Gypsum self-leveling mortar setting time testing device
By designing a setting time testing device for gypsum self-leveling mortar, and using an ohmmeter and wires to detect changes in the conductivity of the gypsum self-leveling mortar, the problem of complex testing and poor accuracy in existing technologies is solved, and efficient and accurate setting time measurement is achieved.
Patent Information
- Application Number
- CN202520146377.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-22
- Publication Date
- 2026-01-30
- Estimated Expiration
- 2035-01-22
AI Technical Summary
Existing gypsum self-leveling mortar setting time testing devices are complex to operate, making it difficult to conduct multiple tests simultaneously. They also rely on the subjective judgment of the test operator, resulting in low testing efficiency and poor accuracy.
A device for testing the setting time of gypsum self-leveling mortar was designed. It uses an ohmmeter and wires to detect changes in the conductivity of the gypsum self-leveling mortar and records the setting time with a timer, simplifying the operation process and reducing the influence of subjective judgment.
It enables efficient and accurate testing of the setting time of gypsum self-leveling mortar, simplifies the operation steps, and improves the reliability and accuracy of the test.
Smart Images

Figure CN223856971U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of gypsum self-leveling mortar testing, particularly relates to a gypsum self-leveling mortar setting time testing device. BACKGROUND
[0002] Setting time is one of the basic parameters of gypsum physical performance, can directly show the influence of gypsum standard consistency water consumption, additive, impurity etc.
[0003] At present, the setting time of gypsum self-leveling mortar is tested by using a vicat apparatus, the operation of the vicat apparatus is relatively complex, a test operator is difficult to simultaneously carry out multiple tests, the efficiency is low, and the accuracy is relatively poor because the test operator is relatively dependent on subjective judgment. UTILITY MODEL CONTENT
[0004] The utility model mainly solves the technical problem to provide a gypsum self-leveling mortar setting time testing device, carries out the efficient test of the setting time of gypsum self-leveling mortar, reduces the dependence on subjective judgment of test operator, and improves the operation convenience and accuracy.
[0005] To solve the above technical problems, one of the technical schemes of the utility model is to provide a gypsum self-leveling mortar setting time testing device, which comprises: an insulating container, a timer, an ohmmeter, a positive electrode lead and a negative electrode lead, the insulating container is filled with gypsum self-leveling mortar, the gypsum self-leveling mortar is provided with a first test point and a second test point, the first end of the positive electrode lead is connected with the positive electrode of the ohmmeter, the tail end of the positive electrode lead is directly or indirectly electrically connected with the first test point, the first end of the negative electrode lead is connected with the negative electrode of the ohmmeter, and the tail end of the negative electrode lead is directly or indirectly electrically connected with the second test point.
[0006] In one preferred embodiment of the utility model, the insulating container is placed on the base.
[0007] In one preferred embodiment of the utility model, the base is provided with lead supports corresponding to the positive electrode lead and the negative electrode lead on both sides of the insulating container.
[0008] In a preferred embodiment of the utility model, the wire support includes a stand, a cantilever, an insulating tube and a conductive probe, the stand is vertically arranged on the base, the cantilever is arranged on the stand in a liftable manner and extends horizontally above the insulating container, the insulating tube is vertically arranged on the cantilever and above the corresponding first test point or second test point, the conductive probe is arranged in the insulating tube and extends downward, and the top of the conductive probe is connected with the tail end of the corresponding positive wire or negative wire.
[0009] In a preferred embodiment of the utility model, a first nut is arranged below the cantilever on the stand, a sliding groove is arranged on the cantilever and corresponds to the insulating tube, the insulating tube vertically penetrates the sliding groove, and a second nut is arranged above and below the cantilever on the insulating tube.
[0010] In a preferred embodiment of the utility model, the distance between the first test point and the second test point is not less than 2 cm.
[0011] In a preferred embodiment of the utility model, the vertical distance between the first test point and the second test point and the bottom surface of the gypsum self-leveling mortar is not less than one third of the height of the gypsum self-leveling mortar.
[0012] In a preferred embodiment of the utility model, the insulating container is an insulating glass cup, an insulating plastic cup or an insulating ceramic cup.
[0013] In a preferred embodiment of the utility model, the timer and the ohmmeter are arranged on the base.
