Building climbing frame for building construction

By setting a combination of connectors, adjusters, and storage components on the building climbing scaffold, and using magnetic rings and adsorption rings to achieve automatic adjustment and fixation of the storage boxes, the problem of unstable storage panels is solved, and the practicality and safety of the climbing scaffold are improved.

CN223767145UActive Publication Date: 2026-01-06ANHUI EXI CONSTRUCTION CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202423151140.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-20
Publication Date
2026-01-06
Estimated Expiration
2034-12-20

AI Technical Summary

Technical Problem

The existing building scaffolding lacks a barrier structure for its storage platform, which makes it easy for parts or tools to fall off. Furthermore, the angle adjustment relies on manual visual inspection, making it difficult to ensure that the platform is level, and there is a risk of unstable placement.

Method used

The design incorporates a combination of connectors, adjusters, and storage components. Magnetic rings and suction rings enable automatic adjustment and fixation of the storage box. Combined with the cooperation of the main rod and protective sleeve, the length of the climbing frame can be adjusted and fixed.

Benefits of technology

The storage box can automatically adjust to a horizontal position and quickly secure itself, reducing the risk of parts or tools falling off, improving the stability and practicality of the storage, and the length of the climbing frame can be adjusted according to needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223767145U_ABST
    Figure CN223767145U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of building construction, and discloses a building climbing frame for building construction, which comprises two main rods, a plurality of pedals are fixedly connected between the two main rods, the upper parts of the main rods are in threaded connection with screw rods, and the lower parts of the main rods are provided with protective sleeves. A storage mechanism is arranged on the left portion of the main rod located on the left side, the storage mechanism comprises a connecting piece, an adjusting piece is arranged on the left side of the connecting piece, a storage piece is arranged on the left side of the adjusting piece, the adjusting piece comprises a connecting column, the storage piece comprises a storage box, and a connector is fixedly connected to the right side of the storage box. According to the utility model, through the mutual matching among the connecting piece, the adjusting piece and the article placing piece, the article placing box can be automatically adjusted to be horizontal with the ground through the gravity of the article placing box, and meanwhile, after the article placing box is adjusted, the angle of the article placing box can be quickly fixed through the adjusting piece, so that the article placing box is more practical.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building construction, and in particular to a climbing formwork for building construction. Background Technology

[0002] Climbing scaffolding, also known as climbing formwork or climbing scaffolding system, is a temporary structure commonly used in the construction of high-rise buildings to improve construction efficiency and safety.

[0003] A search revealed Chinese Patent Publication No. CN216690329U, which discloses a construction scaffolding system. The scaffolding includes ladder legs, with a circular groove at the upper end and two rectangular grooves at the front end. A rectangular sliding groove is located at the rear end of the rectangular grooves. This invention, through the use of a threaded rotating rod, a sliding block, and a flat gear meshing with the sliding block, allows workers to place necessary parts or tools on a shelf while using the scaffolding, providing a simple workbench and improving work efficiency. The rotating handle and sliding block ensure that the scaffolding can be adjusted to a parallel state regardless of its tilt angle, preventing parts or tools from falling and greatly enhancing its practicality.

[0004] While the aforementioned device can hold necessary parts and tools by setting up a shelf and can adjust the angle of the work platform to keep it level, the shelf is relatively flat and lacks any obstructions. This poses a risk that parts or tools may fall off the shelf if accidentally bumped while retrieving them. Furthermore, the shelf needs to be manually adjusted to be level with the ground, but it is difficult to guarantee that the shelf is perfectly level by visual inspection alone. Insufficient leveling can lead to instability and easy rolling of items, making it impractical. Therefore, a construction climbing scaffold is proposed to solve the above problems. Utility Model Content

[0005] To overcome the above shortcomings, this utility model provides a building construction climbing scaffold, which aims to improve the existing technology where the placement board is relatively flat and lacks obstruction structure. This leads to the risk that parts or tools may fall off the placement board if they are accidentally bumped into when retrieving them. In addition, the placement board needs to be manually adjusted to make it level with the bottom surface. However, it is difficult to ensure that the placement board is completely level by relying solely on the naked eye. There is a problem that if the placement board is not adjusted to be level, the placed items will be unstable and easily roll off.

