Turnover single-layer ultrahigh industrial factory building wall connecting piece embedded part

By designing reusable single-story ultra-high industrial plant wall tie embedded parts, and adopting a combination structure of D20 steel bars, sleeves and fasteners, the problems of insufficient safety and high steel pipe rental costs in the construction of high-rise plants are solved, thereby improving the safety and economy of construction.

CN223753508UActive Publication Date: 2026-01-02CHINA CONSTR THIRD BUREAU GRP (JIANGSU) CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520102105.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-16
Publication Date
2026-01-02
Estimated Expiration
2035-01-16

AI Technical Summary

Technical Problem

In the construction of high-rise industrial plants, existing temporary tie-up measures have problems such as insufficient safety, high steel pipe rental costs, significant construction impact, and difficulty in dismantling and modification. Furthermore, the pre-embedded steel pipes are not secure and are difficult to remove.

Method used

Design a reusable single-story ultra-high industrial plant wall-connecting embedded component, which adopts a combination structure of D20 steel bars, sleeves, steel pipes and fasteners. The embedded steel bars are connected to the extension steel bars, and the steel pipes are sleeved on the outside of the sleeves and fixed with fasteners. The component can be reused.

Benefits of technology

It improves construction safety, saves on steel pipe rental costs, simplifies the operation process, reduces the impact on construction, and most components can be reused, saving costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223753508U_ABST
    Figure CN223753508U_ABST
Patent Text Reader

Abstract

The utility model discloses a turnover single-layer ultra-high industrial factory building wall connecting piece embedded part which comprises an embedded steel bar, an extension steel bar, a sleeve, a steel pipe and a fastener, the embedded steel bar comprises an upper vertical rod and a lower non-vertical unit, a first external thread is arranged on the upper portion of the vertical rod, a second external thread is arranged on the upper portion of the extension steel bar, and the non-vertical unit is arranged on the lower portion of the extension steel bar. First external threads are arranged on the lower portion of the sleeve, third external threads are arranged on the lower portion of the sleeve, internal threads are arranged in the sleeve, the sleeve is connected with the first external threads and the third external threads, the sleeve is sleeved with the steel pipe, and the fastener is connected with the second external threads and presses the upper edge of the steel pipe. The device is simple in structure, stable and reliable, most components can be recycled, and cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model belongs to the technical field of building construction, and particularly relates to a turnover single-layer super-high industrial plant wall connecting piece embedded part. BACKGROUND

[0002] Now many industrial plants are high in single-layer height due to use function requirements, and are mostly 4.5-9 m high. When a disc buckle frame is used for engineering scaffolding, the general step distance is 2 m, the longitudinal distance is 1.5 m, the transverse distance is 0.9 m, and the wall connecting piece is 3 steps and 2 spans or 2 steps and 3 spans. During construction, due to the high floor height, the outer frame needs to be erected to 6 m or more above the current floor (i.e. 3 steps or more) before the upper structure is poured. According to the provisions of 7.5.1 of the Safety Technical Standard for Building Construction Socket Type Disc Buckling Steel Pipe Scaffolding JGJ / T 231-2021: the working frame vertical rod should be accurately positioned and should be erected according to the construction progress, and the one-time erection height of the double-row outer working frame should not exceed two steps of the uppermost wall connecting piece, and the free height should not be greater than 4 m. Therefore, when the upper structure is constructed, the outer frame needs to be temporarily connected, and after the upper wall connecting piece is formed, it can be removed. After the structure is formed, the wall connecting piece can be increased in the form of holding column according to the needs. The commonly used temporary connection measure is a throw support, as shown in Figure 5 and Figure 6 .

[0003] When the Figure 5 form is used, the following problems exist:

[0004] 1. Since the throw support is connected by the extended transverse wall connecting piece, no reinforcement measures are taken at the end, and in actual implementation on site, it is found that the end shakes greatly and is not safe enough;

[0005] 2. A large area of transverse wall connecting piece steel pipes is increased, which increases the steel pipe rental cost;

[0006] 3. The post-stage removal and reconstruction investment is large, which affects the subsequent construction to some extent;

[0007] When the Figure 6 pre-embedded steel pipe is used, the following problems exist:

[0008] 1. The floor thickness is only 13 cm, and if a steel pipe is embedded in the floor, the steel pipe is not firmly embedded due to insufficient embedding depth;

[0009] 2. If a steel pipe penetrates the floor, there is a large difficulty in removal, and the post-stage hoisting and sealing is not convenient, and the sealing engineering quantity is large.

[0010] In summary, a new type of embedded part needs to be designed to provide help for high wall connecting pieces. UTILITY MODEL CONTENTS

[0011] In order to solve the above problems, the utility model discloses a kind of turnover single-layer super-high industrial plant wall connecting piece embedded part, simple structure, stable and reliable, and most components can be recycled, save cost.

[0012] To achieve the above object, the technical scheme of the utility model is as follows:

[0013] A kind of turnover single-layer super-high industrial plant wall connecting piece embedded part, including embedded steel bar, lengthening steel bar, sleeve, steel pipe and fastener, the embedded steel bar includes vertical rod in upper and non-vertical unit in lower, the vertical rod upper is equipped with outer thread one, the lengthening steel bar upper is equipped with outer thread two, lower is equipped with outer thread three, the sleeve inside is equipped with internal thread, the sleeve connects outer thread one and outer thread three, the steel pipe is sleeved in the outside of sleeve, the fastener connects outer thread two and presses the upper edge of steel pipe.

[0014] As a supplement of the utility model, the non-vertical unit is horizontal rod or circular ring.

