Centralized supply management goods shelf for capital construction engineering materials

By designing components such as telescopic racks with sliding guardrails and electric push rods on the shelves, the problems of goods slipping and stability are solved, achieving convenient loading and improved safety.

CN223920207UActive Publication Date: 2026-02-17龚锡元 +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520063903.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-10
Publication Date
2026-02-17
Estimated Expiration
2035-01-10

AI Technical Summary

Technical Problem

The existing centralized supply management racks for infrastructure construction materials lack guardrails, which makes goods easy to slip off, posing a safety hazard and reducing the stability of the racks.

Method used

A shelf with sliding guardrails was designed to achieve loading and protection of goods through components such as telescopic frames, electric push rods and protective shells. The telescopic frames and electric push rods are used to adjust the space size, and the protective shells and tilt sensors are combined to improve safety.

Benefits of technology

It facilitates cargo loading and protection, enhances the stability and safety of the shelving, and improves operational efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223920207U_ABST
    Figure CN223920207U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of capital construction engineering materials, in particular to a centralized supply management goods shelf for capital construction engineering materials. The centralized supply management goods shelf for the infrastructure engineering materials comprises a first butt joint frame, universal wheels, first containing plates, a second butt joint frame, second containing plates and sliding plates, the first containing plates are evenly connected to the interior of the first butt joint frame at intervals, and the second butt joint frame is arranged on the right side of the first butt joint frame. Universal wheels are rotationally connected to the bottoms of the first butt-joint frame and the second butt-joint frame in a front-back symmetry mode, a plurality of second containing plates are evenly connected into the second butt-joint frame at intervals, and sliding plates are connected to the left side faces of the three second containing plates. By means of the telescopic frames installed on the first butt joint frame and the second butt joint frame, when goods need to be loaded, fixing pins can be pulled, fixing of the telescopic frames is canceled, then connecting plates can be pulled, the telescopic frames are made to slide, the telescopic frames are opened, and then workers can load the goods conveniently.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the field of infrastructure engineering material, especially to a centralized supply management shelf for infrastructure engineering material. BACKGROUND

[0002] The centralized supply management shelf for infrastructure engineering material is a material storage and distribution system specially designed for construction sites or infrastructure construction sites. The design purpose of this shelf is to improve construction efficiency, optimize space use, ensure material safety, and facilitate inventory management and material tracking.

[0003] In the existing shelf design, there is usually no protective fence on both sides. Although this design simplifies the placement and removal of goods and improves operational efficiency, it also brings a series of safety hazards. Without the protection of the protective fence, goods are prone to slide off from the side during handling or when subjected to slight vibration, which not only may cause damage to the goods, but also may pose a safety threat to the surrounding personnel. Especially when stacking high goods, the lack of lateral support will weaken the overall stability of the shelf and increase the risk of collapse.

[0004] In view of the above problems, it is necessary to provide a centralized supply management shelf for infrastructure engineering material with a protective fence that can slide. UTILITY MODEL CONTENT

[0005] In order to overcome the inconvenience of loading with a protective fence and the poor protection effect without a protective fence, the utility model provides a centralized supply management shelf for infrastructure engineering material.

[0006] The technical implementation scheme of the utility model discloses: a centralized supply management goods shelf for infrastructure engineering materials, including first docking frame, universal wheel, first placing plate, second docking frame, second placing plate and sliding plate, first docking frame inside evenly spacedly connect with a plurality of first placing plate, first docking frame right side is equipped with second docking frame, first docking frame and second docking frame bottom front and back symmetry rotatory connection has universal wheel, second docking frame inside evenly spacedly connect with a plurality of second placing plate, three second placing plate left side surface is connected with sliding plate, sliding plate and first placing plate sliding fit, still including slide rail, telescopic frame, connecting plate, connecting block, connecting frame, fixed pin and spring, two first placing plates of upper side and second placing plate front and back symmetry are connected with slide rail, first docking frame and second docking frame inside are equipped with telescopic frame, and the connecting plate is connected on telescopic frame, and the connecting block is connected on the outer side surface of connecting plate, and the connecting block is slidably connected with slide rail, and the fixed hole is set on connecting plate, and the connecting frame is connected in first docking frame and second docking frame inside, and the connecting frame is wrapped the connecting plate of corresponding position, and the fixed pin is slidably connected on first docking frame and second docking frame, and the fixed pin is connected with fixed hole snap fit, and the spring is connected on the inner side surface of fixed pin, and the spring of left side is connected with first docking frame, and the spring of right side is connected with second docking frame.