[0006] To achieve the above objectives, this utility model adopts the following technical solution: a building construction climbing scaffold, comprising two main poles, with multiple footboards fixedly connected between the two main poles, a screw threadedly connected to the upper part of each main pole, a protective sleeve provided at the lower part of each main pole, and a storage mechanism provided on the left side of the left main pole, the storage mechanism comprising a connector, an adjusting member provided on the left side of the connector, a storage component provided on the left side of the adjusting member, the adjusting member comprising a connecting column, the storage component comprising a storage box, a connecting head fixedly connected to the right side of the storage box, the connecting head being rotatably connected to the connecting column.

[0007] As a further description of the above technical solution:

[0008] The outer wall of the connecting column is provided with a sliding groove at the front and rear. A control ring is slidably connected to the outside of the connecting column. Push plates are fixedly connected to the upper and lower parts of the outer wall of the control ring. Slider blocks are fixedly connected to the front and rear parts of the inner wall of the control ring. The sliders are slidably connected to the sliding groove.

[0009] As a further description of the above technical solution:

[0010] A magnet ring is fixedly connected to the left side of the control ring.

[0011] As a further description of the above technical solution:

[0012] The connector includes a fixing sleeve, and a fixing pad is fixedly connected to the inner wall of the fixing sleeve.

[0013] As a further description of the above technical solution:

[0014] A spring is fixedly connected to both the control ring and the fixed sleeve.

[0015] As a further description of the above technical solution:

[0016] An adsorption ring is fixedly connected to the right side of the storage box, and the magnetic ring is movably connected to the adsorption ring.

[0017] As a further description of the above technical solution:

[0018] The top of the main rod has a slot, and the bottom of the main rod is fixedly connected to a block. The protective sleeve is movably connected to the block. The left side of the main rod, located on the left side, has multiple fixing slots.

[0019] As a further description of the above technical solution:

[0020] The fixing groove includes an auxiliary opening, and a limiting groove is formed on the lower right side of the auxiliary opening. A limiting pad is fixedly connected to the left side of the limiting groove.

[0021] This utility model has the following beneficial effects:

[0022] 1. In this utility model, by setting up the cooperation between the connecting parts, the adjusting parts, and the storage parts, the storage box can be automatically adjusted to be level with the ground by its own weight. At the same time, after the storage box is adjusted, the angle of the storage box can be quickly fixed by the adjusting parts, which is more practical.

[0023] 2. In this utility model, by setting the cooperation between the main rod, the protective sleeve, and the screw, the slots and blocks on different building climbing frames can be connected and fixed, thereby adjusting the overall length of the building climbing frame, making it more practical. Attached Figure Description

[0024] Figure 1 This is a schematic diagram of the overall three-dimensional structure of a building climbing formwork proposed in this utility model;

[0025] Figure 2 This is a schematic diagram of the disassembled three-dimensional structure of a building climbing formwork proposed in this utility model.

[0026] Figure 3 This is a three-dimensional cross-sectional structural diagram of the uprights of a building climbing scaffold proposed in this utility model.

[0027] Figure 4 This is a schematic diagram of the overall three-dimensional structure of a loading mechanism for a building climbing scaffold proposed in this utility model;

[0028] Figure 5 This is a partial three-dimensional cross-sectional structural diagram of a material placement mechanism for a building climbing scaffold in construction, as proposed in this utility model.

[0029] Figure 6 This is a three-dimensional structural diagram of a disassembled storage component for a building construction climbing scaffold, as proposed in this utility model.

