Substrate glass hot state emergency repair spare part box

By designing a hot emergency repair spare parts box for substrate glass, the problem of unreasonable storage of traditional repair spare parts was solved, enabling quick access to bolts and improving repair efficiency and safety.

CN223863750UActive Publication Date: 2026-02-03RAINBOW (HEFEI) LIQUID CRYSTAL GLASS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520182861.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-02-06
Publication Date
2026-02-03
Estimated Expiration
2035-02-06

AI Technical Summary

Technical Problem

The traditional methods of storing and retrieving spare parts are unreasonable, which leads to longer maintenance time and affects production efficiency and safety.

Method used

A hot emergency repair spare parts box for substrate glass was designed, which includes multiple storage slots and storage components. Bolts are placed parallel to each other along their length. A gap is reserved between the storage slots and the box body to facilitate hand operation. Combined with an adjustment component, the bolts can be quickly retrieved.

Benefits of technology

This improved the efficiency of bolt retrieval, shortened maintenance time, and ensured operational safety and production continuity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223863750U_ABST
    Figure CN223863750U_ABST
Patent Text Reader

Abstract

The utility model discloses a substrate glass hot state emergency repair spare part box which comprises a box body, first storage grooves and first containing pieces, the first storage grooves are formed in the box body, the first containing pieces are fixedly installed on the first storage grooves, and a plurality of first containing grooves are formed in the first containing pieces. The upper end face of the first containing piece and the upper end face of the box body are located on the same horizontal plane, a first gap is formed between the lower end face of the first containing piece and a groove body of the first containing groove, and the first bolts are placed in the first containing grooves in a one-to-one correspondence and matched mode. The length direction of the first bolts is parallel to the height direction of the box body, and the second storage groove is formed in the box body. According to the utility model, parts can be conveniently taken and placed by hands of a user, and the required parts can be quickly found and taken, so that the maintenance time is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of spare parts box technology, and in particular to a hot emergency repair spare parts box for substrate glass. Background Technology

[0002] In the production of substrate glass, equipment such as furnaces, conveyors, and forming processes at the hot end operate continuously in harsh environments, resulting in a high failure rate. Once equipment malfunctions, prompt and rapid maintenance and repair are crucial to ensure the safe operation of continuous equipment. However, traditional methods of storing and retrieving spare parts present numerous problems, severely impacting maintenance efficiency and operational safety.

[0003] In terms of accessing spare parts for maintenance, due to the lack of reasonable storage and organization design, maintenance personnel often find it difficult to quickly locate the required spare parts such as bolts during emergency repairs, resulting in extended maintenance time, increased equipment downtime, and consequently, reduced production efficiency and economic losses for the company. Utility Model Content

[0004] In order to solve the technical problems existing in the background art, this utility model proposes a hot emergency repair spare parts box for substrate glass.

[0005] This utility model proposes a hot emergency repair spare parts box for substrate glass, comprising: a box body, a first storage tank, and a first storage component. The first storage tank is formed on the box body, and the first storage component is fixedly installed on the first storage tank. The first storage component has multiple first storage slots inside. The upper end surface of the first storage component is on the same horizontal plane as the upper end surface of the box body, and the lower end surface of the first storage component has a first gap with the slot of the first storage tank.

[0006] Preferably, it further includes: a plurality of first bolts, which are placed in a plurality of first storage slots in a one-to-one correspondence, and the length direction of the plurality of first bolts is parallel to the height direction of the box.

[0007] Preferably, it further includes: a second storage tank and a second storage component, the second storage tank being formed on the box body, the second storage component being fixedly installed on the second storage tank, the second storage component having multiple second storage slots inside, the upper end face of the second storage component being on the same horizontal plane as the upper end face of the box body, and the lower end face of the second storage component having a second gap with the slot of the second storage tank.

[0008] Preferably, it further includes: a plurality of second bolts, which are placed in a plurality of second storage slots in a one-to-one correspondence, and the length direction of the plurality of second bolts is parallel to the height direction of the box.

[0009] Preferably, it further includes: a third storage tank and a plate, the third storage tank being formed on the box body, the plate being horizontally installed in the third storage tank, and the plate having an installation groove inside.

[0010] Preferably, it further includes: a first tube, a second tube, and a rod. The first tube and the second tube are installed on the outer wall of the box. The length direction of the first tube and the second tube is parallel to the height direction of the box. The two ends of the rod are respectively inserted into the first tube and the second tube. An adjusting element is provided between the rod and the first tube and the second tube.

[0011] Preferably, the adjusting component includes: a first screw and a first rotating rod, the length direction of the first screw is perpendicular to the length direction of the first tube, the first screw is adapted to be installed on the first tube and abuts against the outer wall of the rod inserted into the first tube, and the end of the first screw is also fixedly installed with a first rotating rod.

[0012] Preferably, the adjusting component further includes: a second screw and a second rotating rod, wherein the length direction of the second screw is perpendicular to the length direction of the second tube, the second screw is adapted to be installed on the second tube and abuts against the outer wall of the rod inserted into the second tube, and a second rotating rod is fixedly installed at the end of the second screw.