[0007] As the improvement of the above scheme, it further includes an electric push rod and a pushing frame, and the bottom of the first placing plate in the middle is provided with the electric push rod, the telescopic end of the electric push rod is connected with the pushing frame, and the right side surface of the pushing frame is connected with the second docking frame.

[0008] As the improvement of the above scheme, it further includes a protective shell, and the bottom of the first placing plate is provided with the protective shell, the protective shell wraps the electric push rod, and the telescopic end of the electric push rod penetrates through the protective shell.

[0009] As the improvement of the above scheme, it further includes a telescopic frame, and the telescopic frame is connected between the first placing plate and the second placing plate.

[0010] As the improvement of the above scheme, it further includes an inclination sensor, and the left side surface of the first placing plate on the upside is provided with the inclination sensor, and the right side surface of the second placing plate on the upside is provided with the inclination sensor.

[0011] As the improvement of the above scheme, X-shaped protective frames are installed on the first docking frame and the second docking frame.

[0012] The utility model discloses an advantageous effect: through telescopic frame installed on the first butt joint and the second butt joint, can pull the fixed pin when needing to load goods, cancel the fixing of telescopic frame, then can pull the connecting plate, slide telescopic frame, realize the opening of telescopic frame, then convenient for staff loading goods, loads after, resets telescopic frame, and then fixes it with the fixed pin, can realize the protection of goods, convenient for loading goods and protection, still can utilize the telescopic function of electric push rod, can dynamically adjust the space size of goods shelf according to actual demand, when needing more placing space, starts electric push rod and makes it stretch, increases the effective length of goods shelf. BRIEF DESCRIPTION OF DRAWINGS

[0013] Figure 1 It is the three-dimensional structure schematic diagram of the utility model.

[0014] Figure 2 It is the sectional view of the protective shell of the utility model.

[0015] Figure 3 It is the three-dimensional structure schematic diagram of sliding plate, electric push rod and protective shell and other parts of the utility model.

[0016] Figure 4 It is the explosion drawing of the first placing plate and sliding plate of the utility model.

[0017] Figure 5 It is the three-dimensional structure schematic diagram of sliding rail, connecting frame and fixed pin and other parts of the utility model.

[0018] Figure 6 It is the three-dimensional structure schematic diagram of connecting plate, connecting block and fixed hole and other parts of the utility model.

[0019] Figure 7 It is the three-dimensional structure schematic diagram of fixed pin and spring of the utility model.

[0020] Label name in drawing: 1, first butt joint, 101, universal wheel, 2, first placing plate, 3, second butt joint, 4, second placing plate, 5, sliding plate, 6, sliding rail, 7, telescopic frame, 8, connecting plate, 9, connecting block, 10, fixed hole, 11, connecting frame, 12, fixed pin, 13, spring, 14, electric push rod, 15, push frame, 16, protective shell, 17, telescopic frame, 18, inclination sensor. DETAILED DESCRIPTION

[0021] The above scheme is further explained in combination with specific embodiments. It should be understood that these embodiments are used to illustrate the present application and do not limit the scope of the present application. The implementation conditions used in the embodiments can be further adjusted according to the conditions of specific manufacturers. The implementation conditions not mentioned are usually the conditions in conventional experiments.