[0015] As a supplement of the utility model, the embedded steel bar and lengthening steel bar adopt D20 steel bar.

[0016] As a supplement of the utility model, the fastener includes nut and gasket.

[0017] As a supplement of the utility model, the nut outside is horizontally welded with symmetrical steel bar.

[0018] The utility model has the advantages of:

[0019] 1, safety: D20 L-shaped steel embedded steel pipe is more reliable than traditional pre-embedded, and the throw support end has reliable hitch point, with high safety.

[0020] 2, economy:

[0021] a: because it does not need to extend horizontal steel pipe, can save steel pipe lease fee;

[0022] b: except that the steel bar embedded in floor cannot be recycled, other components can be made by oneself, components are small, length <500mm, can be made by waste material, waste into treasure, and other components can be recycled, economic effect is very considerable.

[0023] 3, operability: the wall connecting piece embedded part installation and removal are very simple, for temporary, short time wall connecting piece hitch is very friendly, and once production, multiple use, do not need to invest too much manpower and material resources. BRIEF DESCRIPTION OF DRAWINGS

[0024] Figure 1 It is the structure schematic diagram of the utility model.

[0025] Figure 2 The steel pipe internal schematic view is described in the utility model.

[0026] Figure 3 The non-vertical unit another embodiment schematic view is described in the utility model.

[0027] Figure 4 The nut top view is described in the utility model.

[0028] Figure 5 It is common to throw the support structure one.

[0029] Figure 6 It is common to throw the support structure two.

[0030] The list of figure mark is as follows:

[0031] 1, pre-buried steel bar, 2, lengthening steel bar, 3, sleeve, 4, steel pipe, 5, fastener, 6, vertical rod, 7, non-vertical unit, 8, external thread one, 9, external thread two, 10, external thread three, 11, nut, 12, gasket, 13, steel bar. Specific implementation

[0032] The utility model is further illustrated below in combination with the drawings and specific implementation, and it should be understood that the following specific implementation is only used for illustrating the utility model and is not used for limiting the scope of the utility model.

[0033] As shown in the figure, the utility model discloses a kind of single-layer superhigh industrial plant wall connecting piece pre-embedded part of turnover, including pre-buried steel bar 1, lengthening steel bar 2, sleeve 3, steel pipe 4 and fastener 5, the pre-buried steel bar 1 is L type, including vertical rod 6 in upper and non-vertical unit 7 (horizontal rod) below, vertical rod 6 is equipped with external thread one 8 above, lengthening steel bar 2 is equipped with external thread two 9 above, and is equipped with external thread three 10 below, the pre-buried steel bar 1 and lengthening steel bar 2 are all using D20 steel bar, the sleeve 3 is equipped with internal thread inside, the sleeve 3 connects external thread one 8 and external thread three 10, the steel pipe 4 is sleeved in the outside of sleeve 3, the fastener 5 includes nut 11 and gasket 12, the nut connects external thread two 9, and gasket 12 below nut 11 presses the upper edge of steel pipe 4.

[0034] When construction, component 1 is pre-buried to concrete floor first, external thread one 8 is exposed outside, after concrete has strength, pre-buried steel bar 1 and lengthening steel bar 2 are connected by sleeve 3, then steel pipe 4 is sleeved outside, finally fastened by fastener 5.

[0035] After the temporary support is removed, the lengthened steel bars 2, the sleeves 3, the steel pipes 4 and the fasteners 5 can be recycled to the upper layer for recycling, the exposed part of the embedded steel bars 1 on the floor is cut off, and the subsequent work is not affected.

[0036] The non-vertical unit 7 can also be a circular ring, as shown in the drawings. Figure 3

[0037] The utility model discloses outside horizontal welding of nut 11 has symmetrical steel bar 13, and it is convenient to carry tightly manually.

[0038] The utility model discloses simple structure, stable and reliable, and most components can be recycled, and save the cost.

[0039] It needs to be explained that the above content only explains the technical thought of the utility model, and cannot limit the protection scope of the utility model, and for ordinary skilled person in the art, can make a number of improvements and refinements without departing from the principle of the utility model, and these improvements and refinements all fall within the protection scope of the utility model claim.​

Claims

1. A reusable embedded component for wall ties in a single-story ultra-high industrial building, characterized in that: The utility model relates to a reinforced concrete embedded steel bar lengthening device, including embedded steel bar (1), lengthening steel bar (2), sleeve (3), steel pipe (4) and fastener (5), embedded steel bar (1) includes vertical pole (6) in the upper and non-vertical unit (7) below, vertical pole (6) is equipped with outer thread one (8) above, lengthening steel bar (2) is equipped with outer thread two (9) above and is equipped with outer thread three (10) below, sleeve (3) is equipped with inner thread inside, sleeve (3) is connected outer thread one (8) with outer thread three (10), steel pipe (4) is sleeved outside sleeve (3), fastener (5) is connected outer thread two (9) and presses the upper edge of steel pipe (4).

2. The transferable single-story ultra-high industrial building wall panel embedded part according to claim 1, characterized in that: The non-vertical unit (7) is a horizontal rod or a circular ring.

3. The transferable single-story ultra-high industrial building wall panel embedded part according to claim 1, characterized in that: The embedded steel bar (1) and the lengthening steel bar (2) are made of D20 steel bars.

4. The transferable single-story ultra-high industrial building wall panel embedment of claim 1, wherein: The fastener (5) includes a nut (11) and a gasket (12).

5. The turnkey single-story ultra-high industrial building wall panel embedment of claim 4, wherein: The nut (11) is horizontally welded with symmetrical steel bars (13) outside.