Fabricated building construction platform
The construction platform, with its splicing structure and sunshade design, solves the problem of time-consuming and labor-intensive assembly of existing suspended platforms, enabling rapid assembly and disassembly, improving construction efficiency, and providing sunshade effects.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-25
- Publication Date
- 2026-03-24
AI Technical Summary
Existing methods for assembling suspended platforms for construction are time-consuming, labor-intensive, inefficient, and inconvenient to use.
It adopts a splicing structure design, with the uprights movably connected to the upper and lower sleeves and threadedly connected to the bottom pedal. Combined with the sunshade structure, it can be quickly assembled and disassembled.
It significantly reduces assembly and disassembly time and labor costs, improves construction efficiency, and provides good sunshade protection.
Smart Images

Figure CN224032111U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of equipment for building construction, in particular to an assembly type building construction platform. BACKGROUND
[0002] In high-altitude building construction operation, the building basket is a commonly used building equipment. At present, the existing building basket is usually assembled by a bottom pedal and four side guardrails to form a suspended basket structure. When in use, the building basket needs to be operated in cooperation with the elevator and the suspension structure. The suspension structure is fixed on the building, and the left and right sides of the building basket are respectively provided with elevators, and the steel wire rope end of the elevator is connected with the suspension structure, so that the building basket is connected with the suspension structure through the suspension structure. Through the work of the elevator, the building basket can realize lifting, so as to cooperate with the construction personnel to carry out high-altitude building construction operation.
[0003] However, the connection between the existing building basket and the side guardrails and between the side guardrails and the bottom pedal usually relies on the assembly of a plurality of bolts and nuts. This assembly method is not only time-consuming and laborious, but also low in efficiency and inconvenient to use. SUMMARY
[0004] In view of the deficiencies in the prior art, the purpose of the utility model is to provide an assembly type building construction platform. In use, the utility model can be quickly and conveniently assembled into a basket construction platform, and the disassembly process is also simple and efficient. Compared with the cumbersome bolt and nut assembly method of the traditional building basket, the time and labor cost of assembly and disassembly are significantly reduced, and the construction efficiency is improved.
[0005] The utility model embodiment provides an assembly type building construction platform, which comprises a bottom pedal and a plurality of side guardrails, the plurality of side guardrails are enclosed above the bottom pedal to form side rails of the construction platform, adjacent two side guardrails and the bottom pedal are detachably connected through a splicing structure, the splicing structure comprises a stand column, the two adjacent side guardrails are respectively provided with an upper sleeve and a lower sleeve at the connection, the upper sleeve and the lower sleeve are alternately arranged in the vertical direction, the stand column is movably sleeved in the upper sleeve and the lower sleeve, and the bottom is connected with the bottom pedal.
[0006] In an embodiment, a sunshade structure is included, the sunshade structure comprises a sunshade cloth arranged above the side rail, the sunshade cloth is bound to a support rod through a traction rope, and the other end of the support rod is connected with the splicing structure.
[0007] In an embodiment, a sunshade structure is included, the sunshade structure comprises a sunshade cloth arranged above the side rail, the sunshade cloth is bound to a support rod through a traction rope, and the other end of the support rod is connected with the splicing structure.
[0008] In an embodiment, the bottom of the stand column is integrally formed with a threaded column, and a threaded hole slot is formed in the bottom pedal and matched with the threaded column.
[0009] In an embodiment, a threaded sleeve is arranged on the bottom platform at a position corresponding to the threaded hole slot, and the threaded sleeve is threadedly matched with the threaded column.
[0010] In an embodiment, the top of the column is formed with a limiting baffle.
[0011] In an embodiment, the limiting baffle is in the form of a hand wheel structure.
[0012] In an embodiment, the bottom platform is integrally formed with a mounting plate on each side, and the mounting plate is arranged outside the side fence.
[0013] In an embodiment, the bottom of the bottom platform is provided with a plurality of universal wheels.
[0014] The assembled building construction platform provided by the embodiment of the utility model has the advantages that:
[0015] 1. The utility model discloses a building construction platform which is quickly and conveniently assembled through the optimization of the structure design, and the disassembly process is also simple and efficient.
[0016] 2. Specifically, the adjacent side fences are conveniently assembled together through the splicing structure, and the whole after assembly can be conveniently assembled to the bottom platform through the splicing structure, so that the building construction platform (building hanging basket) is assembled more time-savingly and labor-savingly and efficiently.
