Efficient pipeline extending device of expanding excavation type vertical shaft heading machine

By using a high-efficiency pipeline extension device for expanded shaft tunneling machines, the extension pipe is lifted out using a pipeline installation platform and a cantilever crane, which solves the problem of low pipeline extension efficiency when the depth of the shaft tunneling machine increases, and realizes efficient pipeline installation and dismantling operations.

CN223867996UActive Publication Date: 2026-02-03CHINA THREE GORGES PROJECTS DEV CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520207508.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-02-10
Publication Date
2026-02-03
Estimated Expiration
2035-02-10

AI Technical Summary

Technical Problem

As the depth increases, the efficiency of pipeline extension and installation of shaft tunneling machines is low, which cannot meet the requirements of high-speed tunneling.

Method used

The system employs a high-efficiency pipeline extension device for an expanded shaft tunneling machine, which includes a pipeline installation platform, a pipeline storage bin, and a pipeline crane. The extension pipe is lifted out by a cantilever crane for installation, and the design incorporates guardrails and ladders to improve ease of operation.

Benefits of technology

It improves the pipeline extension efficiency of the shaft tunneling machine and meets the requirements of high-efficiency tunneling speed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223867996U_ABST
    Figure CN223867996U_ABST
Patent Text Reader

Abstract

The utility model discloses an efficient pipeline extension device of an expanding excavation type vertical shaft heading machine, which comprises a pipeline installation platform, a pipeline storage bin and a pipeline crane, the pipeline installation platform comprises a lower platform and an upper platform, the lower platform and the upper platform are connected into a whole through a structural member, the pipeline storage bin is installed on one side of the lower platform, and the pipeline crane is installed on the pipeline storage bin. The interior of the pipeline storage bin is used for storing extension pipes, and the pipeline crane is installed on the upper platform. The pipeline installation platform is used for allowing people to stand on so as to disassemble and install the pipeline of the expanding excavation type vertical shaft heading machine, the pipeline crane is used for hoisting out the extension pipe in the pipeline storage bin for installation, and through the structure, the pipeline extension efficiency of the vertical shaft heading machine is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of construction equipment technology for shaft tunneling machines, and in particular to a high-efficiency pipeline extension device for an enlarged shaft tunneling machine. Background Technology

[0002] When a shaft tunneling machine (MTM) is in operation, it needs to connect to an auxiliary system located at the top of the shaft via pipelines. However, as the vertical excavation depth of the MTM increases, the corresponding pipelines also increase in length. Conventional installation methods for pipeline extension and layout are inefficient and cannot meet the high-speed excavation requirements of the MTM. Therefore, the problem of efficient pipeline extension in shaft tunnels has become an urgent issue to be addressed. To this end, the technical personnel have provided an efficient pipeline extension device for enlarged-excavation MTMs, as described in this application. Utility Model Content

[0003] The purpose of this utility model is to provide a high-efficiency pipeline extension device for an expanded shaft tunneling machine. A pipeline installation platform is used for personnel to stand on in order to disassemble and install the pipeline of the expanded shaft tunneling machine. A pipeline crane is used to lift out the extension pipe from the pipeline storage bin for installation, thereby improving the efficiency of pipeline extension of the shaft tunneling machine.

[0004] To achieve the above objectives, this utility model provides a high-efficiency pipeline extension device for an expanded shaft tunneling machine, including a pipeline installation platform, a pipeline storage bin, and a pipeline crane. The pipeline installation platform includes a lower platform and an upper platform, which are connected as a whole by structural components. The pipeline storage bin is installed on one side of the lower platform and is used to store extension pipes. The pipeline crane is installed on the upper platform.

[0005] The pipeline hoist is a cantilever crane.

[0006] A first ladder is installed between the lower platform and the upper platform, and a second ladder extending downwards is installed on the lower platform.

[0007] The pipeline storage chamber is provided with a door on one side. The door consists of two hinged panels that are connected to the pipeline storage chamber. The two panels are connected by a latch. The pipeline storage chamber is equipped with multiple lower pipe clamps and / or upper pipe clamps.

[0008] The lower and upper platforms are each equipped with guardrails.

[0009] The pipeline of the expanding shaft tunneling machine includes a shaft wall fixing section, a hose section, and a platform fixing section. In use, the shaft wall fixing section is installed and fixed to the shaft wall, the platform fixing section is installed and fixed to the pipeline installation platform, the extension pipe is used to install to the lower end of the shaft wall fixing section, one end of the hose section is connected to the extension pipe, and the other end is connected to the platform fixing section.

