Construction operation platform integrated with curtain wall installation function
By designing a construction platform that integrates curtain wall installation functions, and utilizing a flip-up walkway panel and hanging frame structure, the problems of inconvenience and safety risks in curtain wall installation have been solved, achieving an efficient and safe curtain wall installation process.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- THE THIRD CONSTR CO LTD OF CHINA CONSTR THIRD ENG BUREAU
- Filing Date
- 2025-05-21
- Publication Date
- 2026-04-28
AI Technical Summary
The current method of installing building curtain walls relies on suspended scaffolding, which is inconvenient, inefficient, and poses risks at height. Furthermore, it can only be carried out after the main structure is completed, which prolongs the construction period and increases costs.
Design a construction platform that integrates curtain wall installation functions, including connecting rods, hanger joints, inner hangers of the bracket, outer hangers of the bracket, and a flip-up walkway panel. The flip-up walkway panel provides construction space and safety protection, enabling the simultaneous installation of the curtain wall and the building construction machine.
It improves the convenience and efficiency of curtain wall installation, shortens the construction period, reduces costs, and provides a safe construction environment.
Smart Images

Figure CN224173689U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of building construction, and more specifically, to a construction operation platform with integrated curtain wall installation function. Background Technology
[0002] With rapid urbanization, a large number of commercial buildings, office buildings, hotels, cultural and sports venues, and other large public buildings, as well as high-rise buildings, are constantly emerging. Building curtain walls can give buildings a unique appearance and a modern feel. They not only play an important role in beautifying building appearances and improving environmental effects, but also have gained market favor and are widely used in urban construction due to their multifunctionality, energy efficiency, environmental friendliness, and stylishness. Currently, building curtain wall installation is mainly carried out using suspended scaffolds, which leads to inconvenience, low construction efficiency, and risks associated with working at heights. In terms of construction period, curtain wall installation can generally only be carried out after the main structure is completed, extending the overall construction period and increasing labor and machinery costs. Summary of the Invention
[0003] The technical problem to be solved by this utility model is to provide a construction operation platform with integrated curtain wall installation function, which can reduce the construction safety risks and increase the convenience of construction during curtain wall installation.
[0004] The technical solution adopted by this utility model to solve its technical problem is as follows: a construction operation platform integrating curtain wall installation function is constructed, including connecting rods, hanger joints, inner hangers of the bracket, outer hangers of the bracket, and a flip-up walkway panel. The hanger joints are detachably fixed to the horizontally arranged connecting rods. The upper end of the inner hanger of the bracket is fixed to the hanger joint. The outer hanger of the bracket is fixed to the outer end of the connecting rod. The inner hanger of the bracket and the outer hanger of the bracket are connected to form a bracket. The middle part of the inner hanger of the bracket is provided with a rotatable and retractable triangular support. A walkway panel is provided between the inner hanger of the bracket and the outer hanger of the bracket. One end of the flip-up walkway panel is hinged to the walkway panel of the bracket. The other end of the flip-up walkway panel is hooked to the inner hanger of the bracket through a diagonal chain. When the flip-up walkway panel is opened horizontally, it rests flat on the triangular support.
[0005] According to the above scheme, the bracket joint is installed on the connecting rod by means of clamps and bolts.
[0006] According to the above scheme, a fixing plate is installed on the inner rod of the bracket by bolts, and the triangular support is hinged to the fixing plate.
[0007] According to the above scheme, the round steel on the triangular support is inserted into the round tube on the fixed clamp to achieve a hinge connection.
[0008] According to the above scheme, the triangular support is rotated and retracted to the inside of the inner rod of the hanging frame, and then fixed to the outer rod with wire.