[0017] 3. After the utility model is assembled, the splicing structure is designed, so that the assembled building construction platform has a certain sun-shading effect, and good sun-shading protection effect is provided for the construction personnel in the platform. BRIEF DESCRIPTION OF DRAWINGS
[0018] In order to more clearly illustrate the technical scheme in the embodiment of the utility model, the drawings needed in the embodiment or the prior art description will be briefly introduced below, and obviously, the drawings in the following description are only some embodiments of the utility model, and those skilled in the art can obtain other drawings according to the drawings without creative labor.
[0019] Figure 1 The utility model discloses an assembled building construction platform three-dimensional structure schematic diagram is provided to the embodiment of the utility model;
[0020] Figure 2 The utility model discloses two adjacent side fences and the schematic diagram after splicing structure assembly are provided to the embodiment of the utility model.
[0021] Figure 3 A three-dimensional structure schematic view of the splicing structure provided by the embodiment of the utility model;
[0022] Figure 4 A three-dimensional structure schematic view of the bottom pedal provided by the embodiment of the utility model;
[0023] Figure 5 A three-dimensional structure schematic view of the sunshade structure provided by the embodiment of the utility model.
[0024] The drawing mark: 1 - bottom pedal;2 - side guardrail;3 - side fence;4 - stand;5 - limit baffle;6 - threaded column;7 - upper sleeve;8 - lower sleeve;9 - threaded hole groove;10 - threaded sleeve;11 - universal wheel;12 - sunshade cloth;13 - tow rope;14 - support rod;15 - insert slot hole;16 - mounting plate. DETAILED DESCRIPTION
[0025] In order to make the technical personnel in the art better understand the technical scheme of the utility model, the preferred implementation scheme of the utility model is described below in combination with specific embodiments, but it should be understood that the drawings are only for illustrative description, and cannot be understood as the limitation of the utility model;In order to better illustrate the embodiment, some components in the drawings will be omitted, enlarged or reduced, and the size of the actual product is not represented;For those skilled in the art, it is understandable that some well-known structures in the drawings and their description can be omitted. The positional relationship described in the drawings is only for illustrative description, and cannot be understood as the limitation of the utility model.
[0026] The utility model is further described below in combination with the drawings and examples, but not as the basis for limiting the utility model.
[0027] As Figure 1 and Figure 2 As shown in a kind of fabricated building construction platform, including bottom pedal 1 and multiple side guardrails 2, multiple side guardrails 2 are enclosed to form the side fence 3 of construction platform above bottom pedal 1, and side fence 3 and bottom pedal 1 constitute a hanging basket structure, and side guardrail 2 can be designed into the guardrail plate frame structure known to those skilled in the art, and adjacent two side guardrails 2 and bottom pedal 1 are detachably connected by splicing structure, and the splicing structure includes stand 4, and two adjacent side guardrails 2 are respectively provided with upper sleeve 7 and lower sleeve 8 at connecting place, and upper sleeve 7 and lower sleeve 8 are alternately arranged in vertical direction, and stand 4 is movably sleeved in upper sleeve 7 and lower sleeve 8, and is connected with bottom pedal 1 at bottom.
[0028] In the embodiment, as Figure 1 and Figure 2As shown, the upper sleeve 7 and the lower sleeve 8 are both provided with two, and the two upper sleeves 7 and the two lower sleeves 8 are arranged on the corresponding side guardrails 2.
[0029] As shown, Figure 5 The assembled building construction platform further comprises a sunshade structure, the sunshade structure comprises a sunshade cloth 12 arranged above the side fence 3, the sunshade cloth 12 is connected to a support rod 14 through a traction rope 13, and the other end of the support rod 14 is connected to the splicing structure. The sunshade cloth 12 is a square cloth, which is a prior art in the public knowledge, and in this embodiment, the traction rope 13 is connected to the four corners of the sunshade cloth 12, and the other end of the traction rope 13 is connected to the top of the support rod 14.
[0030] The top of the stand column 4 is provided with a plug-in slot hole 15, and the bottom of the support rod 14 is inserted into the plug-in slot hole 15.
[0031] The bottom of the stand column 4 is integrally formed with a threaded column 6, and the bottom tread plate 1 is provided with a threaded hole slot 9 matched with the threaded column 6. Specifically, the bottom tread plate 1 is provided with a threaded hole slot 9 matched with the threaded column 6 at the four corners.
[0032] The bottom tread plate 1 is provided with a threaded cylinder sleeve 10 corresponding to the position of the threaded hole slot 9, and the threaded cylinder sleeve 10 is screwed with the threaded column 6, so that the assembly between the stand column 4 and the bottom tread plate 1 is more firm.
