allowed, and the function of protecting the stability of the cross beam structure is achieved.
[0015] 2、The utility model discloses that after the pile foundation reaches the maximum settlement depth, the stabilizing shaft can be clamped and fixed with the stabilizing sleeve, the upper structure of the pile head is prevented from moving upwards, the stability of the pile foundation is ensured within a certain range of sinking, the upper cross beam structure is not affected, and the stability of the upper cross beam is ensured. DRAWINGS
[0016] Figure 1 It is the schematic diagram of the utility model.
[0017] Figure 2 It is the schematic diagram of the first stage settlement phenomenon of the utility model.
[0018] Figure 3 It is the schematic diagram of the second stage settlement phenomenon of the utility model.
[0019] Figure 4 It is the schematic diagram of the third stage settlement phenomenon of the utility model.
[0020] Figure 5 It is the schematic diagram of the position relation between the utility model and the cross beam.
[0021] Label name in the figure: 1, pile foundation top plate; 2, pile head connecting plate; 3, stabilizing shaft sleeve; 4, stabilizing shaft; 5, upper top plate; 6, positioning clamp; 7, stabilizing clamp; 8, support clamp; 9, spring device; 10, cross beam; 11, cross beam transition plate; 12, corner code; 13, bolt fastener; 14, clamping groove; 15, clamping block; 16, clamping block. DETAILED DESCRIPTION
[0022] The specific embodiments of the utility model are described in further detail below in combination with the drawings and examples. The following examples or drawings are used to illustrate the utility model, but not to limit the scope of the utility model.
[0023] A flexible support pile head anti-settling device, as shown in Figures 1 to 5 Fig. 1, comprises a pile foundation top plate 1, a pile head connecting plate 2, a stabilizing shaft sleeve 3, a stabilizing shaft 4, and an upper top plate 5. The pile foundation top plate 1 is installed on the pile foundation. The pile head connecting plate 2 is installed on the pile foundation top plate 1. The upper top plate 5 is located above the pile head connecting plate 2 and is used to support the cross beam 10. The stabilizing shaft sleeve 3 is located between the pile head connecting plate 2 and the upper top plate 5, and the stabilizing shaft sleeve 3 is fixed on the pile head connecting plate 2. The stabilizing shaft 4 is fixedly installed on the upper top plate 5, and the lower end of the stabilizing shaft 4 extends into the stabilizing shaft sleeve 3.
[0024] The lower end of the upper top plate 5 is provided with two positioning clamps 6, which are symmetrically distributed on both sides of the stabilizing shaft sleeve 3. Two stabilizing clamps 7 are placed inside the positioning clamps 6. A support clamp 8 is placed inside the stabilizing clamp 7. The spring device 9 is arranged between the support clamp 8 and the stabilizing shaft sleeve 3. The positioning clamps 6, the stabilizing clamps 7, and the support clamps 8 are closely arranged between the pile head connecting plate 2 and the upper top plate 5.
[0025] When the pile foundation initially appears a settlement phenomenon, the stabilizing shaft sleeve 3, the stabilizing clamps 7, and the support clamps 8 sink together with the pile head connecting plate 2 connected with the pile foundation. The stabilizing shaft 4 and the positioning clamps 6 remain at the initial height because the upper top plate 5 connected with the cross beam 10. The spring device 9 increases the friction force between the two stabilizing clamps 7 and between the stabilizing clamp 7 and the support clamp 8, so that the relative positional relationship between the stabilizing clamps 7 and the support clamps 8 remains unchanged, showing a movement state that the stabilizing clamps 7 and the support clamps 8 move downward relative to the positioning clamps 6. With the settlement phenomenon of the pile foundation, the stabilizing clamps 7 and the positioning clamps 6 are clamped, the two adjacent stabilizing clamps 7 are clamped with each other, and the support clamps 8 and the stabilizing clamps 7 are clamped in turn. At different settlement depths, the cross beam 10 load is supported, and the upward force caused by wind suction can also be resisted, avoiding the occurrence of large internal force changes of the top cross beam 10 due to the settlement phenomenon, thereby preventing the deformation of the cross beam 10. It can allow a certain range of pile foundation settlement phenomenon, achieve the function of protecting the structure stability of the cross beam 10;
[0026] As Figure 1 shown, the inner end of the positioning clamp 6 and the inner end of the stabilizing clamp 7 are both provided with a clamping groove 14, the outer end of the stabilizing clamp 7 and the outer end of the supporting clamp 8 are both provided with a clamping block 15 which is adapted to the clamping groove 14, and the height of the clamping block 15 is above the clamping groove 14.
[0027] As Figure 4 shown, the lower end of the stabilizing shaft 4 is provided with a clamping block 16 which is inside the stabilizing shaft sleeve 3.