[0009] The construction platform implementing the integrated curtain wall installation function of this utility model has the following beneficial effects:
[0010] 1. This utility model provides construction space for curtain wall installation by moving the inner suspension rods of the bracket outward and adding a reversible walkway panel. It also provides a curtain wall installation platform, ensuring a robust safety protection system. The bracket can also serve as a temporary platform for storing materials during curtain wall construction. Furthermore, an openable triangular support is installed below the reversible walkway panel to ensure that the integrated construction platform can smoothly pass through the curtain wall installation layer when being raised.
[0011] 2. This utility model increases the convenience of curtain wall installation and improves construction efficiency, enabling the simultaneous installation of building curtain walls and building construction machines, which can shorten the overall construction period, save costs, and has good innovation, applicability and economy. Attached Figure Description
[0012] The present invention will be further described below with reference to the accompanying drawings and embodiments. In the accompanying drawings:
[0013] Figure 1 A schematic diagram of the elevation of the integrated platform bracket for curtain wall installation.
[0014] Figure 2 This is a schematic diagram of the elevation view showing the outward movement of the internal suspension rod of the hanging bracket;
[0015] Figure 3 This is a schematic diagram of the elevation of the reversible walkway panel during the curtain wall construction phase.
[0016] Figure 4 A schematic diagram of the elevation of the flip-up walkway slab for the lifting phase of the construction operation integrated platform;
[0017] Figure 5 A schematic diagram of the elevation view showing the connection between the triangular support and the fixed clamping plate;
[0018] Figure 6 This is a schematic diagram of the flip-up walkway slab. Detailed Implementation
[0019] To provide a clearer understanding of the technical features, objectives, and effects of this utility model, the specific embodiments of this utility model will now be described in detail with reference to the accompanying drawings.
[0020] like Figure 1-6 As shown, the construction operation platform integrating curtain wall installation function is characterized by including a connecting rod 1, a hanger joint 2, an inner hanger 3 of the bracket, an outer hanger 6 of the bracket, and a flip-up walkway panel device 5.
[0021] When installing the hangers within the height range of the curtain wall installation layer, the integrated construction platform moves the hanger joint 2 of the curtain wall construction area outward and installs it on the connecting rod 1 using clamps and bolts. The lower part of the hanger joint 2 connects to the inner hanger 3 of the hanger. The inner hanger 3 and the outer hanger 6 of the hanger are normally connected to form the hanger. This section of the hanger is narrower than the upper conventional hanger to avoid the curtain wall installation construction area and reserve space for curtain wall construction. A flip-up walkway device 5 is added at the lower walkway of the curtain wall installation section. It is mainly used to provide an extended operating platform and safety protection after the distance between the frame and the structure increases due to the outward movement of the inner hanger of the curtain wall installation section hanger. The flip-up walkway device 5 includes a diagonal chain 5-1, a flip-up walkway 5-2, a hinge 5-3, a triangular support 5-4, and a fixed clamp 5-5.
[0022] A fixing plate 5-5 is bolted to the inner hanger rod 3 of the bracket. A triangular support 5-4 is installed on the fixing plate 5-5 by hinge. The round steel on the triangular support 5-4 is inserted into the round tube on the fixing plate to achieve a movable connection, which can be flipped.
[0023] The reversible walkway panel 5-2 is fixed in three ways: first, it is hinged to the hanger walkway panel via hinge 5-3; second, it is pulled to the inner hanger rod 3 of the hanger via diagonal chain 5-1; and third, it is placed flat on the triangular support 5-4 for support. At this point, the hanger installation work within the height range of the curtain wall installation layer is completed, and the specific implementation stage begins. During curtain wall installation, personnel stand on the reversible walkway panel to operate, and materials can be stacked on the hanger platform. After the curtain wall installation is completed, the lifting stage of the construction operation integration platform begins. The reversible walkway panel 5-2 is flipped upwards, and the diagonal chain 5-1 is pulled upwards and adjusted for fixation, so that the reversible walkway panel 5-2 is leaned against and fixed to the inner hanger rod 3 of the hanger. The triangular support 5-4 is rotated and retracted into the hanger and secured to the outer hanger rod 6 with wire, thus reserving a lifting channel and preventing the hanger from rubbing against the installed curtain wall, ensuring safe and smooth lifting. After the construction operation integration platform is lifted, it enters the usage stage again. The triangular support 5-4 is extended to provide support, and the flip-up walkway panel 5-2 is lowered and placed flat on the triangular support 5-4. It is then adjusted and fixed with the inclined chain 5-1, which holds the flip-up walkway panel 5-2 in place, continuing to provide an operating platform and safety protection for the curtain wall construction personnel. This cycle is repeated, and all curtain wall installation work on the exterior facade is carried out inside the construction operation integration platform.