[0013] This utility model proposes a hot emergency repair spare parts box for substrate glass. Its advantages are: multiple first bolts are placed in a first storage slot, and a first gap is reserved between the lower end face of the first storage component and the groove body of the first storage slot, facilitating the user's hand to reach in and retrieve the first bolts. This allows for quick location and retrieval of the required bolts, saving repair time. Similarly, multiple second bolts are placed in a second storage slot, and a second gap is reserved between the lower end face of the second storage component and the groove body of the second storage slot, facilitating hand access and retrieval of the second bolts, improving bolt retrieval efficiency and accelerating the repair process. Through the design of a first storage slot, a first storage component, a first storage slot, a second storage slot, a second storage component, and a second storage slot, different bolts are stored separately, making the items in the spare parts box more organized and orderly. This facilitates quick location and retrieval of the required bolts during emergency repairs, avoiding wasted time searching for bolts. The plate in the third storage tank has an installation groove inside, which can be used to place lubricant storage tanks, grease storage tanks or other tanks, to store the tanks separately from bolts and other spare parts, to prevent the tanks from rolling and colliding inside the box, to avoid damage or leakage, and also to facilitate the individual use of the tanks. Attached Figure Description

[0014] Figure 1 This is a top view of a hot emergency repair spare parts box for substrate glass proposed in this utility model;

[0015] Figure 2 This is a front view of a hot emergency repair spare parts box for substrate glass proposed in this utility model;

[0016] Figure 3 This is a side view of a hot emergency repair spare parts box for substrate glass proposed in this utility model. Detailed Implementation

[0017] refer to Figure 1-3 This utility model proposes a hot emergency repair spare parts box for substrate glass, comprising several key components including a box body 1, a first storage tank 2, and a first receiving component 21. The box body 1 serves as the main structure of the entire spare parts box, providing the mounting base and load-bearing space for other components. The first storage tank 2 is located on the box body 1, and its position and dimensions are designed to meet the storage requirements of specific spare parts. The first receiving component 21 is fixedly installed on the upper side of the first storage tank 2 using a welded connection method to ensure that it will not loosen or fall off during use.

[0018] The first storage component 21 has multiple first storage slots 22 inside. The upper surface of the first storage component 21 is on the same horizontal plane as the upper surface of the box body 1. This design not only ensures the flatness of the overall appearance of the spare parts box, but also facilitates the operation when placing or retrieving items. It is worth mentioning that a certain distance is intentionally maintained between the lower surface of the first storage component 21 and the slot of the first storage slot 22, thus forming a first gap.

[0019] It also includes multiple first bolts 23. These first bolts 23 are placed one-to-one in multiple first storage slots 22. The length direction of the multiple first bolts 23 is parallel to the height direction of the box body 1. This arrangement makes the bolts neat and orderly when stored, and easy to find and use. The first gap formed by the distance between the lower end face of the first storage component 21 and the groove of the first storage slot 22 is just the right size for the user's hand to easily reach in, so as to facilitate convenient and quick access to the first bolts 23 and improve the efficiency of emergency repairs.

[0020] Second storage compartment and related components: The spare parts box is also equipped with a second storage compartment 3 and a second storage component 31. The second storage compartment 3 is also located on the box body 1, cooperating with the first storage compartment 2 to enrich the storage function of the spare parts box. The second storage component 31 is securely fixed to the second storage compartment 3, and its internal structure is similar to that of the first storage component 21, having multiple second storage slots 32. These second storage slots 32 may differ from the first storage slots 22 in size and shape to accommodate the storage needs of different types of spare parts. Similarly, the upper end face of the second storage component 31 is at the same level as the upper end face of the box body 1, and the lower end face maintains a certain distance from the slot of the second storage compartment 32, thus forming a second gap.

[0021] The second bolt and ease of access: Multiple second bolts 33 are placed one-to-one in multiple second storage slots 32, with their length direction parallel to the height direction of the box body 1. Similar to the storage design of the first bolt 23, the second gap formed by the distance between the lower end face of the second storage component 31 and the groove of the second storage slot 32 fully considers the convenience of user hand operation, facilitating quick access to the second bolts 33 and ensuring that the required bolts can be quickly obtained in emergency repair situations.

[0022] Third Storage Tank and Plate Design: In addition, a third storage tank 4 and a plate 41 are provided. The third storage tank 4 is located on the housing 1 and is designed to provide a dedicated space for storing specific containers. The plate 41 is horizontally installed in the third storage tank 4, ensuring a tight and stable fit between the plate 41 and the third storage tank 4. An installation groove 42 is provided inside the plate 41. The dimensions of the installation groove 42 are measured to accommodate lubricant tanks, grease tanks, or other containers that may be used during emergency hot repairs of the substrate glass, providing a safe and stable storage location for these containers and preventing shaking or damage during transportation or use.