[0010] The platform fixing section is fixedly installed at the bottom of the upper platform.

[0011] Compared with the prior art, this utility model has the following technical effects:

[0012] 1. The pipeline installation platform of this utility model is used for personnel to stand on in order to disassemble and install the pipeline of the expanded shaft tunneling machine. The pipeline storage compartment is used to store extension pipes. The pipeline crane is used to lift the extension pipes from the pipeline storage compartment for installation. Through the above structure, the efficiency of pipeline extension of the shaft tunneling machine is improved. Attached Figure Description

[0013] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the accompanying drawings used in the description of the embodiments or the prior art will be briefly introduced below.

[0014] Figure 1 This is a schematic diagram of the overall structure of this utility model.

[0015] Figure 2 This is a schematic diagram of the pipeline installation platform of this utility model.

[0016] Figure 3 This is a schematic diagram of the structure of the pipeline storage compartment of this utility model.

[0017] Figure 4 This is a schematic diagram of the pipeline structure of this utility model.

[0018] Figure label:

[0019] Pipeline installation platform 1, second ladder 11, first ladder 12, lower platform 13, upper platform 14;

[0020] Pipeline storage compartment 2, compartment door 21, latch 22, lower pipe clamp 23, upper pipe clamp 24;

[0021] Pipeline crane 3;

[0022] Pipeline 4, well wall fixing section 41, hose section 42, platform fixing section 43, upper connector 44, extension pipe 45, lower connector 46. Detailed Implementation

[0023] The embodiments of the present invention are described in detail below. Examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain the present invention, but should not be construed as limiting the present invention.

[0024] Example 1:

[0025] Please see Figure 1-4A high-efficiency pipeline extension device for an expanded shaft tunneling machine includes a pipeline installation platform 1, a pipeline storage bin 2, and a pipeline crane 3. The pipeline installation platform 1 includes a lower platform 13 and an upper platform 14, which are connected as a whole by structural components. The pipeline storage bin 2 is installed on one side of the lower platform 13 and is used to store extension pipes 45. The pipeline crane 3 is installed on the upper platform 14.

[0026] The pipeline installation platform 1 of this utility model is used for personnel to stand on in order to disassemble and install the pipeline 4 of the expanded shaft tunneling machine. The pipeline crane 3 is used to lift out the extension pipe 45 in the pipeline storage bin 2 for installation. Through the above structure, the pipeline extension efficiency of the shaft tunneling machine is improved to meet the requirements of the shaft tunneling machine's tunneling speed.

[0027] In this embodiment, the pipeline crane 3 is a cantilever crane.

[0028] To protect workers on the lower platform 13 and the upper platform 14 from falling, guardrails are installed on the edges of the lower platform 13 and the upper platform 14 respectively.

[0029] See Figure 1 , 4 The pipeline 4 of the expanding shaft tunneling machine includes a shaft wall fixing section 41, a hose section 42, and a platform fixing section 43. In use, the shaft wall fixing section 41 is installed and fixed to the shaft wall, and the platform fixing section 43 is installed and fixed to the pipeline installation platform 1. The extension pipe 45 is used to be installed at the lower end of the shaft wall fixing section 41. One end of the hose section 42 is connected to the extension pipe 45, and the other end is connected to the platform fixing section 43.

[0030] Specifically, the upper end of the well wall fixing section 41 and the extension pipe 45 are connected by an upper connector 44, and the lower end of the extension pipe 45 is connected to the hose section 42 by a lower connector 46. The upper connector 44 and the lower connector 46 are flange-connected structures, or they can be connected by a clamp structure similar to that used for fire water pipes.

[0031] Specifically, the platform fixing section 43 is fixedly installed at the bottom of the upper platform 14.

[0032] Example 2:

[0033] Based on Embodiment 1, to facilitate movement between the lower platform 13 and the upper platform 14, see [reference needed]. Figure 2 A first ladder 12 is installed between the lower platform 13 and the upper platform 14, and a second ladder 11 extending downwards is installed on the lower platform 13.

[0034] In use, the lower platform 13 is installed on the top of the expanded shaft tunneling machine via a metal bracket. The lower end of the second ladder 11 is fixed to the expanded shaft tunneling machine, and the upper end is fixed to the lower platform 13. The lower end of the first ladder 12 is fixed to the lower platform 13, and the upper end is fixed to the upper platform 14.

