Packing deicing device of circulating water cooling tower
By using an extension pipe and jet nozzle design in the circulating water cooling tower, high-temperature water vapor injection is used to eliminate packing ice formation, solving the problems of packing tearing and limited personnel ice-breaking capabilities, and improving facility safety.
Patent Information
- Application Number
- CN202520429721.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-12
- Publication Date
- 2026-01-23
- Estimated Expiration
- 2035-03-12
AI Technical Summary
When circulating water cooling towers are operating in winter, ice easily forms under the packing material, which can cause the packing material to tear and restrict personnel from breaking the ice, posing a safety hazard.
Design a de-icing device for the packing of a circulating water cooling tower, comprising an extension pipe, a jet pipe and a jet hole, which reduces icing by spraying high-temperature water vapor, avoiding packing tearing and restrictions on personnel knocking ice.
It effectively prevents the packing material from freezing and tearing, reduces the impact of icing on the safe operation of the facility, and ensures the safety of personnel and equipment.
Smart Images

Figure CN223826820U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of de-icing technology, and more specifically, to a de-icing device for packing material in a circulating water cooling tower. Background Technology
[0002] During the winter operation of the first and second phase circulating water systems, ice often forms on some baffles and under the packing material of the cooling tower. The distance between the water pool and the ice formation is relatively far, making manual ice removal difficult and posing a safety hazard to production.
[0003] Therefore, there is an urgent need for a de-icing device for the packing material of a circulating water cooling tower to solve the above problems. Utility Model Content
[0004] To overcome the aforementioned deficiencies of the prior art, embodiments of this utility model provide a de-icing device for the packing of a circulating water cooling tower. By incorporating an extension pipe, a jet pipe, and jet holes, this utility model avoids the problems of packing tearing caused by icing and limitations on personnel ice removal, thereby reducing the impact of icing on the safe operation of the facility and ensuring the safety of personnel and equipment, thus solving the problems mentioned in the background art.
[0005] To achieve the above objectives, this utility model provides the following technical solution: a circulating water cooling tower packing de-icing device, comprising a conversion and synthesis manifold, a connecting pipe fixedly installed at one end of the conversion and synthesis manifold, an extension pipe fixedly installed at the end of the connecting pipe away from the conversion and synthesis manifold, an air jet pipe fixedly installed at one end of the extension pipe, and multiple air jet holes provided on the air jet pipe.
[0006] In a preferred embodiment, the plurality of jet holes are evenly distributed on the jet pipe.
[0007] The technical effects and advantages of this utility model are as follows:
[0008] This invention, by incorporating an extension pipe, an air jet pipe, and air jet holes, avoids the problems of packing tearing caused by icing and limitations on personnel ice removal, thereby reducing the impact of icing on the safe operation of the facility and ensuring the safety of personnel and equipment. Attached Figure Description
[0009] Figure 1 This is a schematic diagram of the overall structure of this utility model.
[0010] The attached diagram is labeled as follows: 1. Conversion and synthesis manifold; 2. Connecting pipe; 3. Extension pipe; 4. Jet pipe; 5. Jet hole. Detailed Implementation
[0011] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0012] As attached Figure 1 As shown, this utility model provides a de-icing device for the packing of a circulating water cooling tower, including a conversion and synthesis manifold 1. A connecting pipe 2 is fixedly installed at one end of the conversion and synthesis manifold 1. An extension pipe 3 is fixedly installed at the end of the connecting pipe 2 away from the conversion and synthesis manifold 1. An air jet pipe 4 is fixedly installed at one end of the extension pipe 3. A plurality of air jet holes 5 are provided on the air jet pipe 4.
[0013] Multiple jet holes 5 are evenly distributed on the jet pipe 4.
[0014] The specific implementation method is as follows: When using this utility model, the conversion and synthesis pipe 1 is extended to the part that is prone to freezing through the extension pipe 3 and the jet pipe 4, and a certain number of jet holes 5 are added to the jet pipe 4. The high temperature water vapor can reduce freezing. This utility model avoids the problems of packing tearing caused by freezing and the limitation of personnel knocking ice, reduces the impact of freezing on the safe operation of the facility, and ensures the safety of personnel and equipment.
[0015] Working principle of this utility model:
[0016] Refer to the instruction manual appendix Figure 1 When using this utility model, by providing structures such as extension pipe 3, air jet pipe 4 and air jet hole 5, this utility model avoids the problems of packing tearing caused by icing and the limitation of personnel knocking ice, reduces the impact of icing on the safe operation of facilities, and ensures the safety of personnel and equipment.
[0017] Finally, the following points should be noted: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installation", "connection", and "linkage" should be interpreted broadly, and can be mechanical or electrical connections, or internal connections between two components, or direct connections. "Up", "down", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may change.
[0018] Secondly: The accompanying drawings of the embodiments disclosed in this utility model only involve the structures involved in the embodiments disclosed in this utility model. Other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of this utility model can be combined with each other.
[0019] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. A circulating water cooling tower packing ice melting device, comprising a conversion synthetic parallel pipe (1), characterized in that: The conversion synthesis parallel pipe (1) one end is fixedly installed with the connecting pipe (2), the connecting pipe (2) is fixedly installed with the extension pipe (3) away from the conversion synthesis parallel pipe (1) one end, the extension pipe (3) one end is fixedly installed with the jet pipe (4), the jet pipe (4) is provided with a plurality of jet holes (5).
2. The ice melting device for a cooling tower packing of a circulating water system according to claim 1, characterized in that: Multiple the jet hole (5) evenly distributes on the jet pipe (4).