[0014] The gypsum self-leveling mortar setting time testing device has the advantages that: the gypsum self-leveling mortar setting time testing device fully utilizes the principle that the gypsum self-leveling mortar is no longer conductive after setting and hardening, detects and times the conductivity of the stirred gypsum self-leveling mortar by cooperation of the ohmmeter, the positive wire and the negative wire, the reading of the ohmmeter is reset to zero, the timing of the timer is ended, and the setting time of the mortar is obtained, so that the operation is simple and efficient, the adverse effects of subjective judgment of the test operator on the test results are reduced, and the testing accuracy is ensured. BRIEF DESCRIPTION OF DRAWINGS
[0015] In order to more clearly illustrate the technical solutions in the embodiments of the utility model, the following will briefly introduce the drawings needed to be used in the embodiment description, and obviously, the drawings in the following description are only some embodiments of the utility model, and for those skilled in the art, other drawings can be obtained from these drawings without creative labor, wherein:
[0016] Figure 1It is a structure schematic view of a preferable embodiment of the gypsum self-leveling mortar setting time testing device of the utility model,
[0017] Figure 2 It is Figure 1 The structure schematic view after the cantilever rises. Specific embodiments
[0018] The technical solutions in the embodiments of the utility model will be clearly and completely described below, obviously, the described embodiments are only a part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by the person skilled in the art without creative labor belong to the protection scope of the utility model.
[0019] Please refer to Figures 1-2 The utility model embodiment includes:
[0020] As Figure 1 The gypsum self-leveling mortar setting time testing device shown in the figure, including: insulating container 5, timer 3, ohmmeter 4, positive lead 6, negative lead 7 and base 1, the insulating container 5 is injected with gypsum self-leveling mortar 9, the gypsum self-leveling mortar 9 can be first stirred by the stirrer, then immediately inject into the insulating container 5, the gypsum self-leveling mortar 9 at this time has certain conductivity.
[0021] The gypsum self-leveling mortar setting hardens and no longer conducts electricity, and the setting time test can be carried out by using this principle. In the embodiment, the insulating container 5 adopts insulating glass cup, insulating plastic cup or insulating ceramic cup, which has good insulating effect and avoids adverse effects on the test.
[0022] The gypsum self-leveling mortar 9 is provided with first test point A and second test point B, in the embodiment, the distance between the first test point A and the second test point B is not less than 2cm, avoiding the short circuit problem in the test process. The vertical distance between the first test point A and the second test point B and the bottom surface of the gypsum self-leveling mortar 9 is not less than one third of the height of the gypsum self-leveling mortar, the first test point A and the second test point B are away from the bottom surface of the gypsum self-leveling mortar 9, which ensures the accuracy of the test.
[0023] The insulating container 5 is placed on the base 1, the base 1 is provided with lead support 2 on both sides of the insulating container 5 and corresponding to the positive lead 6 and the negative lead 7, as Figure 2 The positive lead 6 and the negative lead 7 are supported by the lead support 2. In the embodiment, the timer 3 and the ohmmeter 4 are placed on the base 1, which is convenient to carry and compact in structure.
[0024] As Figure 1As shown, the head end of the positive electrode lead 6 is connected to the positive electrode of the ohmmeter 4, the tail end of the positive electrode lead 6 is directly or indirectly electrically connected to the first test point A, the head end of the negative electrode lead 7 is connected to the negative electrode of the ohmmeter 4, and the tail end of the negative electrode lead 7 is directly or indirectly electrically connected to the second test point B. Before the gypsum self-leveling mortar 9 is hardened, the gypsum self-leveling mortar between the first test point A and the second test point B can conduct electricity. The ohmmeter 4 is used to test whether there is current between the first test point A and the second test point B, which can reflect the setting process of the gypsum self-leveling mortar.
[0025] The timer 3 starts timing from the time when the gypsum self-leveling mortar 9 is injected into the insulating container 5, and the timing of the timer 3 ends when the ohmmeter 4 reading is zero. The setting time of the gypsum self-leveling mortar 9 can be obtained through the timer 3.
[0026] In order to improve the operation simplicity, as shown, Figure 1 The lead support 2 includes a column 12, a cantilever 11, an insulating tube 14 and a conductive probe 8. The column 12 is vertically arranged on the base 1 and can be fixed by bolts or welding. The structure is stable.
[0027] The cantilever 11 is arranged on the column 12 in a lifting manner and extends horizontally above the insulating container 5. In this embodiment, a first nut 13 is arranged below the cantilever 11 on the column 12. The first nut 13 cooperates with the external threads on the column 12 to limit the downward movement of the cantilever 11 and adjust the height of the position.
[0028] The insulating tube 14 is vertically arranged on the cantilever 11 and above the corresponding first test point A or second test point B. As shown, Figure 1 The insulating tubes 14 of the lead supports 2 on both sides correspond to the first test point A and the second test point B one by one.