[0035] Example 3:

[0036] Based on Example 1 or Example 2, see Figure 3 A door 21 is provided on one side of the pipeline storage chamber 2. The door 21 consists of two hinged panels that are hinged to the pipeline storage chamber 2. The two panels of the door 21 can be opened and connected by a latch 22. Multiple lower pipe clamps 23 and / or upper pipe clamps 24 are installed inside the pipeline storage chamber 2. By providing the door 21, the lifting height of the extension pipe 45 is reduced.

[0037] When in use, after unlocking the latch 22, open the compartment door 21. After lifting the extension pipe 45 to a certain height by the pipeline hoist 3, the extension pipe 45 can be moved out of the pipeline storage compartment 2.

[0038] The latch 22 is existing technology. For example, one side of the compartment door 21 is equipped with a fixing tube, and the other side of the compartment door 21 is equipped with a bolt. When the bolt extends, it is inserted into the fixing tube, which can close both compartment doors 21.

[0039] The lower pipe clamp 23 and the upper pipe clamp 24 are existing technologies, such as a clamp structure consisting of two half rings. One half ring is welded and fixed to the pipeline storage chamber 2, and the other half ring is installed and connected to it by bolts. The extension pipe 45 is located between the two half rings.

[0040] The working principle or operation process of this utility model is as follows:

[0041] As the shaft boring machine gradually descends, when the curved extension pipe 42 in pipeline 4 approaches a straightened state, pipeline 4 is closed. The pipeline crane 3 on the pipeline installation platform 1 is rotated above the pipeline storage bin 2. The lock 22 and bin door 21 are manually opened. Workers stand on the lower platform 13 and upper platform 14 of the pipeline installation platform 1, loosening the lower clamp 23 and upper clamp 24 of one of the extension pipes 45. The extension pipe 45 is then lifted out using the pipeline crane 3. The pipeline crane 3 transports the extension pipe 45 to the location of the fixed section 41 on the shaft wall, disassembling the fixed section 41 from the flexible hose section 42. The extension pipe 45 is then connected between the fixed section 41 and the flexible hose section 42 and anchored to the shaft wall.

[0042] During the next installation, the new extension tube 45 will be installed between the previous extension tube 45 and the hose segment 42.

Claims

1. A high-efficiency pipeline extension device for an enlarged shaft tunneling machine, characterized in that: The system includes a pipeline installation platform (1), a pipeline storage bin (2), and a pipeline hoist (3). The pipeline installation platform (1) includes a lower platform (13) and an upper platform (14). The lower platform (13) and the upper platform (14) are connected as a whole by structural components. The pipeline storage bin (2) is installed on one side of the lower platform (13) and is used to store extension pipes (45). The pipeline hoist (3) is installed on the upper platform (14).

2. The high-efficiency pipeline extension device for an enlarged shaft tunneling machine according to claim 1, characterized in that: The pipeline crane (3) is a cantilever crane.

3. The high-efficiency pipeline extension device for an enlarged shaft boring machine according to claim 1, characterized in that: A first ladder (12) is installed between the lower platform (13) and the upper platform (14), and a second ladder (11) extending downwards is installed on the lower platform (13).

4. The high-efficiency pipeline extension device for an enlarged shaft boring machine according to claim 1, characterized in that: The pipeline storage chamber (2) is provided with a door (21) on one side. The door (21) consists of two hinged doors. The two doors (21) are connected to the pipeline storage chamber (2) by a latch (22). The pipeline storage chamber (2) is equipped with multiple lower pipe clamps (23) and / or upper pipe clamps (24).

5. The high-efficiency pipeline extension device for an enlarged shaft tunneling machine according to claim 1, characterized in that: The lower platform (13) and the upper platform (14) are respectively equipped with guardrails.

6. The high-efficiency pipeline extension device for an enlarged shaft tunneling machine according to claim 1, characterized in that: The pipeline (4) of the excavation shaft boring machine includes a shaft wall fixing section (41), a hose section (42) and a platform fixing section (43). In use, the shaft wall fixing section (41) is installed and fixed to the shaft wall, and the platform fixing section (43) is installed and fixed to the pipeline installation platform (1). The extension pipe (45) is used to be installed at the lower end of the shaft wall fixing section (41). One end of the hose section (42) is connected to the extension pipe (45), and the other end is connected to the platform fixing section (43).

7. The high-efficiency pipeline extension device for an enlarged shaft tunneling machine according to claim 6, characterized in that: The platform fixing section (43) is fixedly installed at the bottom of the upper platform (14).