Hanging basket for bridge body decoration construction
By designing a hanging basket for bridge decoration construction, the problems of limited construction space and high safety hazards were solved. The hanging basket was able to move stably on the guardrail and be easily transported on the ground, thus improving construction efficiency and safety.
Patent Information
- Application Number
- CN202520083202.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-14
- Publication Date
- 2026-01-23
- Estimated Expiration
- 2035-01-14
AI Technical Summary
During bridge decoration construction, self-propelled boom aerial work platforms have problems such as blind spots, limited construction space, high operational difficulty, high safety hazards, and high rental costs.
Design a hanging basket for bridge decoration construction, including a suspension frame, a hanging basket, a first guide wheel, a second guide wheel and a third guide wheel. Through the structural design of the suspension frame and the detachable installation of the guide wheels, the hanging basket can be moved stably on the guardrail and transported conveniently on the ground.
It improves construction safety and efficiency, reduces operational difficulty, lowers rental costs, and enhances construction stability and flexibility.
Smart Images

Figure CN223824031U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to landscape engineering bridge body decoration construction technical field, specifically, the utility model relates to a kind of hanging basket for bridge body decoration construction. BACKGROUND
[0002] Bridge body decoration construction is the key and difficulty of landscape engineering construction, and its construction progress and construction quality directly affect the construction progress of the entire landscape engineering. During the bridge body decoration construction process, there is a visual blind area during the movement of the self-propelled straight-arm aerial work platform, and the construction site space is limited, which is prone to traffic accidents. When using the self-propelled straight-arm aerial work platform, the working height and horizontal movement of the self-propelled straight-arm aerial work platform are limited due to the limited construction space, making the operation difficult during the work process and prone to situations such as head collision with the beam body. Workers are also needed to guide traffic during installation, which prolongs the installation period and requires frequent charging of the self-propelled straight-arm aerial work platform, resulting in high rental costs and safety hazards. SUMMARY
[0003] Therefore, the utility model provides a hanging basket for bridge body decoration construction to solve or at least alleviate the above-mentioned problems in the prior art.
[0004] To achieve the aforementioned purpose, the utility model provides a hanging basket for bridge body decoration construction, which comprises a suspension frame, a hanging basket, first guide wheels, second guide wheels, and third guide wheels. The top ends of the suspension frame are fixedly installed with connecting rods on both sides. The top end of the suspension frame is provided with a U-shaped frame, and the two ends of the U-shaped frame are fixedly installed at the ends of the two connecting rods. The hanging basket is fixedly installed at the bottom end of the suspension frame. The first guide wheels are provided in two, and the two first guide wheels are fixedly installed at the two ends of the U-shaped frame, with the first guide wheels facing the suspension frame. The second guide wheels are provided in two, and the two second guide wheels are arranged below the two connecting rods. The third guide wheels are provided in two, and the two third guide wheels are arranged on the suspension frame. The side of the hanging basket is provided with a tool basket, and the tool basket is fixedly installed on the suspension frame.
[0005] In the hanging basket for bridge body decoration construction as described above, the second guide wheels are fixedly installed below the connecting rods, and the third guide wheels are detachably installed on the suspension frame. When the third guide wheels are installed on the right side of the suspension frame, the axial direction of the third guide wheels is parallel to the vertical rod of the U-shaped frame. When the third guide wheels are installed on the left side of the suspension frame, the axial direction of the third guide wheels is perpendicular to the vertical rod of the U-shaped frame.
[0006] In the hanging basket for bridge decoration construction as claimed in the preceding description, optionally, the axial direction of the first guide wheel is perpendicular to the vertical rod of the U-shaped frame, and the axial direction of the second guide wheel is parallel to the connecting rod.