[0022] Example: A centralized supply management rack for infrastructure construction materials, such as... Figures 1-7 As shown, the assembly includes a first docking frame 1, casters 101, a first placement plate 2, a second docking frame 3, a second placement plate 4, a sliding plate 5, a slide rail 6, a telescopic frame 7, a connecting plate 8, a connecting block 9, a connecting frame 11, a fixing pin 12, a spring 13, an electric push rod 14, a push frame 15, a protective shell 16, a telescopic frame 17, and a tilt sensor 18. X-shaped protective frames are installed on the first docking frame 1 and the second docking frame 3. Multiple first placement plates 2 are evenly spaced inside the first docking frame 1. A second docking frame 3 is located on the right side of the first docking frame 1. Casters 101 are symmetrically connected to the bottom of the first docking frame 1 and the second docking frame 3, rotating back and forth. To facilitate the movement of this device, multiple second placement plates 4 are evenly spaced inside the second docking frame 3. A sliding plate 5 is connected to the left side of three of the second placement plates 4, and the sliding plate 5 slides in conjunction with the first placement plate 2. The two upper first placement plates 2 and second placement plates 4 are symmetrically connected to slide rails 6. Telescopic frames 7 are installed inside both the first docking frame 1 and the second docking frame 3. The telescopic frames 7 can protect the goods on the first placement plates 2 and second placement plates 4. A connecting plate 8 is connected to the telescopic frame 7, and a connecting block 9 is connected to the outer side of the connecting plate 8. The connecting block 9 can drive the telescopic frame 7 to slide within the slide rail 6. The connecting block 9 is slidably connected to the slide rail 6. The connecting plate 8 has an opening... A fixing hole 10 is provided. A connecting frame 11 is connected inside both the first docking frame 1 and the second docking frame 3. The connecting frame 11 encloses the corresponding connecting plate 8. A fixing pin 12 is slidably connected to both the first docking frame 1 and the second docking frame 3. The fixing pin 12 engages with the fixing hole 10, limiting the telescopic frame 7. A spring 13 is connected to the inner side of the fixing pin 12. The left spring 13 is connected to the first docking frame 1, and the right spring 13 is connected to the second docking frame 3. An electric push rod 14 is installed at the bottom of the first placement plate 2 in the middle. The electric push rod 14 can drive the push frame 15 to move. The telescopic end of the electric push rod 14 is connected to the push frame 15. The right side of the pusher 15 is connected to the second docking frame 3. The pusher 15 can drive the second docking frame 3 to move. A protective shell 16 is installed at the bottom of the first placement plate 2. The protective shell 16 covers the electric push rod 14. The telescopic end of the electric push rod 14 passes through the protective shell 16. The protective shell 16 can protect the electric push rod 14. A telescopic frame 17 is connected between the first placement plate 2 and the second placement plate 4. The telescopic frame 17 can protect the sliding plate 5. A tilt sensor 18 is installed on the left side of the upper first placement plate 2 and on the right side of the upper second placement plate 4. The tilt sensor 18 can detect whether the first docking frame 1 and the second docking frame 3 are tilted.

[0023] When the device needs to be used, when the length of the shelf needs to be adjusted, the staff can start the electric push rod 14, the telescopic end of the electric push rod 14 pushes the push frame 15 to move, the push frame 15 drives the second docking frame 3 to move to the right, when the second docking frame 3 moves, it will drive the sliding plate 5 to slide along the first placement plate 2, the telescopic frame 17 will be pulled and stretched, and the telescopic frame 7 will be telescopic, when the second docking frame 3 moves to the appropriate position, the staff can turn off the electric push rod 14, and the length adjustment is completed, when the goods need to be placed, the staff can pull out the fixed pin 12 with the right hand, so that the fixed pin 12 cancels the clamping of the fixed hole 10, the spring 13 is compressed, then the staff can move the connecting plate 8 to the left with the left hand, when the connecting plate 8 is pulled, the staff can release the fixed pin 12, the spring 13 is reset, the connecting block 9 slides along the slide rail 6, and the telescopic frame 7 will be telescopic, when the telescopic frame 7 moves to the appropriate position, the staff no longer pulls the connecting plate 8, and then the goods can be placed on the first placement plate 2 and the second placement plate 4, when the goods are placed, the staff can move the connecting plate 8 to the right to reset it, when the connecting plate 8 moves to the inside of the connecting frame 11, the staff pulls the fixed pin 12 outward, the spring 13 is compressed, when the connection is completed into the connecting frame 11, the fixed pin 12 is released, the spring 13 is reset, and the fixed pin 12 is pushed inward to be clamped with the fixed hole 10, the telescopic frame 7 is limited, and the protection of the goods is completed, which is convenient for the staff to use.

