Chute special for concrete pouring of retaining wall of manual hole digging pile
By designing an adjustable chute structure, the problem of conventional chutes requiring multiple rotations was solved, enabling one-time pouring of the protective concrete and applicability to different apertures.
Patent Information
- Application Number
- CN202520570421.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-28
- Publication Date
- 2026-01-06
- Estimated Expiration
- 2035-03-28
AI Technical Summary
Conventional chutes require multiple rotations to meet the requirements when pouring retaining concrete, which is inconvenient to use.
A special chute for pouring concrete for the retaining wall of manually excavated bored piles has been designed, including a chute, a cone cap, a slide, a main rod, a secondary rod, a positioning sleeve, and a connecting sleeve. The chute is adjustable through threaded connection and hinged structure, and is suitable for retaining walls of different hole diameters.
It enables one-time pouring of protective concrete, simplifies the operation, is applicable to protective walls of different apertures, and has a simple structure that is easy to process.
Smart Images

Figure CN223766823U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the technical field of concrete pouring equipment, and in particular relates to a special chute for pouring concrete for manually excavated pile wall retaining walls. Background Technology
[0002] Manually excavated cast-in-place piles refer to piles formed by manually excavating holes, placing reinforcing cages, and then pouring concrete. To prevent collapse during excavation, concrete retaining walls need to be poured around the hole, with each section of retaining wall poured manually as it is excavated downwards. A chute is required when pouring the retaining concrete. However, conventional chutes require multiple rotations during pouring to meet the requirements, making them cumbersome to use. Utility Model Content
[0003] The purpose of this utility model is to solve the problem that conventional chutes require multiple rotations during pouring to meet the requirements, which is cumbersome to use, and to propose a special chute for pouring concrete for manually excavated bored pile walls.
[0004] To achieve the above objectives, the present invention adopts the following technical solution:
[0005] A special chute for pouring concrete for the retaining wall of manually excavated piles includes a chute, which is composed of a cone cap, a slide rail, a main rod, a secondary rod, a positioning sleeve, and a sleeve. Multiple slide rails are provided around the lower side of the cone cap. The top of the slide rails is hinged to the lower surface of the cone cap via a hinge. The main rod is fixedly connected to the center of the lower surface of the cone cap. The positioning sleeve and the connecting sleeve are sleeved on the outer side of the main rod. The connecting sleeve is located above the positioning sleeve. The slide rails and the connecting sleeve are movably connected through the secondary rod.
[0006] As a further description of the above technical solution:
[0007] The outer surface of the main rod is provided with an external thread near the bottom, and the inner wall of the positioning sleeve is provided with an internal thread. The positioning sleeve is threadedly connected to the outer surface of the main rod.
[0008] As a further description of the above technical solution:
[0009] The inner wall of the connecting sleeve is smooth.
[0010] As a further description of the above technical solution:
[0011] Both ends of the auxiliary rod are provided with hinge holes, and a first hinge plate with a hole is fixedly connected to the middle of the outer surface of the slide. One end of the auxiliary rod is movably connected to the first hinge plate with a hole through a pin.
[0012] As a further description of the above technical solution:
[0013] The outer surface of the connecting sleeve is fixedly connected with a plurality of second perforated hinge plates, and the other end of the auxiliary rod is movably connected to the second perforated hinge plates via a pin.
[0014] As a further description of the above technical solution:
[0015] The outer side of the chute is equipped with a protective wall and a template.
[0016] In summary, due to the adoption of the above technical solution, the beneficial effects of this utility model are:
[0017] This utility model has a simple structure, is easy to process, and can simultaneously pour a ring of concrete around the wall without multiple moves; at the same time, the size of the entire chute can be adjusted by adjusting the up and down position of the positioning sleeve, thus making it suitable for wall protection of different apertures. Attached Figure Description
[0018] Figure 1 This is a three-dimensional structural diagram of a special chute for pouring concrete for the retaining wall of manually excavated bored piles proposed in this utility model.
[0019] Figure 2 This is a bottom view of the special chute for pouring concrete for the retaining wall of manually excavated bored piles proposed in this utility model.
[0020] Figure 3 This is a schematic diagram illustrating the construction structure of a special chute for pouring concrete for manually excavated bored pile walls, as proposed in this utility model.
[0021] Legend:
[0022] 1. Conical cap; 2. Slide rail; 3. Main rod; 4. Secondary rod; 5. Positioning sleeve; 6. Connecting sleeve; 7. Chute; 8. Template; 9. Wall protection. Detailed Implementation
[0023] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of the present utility model.