[0007] In the hanging basket for bridge decoration construction as claimed in the preceding description, optionally, the second guide wheel is slidingly installed on the connecting rod, both sides of the suspension frame are provided with rotating rods, the rotating rod comprises a first end and a second end, the third guide wheel is rotatably installed on the first end, both ends of both sides of the suspension frame are provided with circular grooves, mounting rods are fixedly installed between the circular grooves on the same side, a first rotating shaft is fixedly installed at the center of the mounting rod, and the rotating rod is sleeved outside the first rotating shaft at the center.
[0008] In the hanging basket for bridge decoration construction as claimed in the preceding description, optionally, the first end and the second end are both fixedly installed with first clamping plates, a limiting rod is fixedly installed on the first clamping plate of the second end, a second clamping plate is fixedly installed at the end of the limiting rod away from the first clamping plate, the included angle between the first clamping plate and the second clamping plate is forty-five degrees, and the limiting rod can be inserted into the circular groove.
[0009] In the hanging basket for bridge decoration construction as claimed in the preceding description, optionally, a second rotating shaft is arranged at the center of the first clamping plate of the second end, limiting plates are fixedly installed at both ends of the second rotating shaft, a connecting plate is fixedly installed on the outer wall of the second rotating shaft, a rotating sleeve is sleeved on the outer wall of the second rotating shaft, a pushing plate is fixedly installed on the inner wall of the rotating sleeve, a second clamping plate is fixedly installed at the end of the rotating sleeve away from the first clamping plate, the third guide wheel is fixedly installed on the second clamping plate, and the rotating sleeve can be inserted into the circular groove.
[0010] In the hanging basket for bridge decoration construction as claimed in the preceding description, optionally, two pushing plates are arranged, first springs are fixedly installed on both side faces of the connecting plate, the first springs are fixedly installed on the pushing plates at the ends away from the connecting plate, and inclined blocks are fixedly installed on the bottom end outer wall of the right circular groove and the top end outer wall of the left circular groove, and the inclined blocks can be in contact with the outer wall of the second clamping plate.
[0011] In the hanging basket for bridge decoration construction as claimed in the preceding description, optionally, plug-in grooves are arranged at both ends of the rotating rod, a sliding rod is arranged between the rotating rod and the mounting rod, a plug rod is fixedly installed at the bottom end of the sliding rod, the plug rod is arranged in a C shape, the plug rod can be inserted into the plug-in groove, the outer wall of the sliding rod is attached to the outer wall of the suspension frame, limiting sleeves are fixedly installed at both ends of the suspension frame, and the sliding rod is slidingly installed in the limiting sleeve.
[0012] In the aforementioned hanging basket for bridge decoration construction, optionally, a connecting frame is fixedly installed at the top of the sliding rod, the outer wall of the connecting frame is in contact with the outer wall of the connecting rod, the connecting frame is fixedly connected to the second guide wheel, a moving rod is fixedly installed at the center of the top of the second guide wheel, the moving rod is slidably installed on the connecting rod, a second spring is sleeved on the outer wall of the moving rod, and the two ends of the second spring are respectively fixedly connected to the bottom end of the connecting rod and the top end of the second guide wheel.
[0013] This utility model discloses a hanging basket for bridge decoration construction, which adopts a suspension frame. A U-shaped frame is fixedly installed on the suspension frame, and the hanging basket is fixedly installed on the suspension frame. The suspension frame is provided with a first guide wheel and a second guide wheel, and a third guide wheel is detachably installed on the suspension frame. This enables the hanging basket to move back and forth without damaging the guardrail, and by switching the orientation of the third guide wheel, the stability of the suspension frame when moving on the ground and on the guardrail is facilitated. Attached Figure Description
[0014] The disclosure of this utility model will become more apparent with reference to the accompanying drawings. It should be understood that these drawings are for illustrative purposes only and are not intended to limit the scope of protection of this utility model. In the drawings:
[0015] Figure 1 This is a schematic diagram of a structure in which the third guide wheel is located on the right side of the suspension frame, according to an embodiment of the present invention.