[0033] As shown, Figure 3 The top of the stand column 4 is formed with a limiting baffle 5, and the limiting baffle 5 is in the form of a hand wheel structure, which can facilitate the rotation of the stand column and the threaded connection between the threaded column 6 at the bottom of the stand column and the threaded hole slot 9.
[0034] The bottom tread plate 1 is integrally provided with a mounting plate 16 on both sides, and the mounting plate 16 is arranged outside the side fence 3. In this embodiment, the elevator can be installed and fixed on the side of the mounting plate 16 away from the bottom tread plate 1 by means of bolts, nuts or welding.
[0035] As shown, Figure 4 The bottom of the bottom tread plate 1 is provided with a plurality of universal wheels 11, and specifically, the universal wheels 11 are arranged at the four corners of the bottom of the bottom tread plate 1.
[0036] In the specific implementation of this embodiment, as shown, Figure 1As shown, when assembling the prefabricated building construction platform, the column 4 is movably sleeved in the upper sleeve 7 and the lower sleeve 8, and the bottom of the column 4 is threadedly connected with the threaded hole slot 9 and the threaded sleeve 10, and the bottom of the supporting rod 14 is inserted into the insertion slot hole 15. After the assembly is completed, the prefabricated building construction platform is used in cooperation with the existing lifting machine and the suspension structure fixed to the building. The construction personnel can enter the platform to perform high-altitude construction. When the sunlight is relatively strong, the sunshade cloth 12 can provide good sunshade effect for the construction personnel, and improve the construction environment.
[0037] According to the description and drawings of the present application, those skilled in the art can easily manufacture or use the prefabricated building construction platform of the present application, and can produce the positive effects described in the present application.
[0038] Unless otherwise specified and limited, in the present application, if there are terms such as "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. Indicating the orientation or positional relationship is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation. Therefore, the terms describing the orientation or positional relationship in the present application are only used for exemplary description, and cannot be understood as a limitation on the present application. For those skilled in the art, the specific meaning of the above terms can be understood in conjunction with the drawings and according to the specific circumstances.
[0039] Unless otherwise specified and limited, in the present application, if there are terms such as "setting", "connection" and "connection", they should be understood broadly, for example, they can be fixedly connected, or they can be detachably connected, or integrally connected; It can be directly connected, or indirectly connected through an intermediate medium, or the communication between two elements inside. For those skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances.
[0040] The above is only a preferred embodiment of the present application, and does not limit the present application in any form. Any simple modification or equivalent change made according to the technical essence of the present application to the above embodiment falls within the protection scope of the present application.
Claims
1. A prefabricated building construction platform, characterized in that: It includes a bottom tread and multiple side railings. The multiple side railings enclose the construction platform above the bottom tread to form a side fence. Adjacent side railings and the bottom tread are detachably connected by a splicing structure. The splicing structure includes a column. Two adjacent side railings are respectively provided with an upper sleeve and a lower sleeve at the connection point. The upper sleeve and the lower sleeve are arranged alternately in the vertical direction. The column is movably fitted into the upper sleeve and the lower sleeve and is connected to the bottom tread at the bottom.
2. The prefabricated building construction platform according to claim 1, characterized in that: It includes a sunshade structure, which consists of a sunshade cloth installed above the side fence. The sunshade cloth is tied to a support pole by a traction rope, and the other end of the support pole is connected to the splicing structure.
3. The prefabricated building construction platform according to claim 2, characterized in that: The top of the column is provided with an insertion slot, and the bottom of the support rod is inserted into the insertion slot.
4. The prefabricated building construction platform according to claim 1, characterized in that: The bottom of the column is integrally formed with a threaded column, and the bottom plate is provided with a threaded hole groove that matches the threaded column.
5. The prefabricated building construction platform according to claim 4, characterized in that: A threaded sleeve is provided on the bottom pedal at the location where the threaded hole is opened, and the threaded sleeve is threadedly engaged with the threaded column.
6. The prefabricated building construction platform according to claim 1, characterized in that: A limiting baffle is formed at the top of the column.
7. The prefabricated building construction platform according to claim 6, characterized in that: The limiting baffle has a handwheel structure.
8. The prefabricated building construction platform according to claim 1, characterized in that: The bottom step has an integrally formed mounting plate on each of its two sides, and the mounting plate is placed on the outside of the side railing.
9. The prefabricated building construction platform according to claim 1, characterized in that: The bottom of the foot pedal is equipped with multiple casters.