[0024] Please see Figure 1-3This utility model provides a technical solution: a special chute 7 for concrete pouring of manually excavated pile retaining wall 9, including a chute 7, the chute 7 being composed of a cone cap 1, a slide 2, a main rod 3, a secondary rod 4, a positioning sleeve 5 and a sleeve. Multiple slides 2 are provided around the lower side of the cone cap 1. The top of the slide 2 is hinged to the lower surface of the cone cap 1 by a hinge. The main rod 3 is fixedly connected to the center of the lower surface of the cone cap 1. The positioning sleeve 5 and the connecting sleeve 6 are sleeved on the outer side of the main rod 3. The connecting sleeve 6 is located on the upper side of the positioning sleeve 5. The outer surface of the main rod 3 is provided with external threads near the bottom. The inner wall of the positioning sleeve 5 is provided with internal threads. The positioning sleeve 5 is threaded to the outer surface of the main rod 3. The inner wall of the connecting sleeve 6 is smooth.
[0025] The slide 2 and the connecting sleeve 6 are movably connected by a secondary rod 4. Both ends of the secondary rod 4 are provided with hinge holes. A first hinge plate with a hole is fixedly connected to the middle of the outer surface of the slide 2. One end of the secondary rod 4 is movably connected to the first hinge plate with a hole through a pin. Multiple second hinge plates with holes are fixedly connected to the outer surface of the connecting sleeve 6. The other end of the secondary rod 4 is movably connected to the second hinge plates with holes through a pin.
[0026] The outer side of the chute 7 is provided with a protective wall 9 and a template 8.
[0027] Working principle: When in use, rotate the positioning sleeve 5 to adjust its height on the main rod 3. At this time, the connecting sleeve 6 moves up and down to adjust its height. The up and down movement of the connecting sleeve 6 drives the slide 2 to rotate through the auxiliary rod 4, adjusting the chute 7 to a suitable size. Then, the chute 7 is placed between the already poured retaining wall 9 of the bored pile and the formwork 8 where the concrete for the retaining wall 9 is to be poured. During pouring, the concrete falls from above the cone cap 1 and then flows evenly along the surrounding slide 2 into the surrounding formwork 8, completing the pouring.
[0028] The above description is only a preferred embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any equivalent substitutions or changes made by those skilled in the art within the technical scope disclosed in the present utility model, based on the technical solution and the inventive concept of the present utility model, should be included within the protection scope of the present utility model.
Claims
1. A chute for pouring concrete for a man-made hole pile, comprising a chute (7), characterized in that, The chute (7) is composed of a cone cap (1), a slide (2), a main rod (3), an auxiliary rod (4), a positioning sleeve (5) and a sleeve, a plurality of slides (2) are arranged around the lower side of the cone cap (1), the top end of the slide (2) is hinged to the lower surface of the cone cap (1) through a hinge, the main rod (3) is fixedly connected to the center of the lower surface of the cone cap (1), the positioning sleeve (5) and the connecting sleeve (6) are sleeved on the outer side of the main rod (3), the connecting sleeve (6) is located on the upper side of the positioning sleeve (5), and the slide (2) and the connecting sleeve (6) are movably connected through the auxiliary rod (4).
2. A chute for pouring concrete for a man-made hole pile according to claim 1, wherein An external thread is formed in the outer surface of the main rod (3) near the bottom, and an internal thread is formed in the inner wall of the positioning sleeve (5), and the positioning sleeve (5) is threadedly connected to the outer surface of the main rod (3).
3. A chute for pouring concrete for a man-made hole pile according to claim 1, wherein The inner wall of the connecting sleeve (6) is smooth.
4. A chute for pouring concrete for a man-made hole pile according to claim 1, wherein Hinge holes are formed in both ends of the auxiliary rod (4), a first holeed hinge piece is fixedly connected to the middle of the outer surface of the slide (2), and one end of the auxiliary rod (4) is movably connected to the first holeed hinge piece through a pin shaft.
5. A chute for use in the pouring of concrete for the construction of a manhole according to claim 4, characterized in that, A plurality of second holeed hinge pieces are fixedly connected to the outer surface of the connecting sleeve (6), and the other end of the auxiliary rod (4) is movably connected to the second holeed hinge piece through a pin shaft.
6. A chute for use in the pouring of concrete for the construction of a manhole according to claim 1, characterized in that, The outer side of the chute (7) is provided with a guard wall (9) and a formwork (8).