[0016] Figure 2 This is a schematic diagram of a structure in which the third guide wheel is located on the left side of the suspension frame, according to an embodiment of the present invention.
[0017] Figure 3 This is a schematic diagram of the structure of Embodiment 2 of this utility model.
[0018] Figure 4 For the present utility model Figure 3 Enlarged view of point A in the middle.
[0019] Figure 5 This is a schematic diagram of the internal structure of the rotating sleeve of this utility model.
[0020] Figure 6 This is a schematic diagram of the rotating rod of this utility model.
[0021] Figure 7 This is a schematic diagram of the suspension frame in Embodiment 2 of this utility model.
[0022] Reference numerals in the attached drawings: 1. Suspension frame; 1-1. Connecting rod; 1-2. U-shaped frame; 1-3. Circular groove; 1-4. Mounting rod; 1-5. First rotating shaft; 1-6. Limiting sleeve; 1-7. Inclined block; 2. Hanging basket; 2-1. Tool basket; 3. First guide wheel; 4. Second guide wheel; 5. Third guide wheel; 6. Rotating rod; 6-1. First end; 6-2. Second end; 6-3. First snap-fit plate; 6-4. Second snap-fit plate; 6-5. Limiting rod; 6-6. Second rotating shaft; 6-61. Limiting plate; 6-62. Connecting plate; 6-63. Rotating sleeve; 6-64. Push plate; 6-65. First spring; 6-7. Insertion groove; 7. Sliding rod; 7-1. Insertion rod; 7-2. Connecting frame; 7-3. Moving rod; 7-4. Second spring. Detailed Implementation
[0023] The technical solutions in the embodiments of this utility model will be clearly and completely described below. Obviously, the described embodiments are only some embodiments of this utility model, and not all embodiments. Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of this utility model.
[0024] like Figure 1 and Figure 2 As shown in Embodiment 1, a hanging basket 2 for bridge decoration construction includes: a suspension frame 1, a hanging basket 2, a first guide wheel 3, a second guide wheel 4, and a third guide wheel 5; connecting rods 1-1 are fixedly installed on both sides of the top of the suspension frame 1, a U-shaped frame 1-2 is provided at the top of the suspension frame 1, and the two ends of the U-shaped frame 1-2 are respectively fixedly installed at the ends of the two connecting rods 1-1, the hanging basket 2 is fixedly installed at the bottom of the suspension frame 1, there are two first guide wheels 3, and the two first guide wheels 3 are respectively fixedly installed at the two ends of the U-shaped frame 1-2, and the first guide wheels 3 face the suspension frame 1, there are two second guide wheels 4, and the two second guide wheels 4 are respectively located below the two connecting rods 1-1, there are two third guide wheels 5, and the two third guide wheels 5 are both located on the suspension frame 1, and a tool basket 2-1 is provided on the side of the hanging basket 2, and the tool basket 2-1 is fixedly installed on the suspension frame 1.
[0025] When in use, the suspension frame 1 is placed on the crash barrier. At this time, the U-shaped frame 1-2 is located inside the crash barrier, and the suspension frame 1 is located outside the crash barrier. The first guide wheel 3 contacts the side of the crash barrier, the second guide wheel 4 contacts the top of the crash barrier, and the third guide wheel 5 can contact the outer wall of the bridge body, so that the suspension frame 1 is stably suspended on the crash barrier.
[0026] The other end of the worker's five-point safety harness is fixed to the top of the suspension frame 1 to ensure the worker's safety. When the worker is operating, he sits in the hanging basket 2 and the tools are placed on the tool basket 2-1 for easy access to the tools.
[0027] After the workers finish their work, the workers above push the suspended frame 1 to replace the work area.
[0028] The second guide wheel 4 is fixedly installed below the connecting rod 1-1, and the third guide wheel 5 is detachably installed on the suspension frame 1. When the third guide wheel 5 is installed on the right side of the suspension frame 1, the axis of the third guide wheel 5 is perpendicular to the vertical rod of the U-shaped frame 1-2. When the third guide wheel 5 is installed on the left side of the suspension frame 1, the axis of the third guide wheel 5 is parallel to the vertical rod of the U-shaped frame 1-2.