[0024] like Figure 2As shown, connecting rod 1 provides an installation position for the outward movement of hanger joint 2 and inner hanger 3 of the bracket, thereby narrowing the bracket and increasing the distance between the frame and the wall, reserving construction space for curtain wall installation. Hanger joint 2 is fixed to the lower part of connecting rod 1 using a clamp and bolts. The lower part of hanger joint 2 is then connected to the inner hanger 3 of the bracket. The inner hanger 3 connects to the outer hanger 6 of the bracket, extending downwards into the frame. Therefore, the position of hanger joint 2 can be flexibly adjusted, and the outward movement distance can be specifically designed according to the outer contour of the curtain wall.
[0025] It can accommodate curtain wall outlines of different shapes, reserve accurate and suitable construction space, and has high adaptability.
[0026] like Figures 3-6 As shown, the flip-up walkway panel 5 provides a stable and reliable operating platform and safety protection for construction personnel during the curtain wall installation phase. After the curtain wall is installed, it can be flipped and opened to avoid the curtain wall, leaving a lifting channel for the construction operation integration platform. The length and width of the flip-up walkway panel 5 can be designed according to different curtain wall outlines to ensure that an operating platform and safety protection are provided during the curtain wall installation. After the curtain wall is installed, it does not conflict with the lifting of the building construction machine, increasing flexibility and applicability.
[0027] The embodiments of the present invention have been described above with reference to the accompanying drawings. However, the present invention is not limited to the specific embodiments described above. The specific embodiments described above are merely illustrative and not restrictive. Those skilled in the art can make many other forms under the guidance of the present invention without departing from the spirit and scope of the claims. All of these forms are within the protection scope of the present invention.
Claims
1. A construction operation platform integrating curtain wall installation function, characterized in that, The device includes a connecting rod, a hanger joint, an inner hanger of the bracket, an outer hanger of the bracket, and a rotatable walkway panel. The hanger joint is detachably fixed to the horizontally arranged connecting rod. The upper end of the inner hanger of the bracket is fixed to the hanger joint. The outer hanger of the bracket is fixed to the outer end of the connecting rod. The inner hanger of the bracket and the outer hanger of the bracket are connected to form a bracket. The middle part of the inner hanger of the bracket is provided with a rotatable and retractable triangular support. A bracket walkway panel is provided between the inner hanger of the bracket and the outer hanger of the bracket. One end of the rotatable walkway panel is hinged to the bracket walkway panel, and the other end of the rotatable walkway panel is hooked to the inner hanger of the bracket via a diagonal chain. When the rotatable walkway panel is opened horizontally, it rests flat on the triangular support.
2. The construction operation platform with integrated curtain wall installation function according to claim 1, characterized in that, The boom joint is installed on the connecting rod via clamps and bolts.
3. The construction operation platform with integrated curtain wall installation function according to claim 1, characterized in that, A fixing plate is bolted to the inner rod of the bracket, and the triangular support is hinged to the fixing plate.
4. The construction operation platform with integrated curtain wall installation function according to claim 3, characterized in that, The round steel on the triangular support is inserted into the round tube on the fixed clamp to achieve a hinge connection.
5. The construction operation platform with integrated curtain wall installation function according to claim 1, characterized in that, The triangular support rotates back to the inside of the inner rod of the hanger and is fixed to the outer rod with wire.