[0029] The conductive probe 8 is arranged in the insulating tube 14 and extends downward. The insulating tube 14 can be injection molded with insulating plastic and wrapped around part of the conductive probe 8, improving the structural stability. In this embodiment, the cantilever 11 is provided with a sliding groove 10 extending along the length thereof and corresponding to the insulating tube 14. The insulating tube 14 vertically penetrates the sliding groove 10, facilitating the lateral adjustment of the insulating tube 14 and changing the distance between the conductive probes 8 on both sides to adapt to the position changes of the first test point A and the second test point B.
[0030] A second nut 15 is arranged on the insulating tube 14 above and below the cantilever 11. The second nut 15 cooperates with the external threads on the insulating tube 14 to fix the insulating tube 14 after adjustment, and the structure is firm. As shown, Figure 1 The top of the conductive probe on the right side is connected to the tail end of the positive electrode lead 6, and the top of the conductive probe on the left side is connected to the tail end of the negative electrode lead 7.Figure 2 The conductive probes on both sides are inserted into the corresponding first test point A and second test point B after moving down with the cantilever 11, the current between the first test point A and the second test point B is detected, the setting process of the gypsum self-leveling mortar is reflected, and the first nut 13 is used for limiting, so that the continuous downward movement of the conductive probe is avoided, and the setting of the gypsum self-leveling mortar is not affected.
[0031] In conclusion, the gypsum self-leveling mortar setting time testing device is simple to operate, can test the gypsum self-leveling mortar setting time, ensures the accuracy of the test, and reduces the adverse effects of subjective judgment of the test operator on the test results.
[0032] The above is only an embodiment of the utility model, and does not limit the patent range of the utility model, and any equivalent structure or equivalent process conversion according to the content of the utility model specification, or direct or indirect application in other related technical fields, is also included in the patent protection range of the utility model.
Claims
1. A gypsum self-leveling mortar setting time testing device for setting time testing of a gypsum self-leveling mortar, characterized by, The application relates to a gypsum self-leveling mortar test device, which comprises an insulating container, a timer, an ohmmeter, a positive electrode lead and a negative electrode lead, the insulating container is filled with gypsum self-leveling mortar, first and second test points are arranged in the gypsum self-leveling mortar, the head of the positive electrode lead is connected with the positive electrode of the ohmmeter, the tail of the positive electrode lead is directly or indirectly connected with the first test point, the head of the negative electrode lead is connected with the negative electrode of the ohmmeter, and the tail of the negative electrode lead is directly or indirectly connected with the second test point. The application further comprises a base, and the insulating container is placed on the base.
2. The gypsum self-leveling mortar set time testing device according to claim 1, characterized in that, Wire supports corresponding to the positive electrode lead and the negative electrode lead are arranged on the base and located on both sides of the insulating container.
3. The gypsum self-leveling mortar set time testing device according to claim 2, characterized in that, The wire support comprises a vertical column, a cantilever, an insulating tube and a conductive probe, the vertical column is vertically arranged on the base, the cantilever is arranged on the vertical column in a lifting mode and horizontally extends above the insulating container, the insulating tube is vertically arranged on the cantilever and located above the corresponding first or second test point, the conductive probe is arranged in the insulating tube and extends downward, and the top of the conductive probe is connected with the tail of the corresponding positive electrode lead or negative electrode lead.
4. The gypsum self-leveling mortar set time testing device according to claim 3, characterized in that, A first nut is arranged below the cantilever on the vertical column, a sliding groove extending along the length of the cantilever and corresponding to the insulating tube is arranged on the cantilever, the insulating tube vertically penetrates the sliding groove, and a second nut is arranged above and below the cantilever on the insulating tube.
5. The gypsum self-leveling mortar set time testing device according to claim 4, characterized in that, The distance between the first and second test points is not less than 2 cm.
6. The gypsum self-leveling mortar set time testing device according to claim 1, characterized in that, The vertical distance between the first and second test points and the bottom surface of the gypsum self-leveling mortar is not less than one third of the height of the gypsum self-leveling mortar.
7. The gypsum self-leveling mortar set time testing device according to claim 1, characterized in that, The insulating container is an insulating glass cup, an insulating plastic cup or an insulating ceramic cup.
8. The gypsum self-leveling mortar set time testing device according to claim 1, characterized in that, The timer and the ohmmeter are placed on the base.
9. The gypsum self-leveling mortar set time testing device of claim 2, wherein,