[0029] The third guide wheel 5 can be fixedly installed on the suspension frame 1 by bolts. When the third guide wheel 5 is installed on the right side of the suspension frame 1, it can facilitate the movement of the suspension frame 1 on the ground. At this time, the third guide wheel 5 can act as a transport wheel.
[0030] When the third guide wheel 5 is installed on the left side of the suspension frame 1, the third guide wheel 5 can contact the outer wall of the bridge body when the suspension frame 1 moves on the crash barrier, increasing the stability of the suspension frame 1 moving on the crash barrier.
[0031] The axis of the first guide wheel 3 is parallel to the vertical rod of the U-shaped frame 1-2, and the axis of the second guide wheel 4 is parallel to the connecting rod 1-1.
[0032] When the suspension frame 1 moves on the crash barrier, the first guide wheel 3 and the second guide wheel 4 can roll in the direction of movement of the suspension frame 1, which facilitates the movement of the suspension frame 1.
[0033] like Figures 3 to 7 As shown, in Embodiment 2, the second guide wheel 4 is slidably mounted on the connecting rod 1-1. Rotating rods 6 are provided on both sides of the suspension frame 1. The rotating rod 6 includes a first end 6-1 and a second end 6-2. The third guide wheel 5 is rotatably mounted on the first end 6-1. Circular grooves 1-3 are provided at both ends of both sides of the suspension frame 1. An installation rod 1-4 is fixedly installed between the circular grooves 1-3 on the same side. A first rotating shaft 1-5 is fixedly installed at the center of the installation rod 1-4. The center of the rotating rod 6 is sleeved outside the first rotating shaft 1-5.
[0034] When in use, if it is necessary to transport the suspension frame 1, the first end 6-1 is located on the right side of the suspension frame 1 to facilitate the transportation of the suspension frame 1. When the suspension frame 1 is transported to the construction site, the rotating rod 6 is slid outward. When the rotating rod 6 slides to the end of the first rotating shaft 1-5, the rotating rod 6 rotates, so that the first end 6-1 is located on the left side of the suspension frame 1, which facilitates the movement of the suspension frame 1 on the crash barrier.
[0035] A first snap-fit plate 6-3 is fixedly installed on both the first end 6-1 and the second end 6-2. A limit rod 6-5 is fixedly installed on the first snap-fit plate 6-3 of the second end 6-2. A second snap-fit plate 6-4 is fixedly installed on the end of the limit rod 6-5 away from the first snap-fit plate 6-3. The included angle between the first snap-fit plate 6-3 and the second snap-fit plate 6-4 is forty-five degrees. The limit rod 6-5 can be inserted into the circular groove 1-3.
[0036] When the rotating rod 6 slides on the first rotating shaft 1-5, the limiting rod 6-5 can be inserted into the circular groove 1-3, so that the rotating rod 6 is locked in the circumferential direction of the first rotating shaft 1-5, preventing the rotating rod 6 from deflecting when the third guide wheel 5 rotates, thus preventing the third guide wheel 5 from shaking.
[0037] A second rotating shaft 6-6 is provided at the center of the first snap-fit plate 6-3 at the second end 6-2. Limiting plates 6-61 are fixedly installed at both ends of the second rotating shaft 6-6. A connecting plate 6-62 is fixedly installed on the outer wall of the second rotating shaft 6-6. A rotating sleeve 6-63 is sleeved on the outer wall of the second rotating shaft 6-6. A push plate 6-64 is fixedly installed on the inner wall of the rotating sleeve 6-63. A second snap-fit plate 6-4 is fixedly installed at the end of the rotating sleeve 6-63 away from the first snap-fit plate 6-3. A third guide wheel 5 is fixedly installed on the second snap-fit plate 6-4. The rotating sleeve 6-63 can be inserted into the circular groove 1-3.