[0030] Legend:

[0031] 1. Main rod; 2. Pedal; 3. Screw; 4. Protective sleeve; 5. Storage mechanism; 51. Connector; 52. Adjusting component; 53. Storage component; 531. Storage box; 532. Adsorption ring; 533. Connector; 521. Connecting column; 522. Slide groove; 523. Control ring; 524. Push plate; 525. Spring; 526. Magnetic ring; 527. Slider; 511. Fixing sleeve; 512. Fixing pad; 11. Slot; 12. Locking block; 13. Fixing groove; 131. Auxiliary port; 132. Limiting groove; 133. Limiting pad. Detailed Implementation

[0032] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0033] Reference Figure 1 - Figure 2 This utility model provides an embodiment of a building construction climbing frame, including two main poles 1 for connecting various components. Multiple footboards 2 are fixedly connected between the two main poles 1 for workers to climb during construction. The footboards and the main poles 1 together form the building construction climbing frame. A screw rod 3 is threadedly connected to the upper part of the main pole 1 for fixing the locking block 12 and the locking groove 11. Nuts are threadedly connected to both ends of the screw rod 3. A protective sleeve 4 made of rubber is provided at the lower part of the main pole 1 for anti-slip and to protect the locking block 12. A storage mechanism 5 is provided on the left side of the main pole 1 on the left side for placing tools and parts.

[0034] like Figure 4 - Figure 6 As shown, the storage mechanism 5 includes a connector 51, which is used to connect the storage mechanism 5 to the main rod 1. An adjusting member 52 is provided on the left side of the connector 51, which is used to adjust and limit the storage box 531. A storage component 53 is provided on the left side of the adjusting member 52, which is used to place tools, etc. The adjusting member 52 includes a connecting post 521, which is used to connect various components. The storage component 53 includes a storage box 531, which is used to place parts and tools. A connector 533 is fixedly connected to the right side of the storage box 531, which is used to connect the storage box 531 to the adjusting member 52. The connector 533 is rotatably connected to the connecting post 521, so that the storage box 531 can rotate and adjust according to gravity.

[0035] Furthermore, the outer wall of the connecting post 521 is provided with a sliding groove 522 at the front and rear, which is used to connect with the slider 527. A control ring 523 is slidably connected to the outside of the connecting post 521, which is used to control the connection between the magnet ring 526 and the adsorption ring 532. Push plates 524 are fixedly connected to the upper and lower parts of the outer wall of the control ring 523, which are used to drive the magnet ring 526 to move. Slider 527 is fixedly connected to the front and rear parts of the inner wall of the control ring 523, which is used to cooperate with the sliding groove 522 to limit the position of the control ring 523. The slider 527 is slidably connected to the sliding groove 522. A magnet ring is fixedly connected to the left side of the control ring 523. 526 is used to fix the adsorption ring 532 to cooperate with the fixation of the storage box 531. The connector 51 includes a fixing sleeve 511, which is movably connected to the fixing groove 13. A fixing pad 512, which may be made of rubber, is fixedly connected to the inner wall of the fixing sleeve 511 to improve the stability of the connection of the connector 51. A spring 525 is fixedly connected between the control ring 523 and the fixing sleeve 511 to cooperate with the movement and reset of the control ring 523. An adsorption ring 532, which is made of iron, is fixedly connected to the right side of the storage box 531. A magnetic ring 526 is movably connected to the adsorption ring 532 and can be adsorbed by the adsorption ring 532.

[0036] Please see Figure 2 - Figure 3 The top of the main rod 1 is provided with a slot 11, which is used to connect with the slot 12 on another building climbing frame. The bottom of the main rod 1 is fixedly connected with the slot 12, which is used to connect with the slot 11 on another building climbing frame. The slot 11 and the slot 12 are fixed by the screw 3. The protective sleeve 4 is movably connected to the slot 12 and is used to protect the slot 12. The left side of the main rod 1 on the left side is provided with a number of fixing slots 13, which are used to connect with the placement mechanism 5. The fixing slot 13 includes an auxiliary opening 131, which is used to allow the fixing sleeve 511 to enter the fixing slot 13. The lower right side of the auxiliary opening 131 is provided with a limiting slot 132, which is used to limit the fixing sleeve 511. The left side of the limiting slot 132 is fixedly connected with a limiting pad 133, which is used to cooperate with the fixing pad 512 to improve the stability of the connection.