[0023] The external structure of the spare parts box includes a first tube 5, a second tube 6, and a rod 7. The first tube 5 and the second tube 6 are securely mounted on the outer wall of the box 1, with their length parallel to the height of the box 1. This arrangement not only ensures structural stability but also provides a reasonable guide for the installation of the rod 7. Both ends of the rod 7 are inserted into the first tube 5 and the second tube 6, respectively. In this way, the rod 7, the first tube 5, and the second tube 6 together form an adjustable structural assembly.

[0024] Detailed design of the adjusting component: To achieve precise adjustment of the position of the rod 7, an adjusting component 8 is provided between the rod 7 and the first tube 5 and the second tube 6. The adjusting component 8 includes a first screw 81 and a first rotating rod 82. The length direction of the first screw 81 is perpendicular to the length direction of the first tube 5, and the first screw 81 is fitted onto the first tube 5 through a threaded connection. When it is necessary to adjust the position of the rod 7, the user can rotate the first rotating rod 82 to drive the first screw 81 to rotate, thereby causing the first screw 81 to come into contact with the outer wall of the rod 7 inserted into the first tube 5. This contact force is used to achieve fine adjustment of the position of the rod 7 within the first tube 5.

[0025] The adjusting component 8 also includes a second screw 83 and a second rotating rod 84. The length direction of the second screw 83 is perpendicular to the length direction of the second tube 6, and it is also fitted onto the second tube 6 via a threaded connection. The end of the second screw 83 is fixedly mounted with the second rotating rod 84. By rotating the second rotating rod 84, the user can drive the second screw 83 to rotate, thereby causing the second screw 83 to abut against the outer wall of the rod 7 inserted into the second tube 6, thus adjusting the position of the rod 7 within the second tube 6. This dual-adjustment structure design makes the position adjustment of the rod 7 between the first tube 5 and the second tube 6 more flexible and precise, meeting the actual needs of different repair scenarios.

[0026] The above description is only a preferred embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any equivalent substitutions or changes made by those skilled in the art within the technical scope disclosed in the present utility model, based on the technical solution and concept of the present utility model, should be included within the protection scope of the present utility model.

Claims

1. A hot-state emergency repair spare parts box for substrate glass, characterized in that, include: The box body (1), the first storage tank (2) and the first storage component (21) are provided. The first storage tank (2) is opened on the box body (1). The first storage component (21) is fixedly installed on the first storage tank (2). The first storage component (21) has multiple first storage slots (22) inside. The upper end face of the first storage component (21) is on the same horizontal plane as the upper end face of the box body (1). The lower end face of the first storage component (21) has a first gap with the slot of the first storage slot (22).

2. The hot emergency repair spare parts box for substrate glass according to claim 1, characterized in that, Also includes: Multiple first bolts (23) are placed in multiple first storage slots (22) in a corresponding manner. The length direction of the multiple first bolts (23) is parallel to the height direction of the box (1).

3. The hot emergency repair spare parts box for substrate glass according to claim 1, characterized in that, Also includes: The second storage tank (3) and the second storage component (31) are provided. The second storage tank (3) is opened on the box body (1). The second storage component (31) is fixedly installed on the second storage tank (3). The second storage component (31) has multiple second storage slots (32) inside. The upper end face of the second storage component (31) is on the same horizontal plane as the upper end face of the box body (1). The lower end face of the second storage component (31) has a second gap with the slot of the second storage slot (32).

4. The hot emergency repair spare parts box for substrate glass according to claim 3, characterized in that, Also includes: Multiple second bolts (33) are placed in multiple second storage slots (32) in a corresponding manner. The length direction of the multiple second bolts (33) is parallel to the height direction of the box (1).

5. The hot emergency repair spare parts box for substrate glass according to claim 1, characterized in that, Also includes: The third storage tank (4) and the plate (41) are located on the box (1). The plate (41) is horizontally installed in the third storage tank (4). The plate (41) has an installation groove (42) inside.

6. The hot emergency repair spare parts box for substrate glass according to claim 1, characterized in that, Also includes: The first tube (5), the second tube (6), and the rod (7) are mounted on the outer wall of the box (1). The length direction of the first tube (5) and the second tube (6) is parallel to the height direction of the box (1). The two ends of the rod (7) are respectively inserted into the first tube (5) and the second tube (6). An adjusting element (8) is provided between the rod (7) and the first tube (5) and the second tube (6).

7. A hot emergency repair spare parts box for substrate glass according to claim 6, characterized in that, The adjusting component (8) includes a first screw (81) and a first rotating rod (82). The length direction of the first screw (81) is perpendicular to the length direction of the first tube (5). The first screw (81) is adapted to be installed on the first tube (5) and abuts against the outer wall of the rod (7) inserted into the first tube (5). The end of the first screw (81) is also fixedly installed with the first rotating rod (82).

8. The hot emergency repair spare parts box for substrate glass according to claim 7, characterized in that, The adjusting component (8) also includes: a second screw (83) and a second rotating rod (84). The length direction of the second screw (83) is perpendicular to the length direction of the second tube (6). The second screw (83) is adapted to be installed on the second tube (6) and abuts against the outer wall of the rod (7) inserted into the second tube (6). The end of the second screw (83) is also fixedly installed with the second rotating rod (84).