[0038] When the rotating sleeve 6-63 is inserted into the circular groove 1-3, the rotating sleeve 6-63 rotates relative to the second rotating shaft 6-6, so that the third guide wheel 5 can switch from a parallel state to a vertical state. At this time, the first snap-fit plate 6-3 and the second snap-fit plate 6-4 respectively contact the two sides of the circular groove 1-3, so that the rotating rod 6 can be stably installed on the suspension frame 1.
[0039] Two push plates 6-64 are provided. A first spring 6-65 is fixedly installed on both sides of the connecting plate 6-62. The end of the first spring 6-65 away from the connecting plate 6-62 is fixedly installed on the push plate 6-64. An inclined block 1-7 is fixedly installed on the bottom outer wall of the right circular groove 1-3 and the top outer wall of the left circular groove 1-3. The inclined block 1-7 can contact the outer wall of the second snap-fit plate 6-4.
[0040] When the rotating sleeve 6-63 is inserted into the circular groove 1-3, the two first springs 6-65 are not under force, and the third guide wheel 5 is tilted. When the rotating sleeve 6-63 is inserted into the circular groove 1-3, the first snap-fit plate 6-3 contacts the inclined block 1-7.
[0041] When the first snap plate 6-3 contacts the right inclined block 1-7, the lower push block compresses the first spring 6-65, so that the axis of the third guide wheel 5 is perpendicular to the vertical bar of the U-shaped frame 1-2, which facilitates the movement of the transport suspension frame 1 on the ground.
[0042] When the first snap-fit plate 6-3 contacts the left inclined block 1-7, the upper push block compresses the first spring 6-65, so that the axis of the third guide wheel 5 is parallel to the vertical bar of the U-shaped frame 1-2. At this time, it is convenient for the suspension frame 1 to move on the crash barrier and change the personal construction area.
[0043] Both ends of the rotating rod 6 are provided with insertion slots 6-7. A sliding rod 7 is provided between the rotating rod 6 and the mounting rod 1-4. An insertion rod 7-1 is fixedly installed at the bottom end of the sliding rod 7. The insertion rod 7-1 is C-shaped and can be inserted into the insertion slot 6-7. The outer wall of the sliding rod 7 fits against the outer wall of the suspension frame 1. Limit sleeves 1-6 are fixedly installed at both ends of the suspension frame 1. The sliding rod 7 is slidably installed in the limit sleeves 1-6.
[0044] When the sliding rod 7 slides within the limiting sleeve 1-6, it drives the insertion rod 7-1 to slide on the suspension frame 1, so that the insertion rod 7-1 can disengage from the insertion slot 6-7 and insert into the insertion slot 6-7.
[0045] When the insertion rod 7-1 is inserted into the insertion slot 6-7, it can lock the rotating rod 6 in the axial direction of the first rotating shaft 1-5, thereby increasing the stability of the rotating rod 6 on the suspension frame 1.
[0046] When the insertion rod 7-1 disengages from the insertion slot 6-7, the rotating rod 6 can slide on the first rotating shaft 1-5, which facilitates the rotation of the rotating rod 6 on the first rotating shaft 1-5 and switches the orientation of the third guide wheel 5.
[0047] A connecting frame 7-2 is fixedly installed at the top of the sliding rod 7. The outer wall of the connecting frame 7-2 is in contact with the outer wall of the connecting rod 1-1. The connecting frame 7-2 is fixedly connected to the second guide wheel 4. A moving rod 7-3 is fixedly installed at the center of the top of the second guide wheel 4. The moving rod 7-3 is slidably installed on the connecting rod 1-1. A second spring 7-4 is sleeved on the outer wall of the moving rod 7-3. The two ends of the second spring 7-4 are fixedly connected to the bottom end of the connecting rod 1-1 and the top end of the second guide wheel 4, respectively.