[0037] Working principle: In use, the storage mechanism 5 is fixed in a suitable position through the fixing slot 13 according to the usage requirements. When the angle of the storage box 531 needs to be adjusted, the push plate 524 is pushed towards the fixing sleeve 511. The push plate 524 will then drive the control ring 523 to move towards the fixing sleeve 511. The magnetic ring 526 connected to the control ring 523 will disengage from the adsorption ring 532, and the spring 525 will be compressed. When the adsorption ring 532 loses the adsorption fixation of the magnetic ring 526, the storage box 531 will rotate under the action of gravity. The connector 533 will rotate within the connecting column 521. Under the action of gravity, the storage box 531 will become horizontal to the ground. After the storage box 531 has been adjusted by gravity, the push plate 524 can be slowly released. The spring 525 will push the magnetic ring 526 to reset, thereby adsorbing and fixing the adsorption ring 532 again, thus fixing the angle of the adjusted storage box 531.

[0038] If the length of one construction climbing scaffold cannot meet the construction requirements, the protective sleeve 4 at the lower part of the main pole 1 of another construction climbing scaffold can be removed. Then, the locking block 12 on the construction climbing scaffold can be inserted into the locking groove 11 at the top of the original construction climbing scaffold. When inserting into the locking groove 11, the screw 3 connected to the locking groove 11 must first be removed. Then, the locking block 12 can be inserted into the locking groove 11. Finally, the screw 3, the locking groove 11, and the locking block 12 can be tightened to complete the connection between the construction climbing scaffolds.

[0039] Finally, it should be noted that the above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Although the present utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.

Claims

1. A construction building climbing frame comprising a main pole (1) and in a number of two, characterized in that: Two said main rod (1) between the common fixed connection has pedal (2) and the number is multiple, the upper portion of main rod (1) screw connection has screw rod (3), the lower portion of main rod (1) is provided with protective sleeve (4), the left portion of the left main rod (1) is provided with storage mechanism (5), the storage mechanism (5) includes connecting piece (51), the left side of connecting piece (51) is provided with adjusting part (52), the left side of adjusting part (52) is provided with storage object (53), adjusting part (52) includes connecting column (521), storage object (53) includes storage box (531), the right side of storage box (531) is fixedly connected with connecting head (533), connecting head (533) is rotatably connected with connecting column (521).

2. The building construction climbing formwork frame according to claim 1, characterized in that: The outer wall of the connecting column (521) is provided with a sliding groove (522) on the front and rear, and the outer sliding connection of the connecting column (521) is provided with a control ring (523), the outer wall of the control ring (523) is fixedly connected with a push plate (524) on the upper and lower portions, the inner wall of the control ring (523) is fixedly connected with a sliding block (527) on the front and rear, and the sliding block (527) is slidably connected with the sliding groove (522).

3. The building construction climbing formwork of claim 2, wherein: The left side of the control ring (523) is fixedly connected with a magnet ring (526).

4. The building construction climbing formwork frame according to claim 2, wherein: The connecting piece (51) includes a fixed sleeve (511), and the inner wall of the fixed sleeve (511) is fixedly connected with a fixed pad (512).

5. The building construction climbing formwork frame according to claim 4, wherein: The control ring (523) and the fixed sleeve (511) are fixedly connected with a spring (525).

6. The building construction climbing formwork frame according to claim 3, wherein: The right side of the storage box (531) is fixedly connected with an adsorption ring (532), and the magnet ring (526) is movably connected with the adsorption ring (532).

7. The building construction climbing formwork frame according to claim 4, wherein: The top of the main rod (1) is provided with a clamping groove (11), and the bottom of the main rod (1) is fixedly connected with a clamping block (12), the protective sleeve (4) is movably connected with the clamping block (12), and the left side of the left main rod (1) is provided with a plurality of fixing grooves (13).

8. The building construction climbing formwork frame according to claim 7, wherein: The fixing groove (13) includes an auxiliary port (131), and the right side of the auxiliary port (131) is provided with a limiting groove (132) on the lower portion, and the left side of the limiting groove (132) is fixedly connected with a limiting pad (133).