[0028] When the pile foundation has a certain amount of first stage settlement, the stabilizing clamp 7 which is close to the positioning clamp 6 is preset to be the outer stabilizing clamp 7, the clamping block 15 on the outer stabilizing clamp 7 is lowered to the same height as the clamping groove 14 on the positioning clamp 6, under the action of the spring device 9, the clamping block 15 and the clamping groove 14 are clamped, the relative position relationship between the outer stabilizing clamp 7 and the positioning clamp 6 is fixed, at this time, the outer stabilizing clamp 7 cooperates with the positioning clamp 6 to support the load of the top beam 10;
[0029] Similarly, when the pile foundation has a certain amount of second stage settlement again, the inner stabilizing clamp 7 is lowered relative to the outer stabilizing clamp 7, the clamping block 15 on the inner stabilizing clamp 7 is clamped with the clamping groove 14 on the outer stabilizing clamp 7, the inner stabilizing clamp 7 can also support the load of the top beam 10;
[0030] Similarly, when the pile foundation has a certain amount of third stage settlement for the third time, the supporting clamp 8 is lowered relative to the inner stabilizing clamp 7, the clamping block 15 on the supporting clamp 8 is clamped with the clamping groove 14 on the inner stabilizing clamp 7, the supporting clamp 8 can also support the load of the top beam 10; for different stages of settlement, when the wind suction condition, the upward force of the beam 10 can be tightened by the nut at the upper end of the stabilizing shaft 4, so that the stabilizing shaft 4 inside the stabilizing shaft sleeve 3 and the clamping block 16 are lifted and closely fit with the inner measurement of the upper part of the stabilizing shaft sleeve 4, to resist the wind suction force.
[0031] After the above three settlements, the stabilizing shaft 4 reaches the top end of the inner wall of the stabilizing shaft sleeve 3, the relative sliding distance between the stabilizing shaft sleeve 3 and the stabilizing shaft 4 reaches the maximum value, the stabilizing shaft 4 and the stabilizing shaft sleeve 3 are clamped and fixed, preventing the upper structure of the pile head from moving up, thereby ensuring the stability of the pile foundation within a certain range of sinking without affecting the structure of the upper beam 10, and ensuring the stability of the upper beam 10.
[0032] The pile head connecting plate 2 is fixed on the pile foundation top plate 1 by fasteners, the pile foundation top plate 1 is fixed on the pile foundation by fasteners, the stabilizing shaft sleeve 3 is fixed on the pile head connecting plate 2 in a threaded connection manner, and the stabilizing shaft 4 is fixedly connected with the upper top plate 5 by threaded fasteners.
[0033] The positioning clamping piece 6 is fixed on the upper top plate 5 in a welding manner, and the lower end of the positioning clamping piece 6 is in abutment with the upper end of the pile head connecting plate 2 in an initial state.
[0034] Two corner codes 12 are arranged on the upper end of the upper top plate 5, and a cross beam transition plate 11 is welded on the side of the cross beam 10, and the cross beam transition plate 11 is connected with the corner code 12 through a bolt fastener 13.
[0035] The above is only a preferred embodiment of the present application, and does not limit the present application in any form. Any simple modification or equivalent change made according to the technical essence of the present application to the above embodiment falls within the protection scope of the present application.
Claims
1. A flexible support pile head anti-settling device, characterized in that, The utility model relates to a pile foundation stabilizing device, including pile foundation top plate (1), pile head connecting plate (2), stable axle sleeve (3), stable axle (4), upper top plate (5), pile foundation top plate (1) is installed on the pile foundation, the pile head connecting plate (2) is installed on the pile foundation top plate (1), the upper top plate (5) is located the pile head connecting plate (2) and is used for supporting crossbeam (10) above, stable axle sleeve (3) is located between the pile head connecting plate (2) and the upper top plate (5), and stable axle sleeve (3) is fixed on the pile head connecting plate (2), stable axle (4) is fixedly installed on the upper top plate (5), and the lower end of stable axle (4) extends to the inside of stable axle sleeve (3); The lower end of upper top plate (5) is equipped with two positioning clamping pieces (6), and the two positioning clamping pieces (6) are symmetrically distributed on the both sides of stable axle sleeve (3), a plurality of stable clamping pieces (7) are placed in the inner side of positioning clamping piece (6), a supporting clamping piece (8) is placed in the inner side of stable clamping piece (7), and spring devices (9) are arranged between the supporting clamping piece (8) and stable axle sleeve (3), and positioning clamping piece (6), stable clamping piece (7) and supporting clamping piece (8) are closely arranged between the pile head connecting plate (2) and the upper top plate (5).
2. The head anti-settling device of the flexible support pile according to claim 1, characterized in that: The inner end of positioning clamping piece (6) and the inner end of stable clamping piece (7) are provided with clamping grooves (14), the outer end of stable clamping piece (7) and the outer end of supporting clamping piece (8) are provided with clamping blocks (15) matched with the clamping grooves (14), and the height of clamping block (15) is above the clamping groove (14).
3. The head anti-settling device of the flexible support pile according to claim 1, characterized in that: The lower end of stable axle (4) is provided with a clamping block (16) located in the inside of stable axle sleeve (3).
4. The head sinking-preventing device of a flexible support pile according to claim 1, characterized in that: The pile head connecting plate (2) is fixed on the pile foundation top plate (1) through fasteners, and the pile foundation top plate (1) is fixed on the pile foundation through fasteners.
5. The head sinking-preventing device of a flexible support pile according to claim 1, characterized in that: The stable axle sleeve (3) is fixed on the pile head connecting plate (2) in a threaded connection mode, and the stable axle (4) is fixedly connected with the upper top plate (5) through threaded fasteners.
6. The head sinking-preventing device of a flexible support pile according to claim 1, characterized in that: The positioning clamping piece (6) is fixed on the upper top plate (5) in a welding mode, and in the initial state, the lower end of the positioning clamping piece (6) abuts against the upper end of the pile head connecting plate (2).
7. The head sinking-preventing device of a flexible support pile according to claim 1, characterized in that: The upper end of the upper top plate (5) is provided with two corner codes (12), the lateral surface of the crossbeam (10) is welded with a crossbeam transition plate (11), and the crossbeam transition plate (11) is connected with the corner code (12) through bolt fasteners (13).