[0048] When the suspension frame 1 is not suspended on the protective frame, the second spring 7-4 is not under force, causing the moving rod 7-3 to slide on the connecting rod 1-1, causing the third guide wheel 5 to move towards the hanging basket 2. The third guide wheel 5 drives the connecting frame 7-2 to move. When the connecting frame 7-2 moves, it can drive the sliding rod 7 to move. The sliding rod 7 drives the insertion rod 7-1 to slide, so that the top of the insertion rod 7-1 is inserted into the insertion slot 6-7, locking the rotating rod 6 on the suspension frame 1. At this time, the third guide wheel 5 can act as a transport wheel, allowing the suspension frame 1 to move on the ground.
[0049] When the suspension frame 1 is suspended on the guardrail, the third guide wheel 5 is subjected to the gravity of the suspension frame 1, which compresses the second spring 7-4, causing the third guide wheel 5 to move away from the hanging basket 2. The third guide wheel 5 drives the connection to move. When the connecting frame 7-2 moves, it can drive the sliding rod 7 to move. The sliding rod 7 drives the insertion rod 7-1 to move, so that the bottom end of the insertion rod 7-1 is inserted into the insertion slot 6-7, locking the rotating rod 6 on the suspension frame 1. At this time, it is convenient for the third guide wheel 5 to move on the outer wall of the bridge body, improving the stability of the suspension frame 1 moving on the crash barrier.
[0050] Compared to Embodiment 1, Embodiment 2 features a third protective wheel that can automatically switch axial direction, a rotating rod 6 that can switch the direction of the third guide wheel 5 on both sides of the suspension frame 1, and a second guide wheel 4 that locks the rotating rod 6, making the third guide wheel 5 easy to move on the ground and on the crash barrier.
[0051] The technical scope of this utility model is not limited to the contents of the above description. Those skilled in the art can make various modifications and variations to the above embodiments without departing from the technical concept of this utility model, and all such modifications and variations should fall within the scope of this utility model.
Claims
1. A hanging basket for bridge decoration construction, characterized in that, include: The suspension frame (1), the hanging basket (2), the first guide wheel (3), the second guide wheel (4), and the third guide wheel (5) are provided. Connecting rods (1-1) are fixedly installed on both sides of the top of the suspension frame (1). A U-shaped frame (1-2) is provided at the top of the suspension frame (1). The two ends of the U-shaped frame (1-2) are respectively fixedly installed at the ends of the two connecting rods (1-1). The hanging basket (2) is fixedly installed at the bottom of the suspension frame (1). Two first guide wheels (3) are provided. The guide wheels (3) are fixedly installed at both ends of the U-shaped frame (1-2), and the first guide wheel (3) faces the suspension frame (1). There are two second guide wheels (4), which are respectively located below the two connecting rods (1-1). There are two third guide wheels (5), which are both located on the suspension frame (1). The side of the hanging basket (2) is provided with a tool basket (2-1), which is fixedly installed on the suspension frame (1).
2. The hanging basket for bridge decoration construction as described in claim 1, characterized in that, The second guide wheel (4) is fixedly installed below the connecting rod (1-1), and the third guide wheel (5) is detachably installed on the suspension frame (1). When the third guide wheel (5) is installed on the right side of the suspension frame (1), the axis of the third guide wheel (5) is perpendicular to the vertical rod of the U-shaped frame (1-2). When the third guide wheel (5) is installed on the left side of the suspension frame (1), the axis of the third guide wheel (5) is parallel to the vertical rod of the U-shaped frame (1-2).
3. The hanging basket for bridge decoration construction as described in claim 2, characterized in that, The axial direction of the first guide wheel (3) is parallel to the vertical rod of the U-shaped frame (1-2), and the axial direction of the second guide wheel (4) is parallel to the connecting rod (1-1).