[0024] Although the embodiments of the present application have been shown and described, it should be understood by those skilled in the art that changes can be made in these embodiments without departing from the principles and spirit of the present application, and the scope of the present application is defined by the appended claims and their equivalents.

Claims

1. A centralized supply management shelf for infrastructure engineering materials, comprising a first docking frame (1), a universal wheel (101), a first placement plate (2), a second docking frame (3), a second placement plate (4) and a sliding plate (5), a plurality of first placement plates (2) are fixedly connected in the first docking frame (1) at uniform intervals, a second docking frame (3) is arranged on the right side of the first docking frame (1), a universal wheel (101) is rotatably connected to the bottom of the first docking frame (1) and the second docking frame (3) symmetrically, a plurality of second placement plates (4) are fixedly connected in the second docking frame (3) at uniform intervals, and a sliding plate (5) is fixedly connected to the left side surface of three second placement plates (4), wherein the sliding plate (5) is in sliding cooperation with the first placement plate (2). It also includes slide rails (6), telescopic frames (7), connecting plates (8), connecting blocks (9), connecting frames (11), fixing pins (12) and springs (13), the upper two first placement plates (2) and the second placement plate (4) are symmetrically installed with slide rails (6) in front and back, the inner front wall of the first docking frame (1) and the inner rear wall of the second docking frame (3) are both installed with telescopic frames (7), the inner side of the telescopic frame (7) is fixedly connected with the connecting plate (8), the outer side of the connecting plate (8) is fixedly connected with the connecting block (9), the connecting block (9) is slidably connected with the slide rail (6), the middle part of the connecting plate (8) is provided with a fixing hole (10), the inner rear wall of the first docking frame (1) and the inner front wall of the second docking frame (3) are both fixedly connected with the connecting frame (11), the connecting frame (11) wraps the connecting plate (8) at the corresponding position, the rear side of the first docking frame (1) and the front side of the second docking frame (3) are both slidably connected with the fixing pin (12), the fixing pin (12) is clamped and matched with the fixing hole (10), the inner side of the fixing pin (12) is connected with the spring (13), the left spring (13) is connected with the first docking frame (1), and the right spring (13) is connected with the second docking frame (3).

2. The centralized supply management rack for capital project materials of claim 1, wherein, It also includes an electric push rod (14) and a push frame (15), the middle first placement plate (2) is installed with the electric push rod (14) in the middle of the bottom surface, the telescopic end of the electric push rod (14) is fixedly connected with the push frame (15), and the right side of the push frame (15) is fixedly connected with the second docking frame (3).

3. The centralized supply management rack for capital project materials of claim 2, wherein: It also includes a protective shell (16), the first placement plate (2) is installed with the protective shell (16) in the middle of the bottom surface, the protective shell (16) wraps the electric push rod (14), and the telescopic end of the electric push rod (14) penetrates through the protective shell (16).

4. The centralized supply management rack for capital project materials of claim 3, wherein, It also includes a telescopic frame (17), the telescopic frame (17) is fixedly connected between the upper two first placement plates (2) and the second placement plate (4), and the telescopic frame (17) wraps the sliding plate (5).

5. The centralized supply management rack for capital project materials of claim 4, wherein: It also includes an inclination sensor (18), the left side of the upper first placement plate (2) is installed with the inclination sensor (18), and the right side of the upper second placement plate (4) is installed with the inclination sensor (18).

6. The centralized supply management rack for capital project materials of claim 5, wherein, X-shaped protective frames are installed on the first docking frame (1) and the second docking frame (3).