4. The hanging basket for bridge decoration construction as described in claim 1, characterized in that, The second guide wheel (4) is slidably mounted on the connecting rod (1-1). The two sides of the suspension frame (1) are provided with rotating rods (6). The rotating rod (6) includes a first end (6-1) and a second end (6-2). The third guide wheel (5) is rotatably mounted on the first end (6-1). The two ends of both sides of the suspension frame (1) are provided with circular grooves (1-3). The circular grooves (1-3) on the same side are fixedly installed with mounting rods (1-4). The center of the mounting rod (1-4) is fixedly installed with a first rotating shaft (1-5). The center of the rotating rod (6) is sleeved on the outside of the first rotating shaft (1-5).
5. A hanging basket for bridge decoration construction as described in claim 4, characterized in that, A first snap-fit plate (6-3) is fixedly installed on both the first end (6-1) and the second end (6-2). A limit rod (6-5) is fixedly installed on the first snap-fit plate (6-3) of the second end (6-2). A second snap-fit plate (6-4) is fixedly installed on the end of the limit rod (6-5) away from the first snap-fit plate (6-3). The included angle between the first snap-fit plate (6-3) and the second snap-fit plate (6-4) is forty-five degrees. The limit rod (6-5) can be inserted into the circular groove (1-3).
6. A hanging basket for bridge decoration construction as described in claim 5, characterized in that, A second rotating shaft (6-6) is provided at the center of the first snap-fit plate (6-3) at the second end (6-2). Limiting plates (6-61) are fixedly installed at both ends of the second rotating shaft (6-6). A connecting plate (6-62) is fixedly installed on the outer wall of the second rotating shaft (6-6). A rotating sleeve (6-63) is sleeved on the outer wall of the second rotating shaft (6-6). A push plate (6-64) is fixedly installed on the inner wall of the rotating sleeve (6-63). A second snap-fit plate (6-4) is fixedly installed at the end of the rotating sleeve (6-63) away from the first snap-fit plate (6-3). The third guide wheel (5) is fixedly installed on the second snap-fit plate (6-4). The rotating sleeve (6-63) can be inserted into the circular groove (1-3).
7. A hanging basket for bridge decoration construction as described in claim 6, characterized in that, Two push plates (6-64) are provided. A first spring (6-65) is fixedly installed on both sides of the connecting plate (6-62). The end of the first spring (6-65) away from the connecting plate (6-62) is fixedly installed on the push plate (6-64). An inclined block (1-7) is fixedly installed on the bottom outer wall of the circular groove (1-3) on the right side and the top outer wall of the circular groove (1-3) on the left side. The inclined block (1-7) can contact the outer wall of the second snap-fit plate (6-4).
8. A hanging basket for bridge decoration construction as described in claim 4, characterized in that, Both ends of the rotating rod (6) are provided with insertion slots (6-7). A sliding rod (7) is provided between the rotating rod (6) and the mounting rod (1-4). A plug rod (7-1) is fixedly installed at the bottom end of the sliding rod (7). The plug rod (7-1) is C-shaped and can be inserted into the insertion slot (6-7). The outer wall of the sliding rod (7) is in contact with the outer wall of the suspension frame (1). Both ends of the suspension frame (1) are fixedly installed with limit sleeves (1-6). The sliding rod (7) is slidably installed in the limit sleeves (1-6).
9. A hanging basket for bridge decoration construction as described in claim 8, characterized in that, A connecting frame (7-2) is fixedly installed at the top of the sliding rod (7). The outer wall of the connecting frame (7-2) is in contact with the outer wall of the connecting rod (1-1). The connecting frame (7-2) is fixedly connected to the second guide wheel (4). A moving rod (7-3) is fixedly installed at the center of the top of the second guide wheel (4). The moving rod (7-3) is slidably installed on the connecting rod (1-1). A second spring (7-4) is sleeved on the outer wall of the moving rod (7-3). The two ends of the second spring (7-4) are respectively fixedly connected to the bottom end of the connecting rod (1-1) and the top end of the second guide wheel (4).