Prefabricated flume assembly

By setting baffles inside the water channel to form a casting trough, and then pouring concrete to form a drop sill after solidification, the problem of complex construction of traditional rapid water channels is solved, and efficient and stable installation and use of rapid water channel components are achieved.

CN224299903UActive Publication Date: 2026-05-29CHINA RAILWAY ENG CONSULTING GRP CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
CHINA RAILWAY ENG CONSULTING GRP CO LTD
Filing Date
2025-07-16
Publication Date
2026-05-29

AI Technical Summary

Technical Problem

Traditional rapid water channel construction is complex, has a long construction period, and requires on-site formwork erection and gradual pouring of concrete to form a waterfall.

Method used

The prefabricated rapid flow channel assembly includes baffles that are spaced out and connected to the bottom and side walls within the channel to form a casting trough. Concrete is poured and solidified between the baffles to form a drop, thus avoiding the need for on-site formwork erection and gradual on-site concrete pouring.

Benefits of technology

It improved construction efficiency, enhanced structural stability, extended service life, and reduced construction complexity and cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224299903U_ABST
    Figure CN224299903U_ABST
Patent Text Reader

Abstract

The utility model provides a kind of assembly type torrent chute assembly, it is related to torrent chute technical field, including torrent chute body, torrent chute body is set to slope, and water channel is provided in torrent chute body;Baffle is configured as multiple interval settings in water channel, multiple baffles are respectively connected with the bottom wall and side wall of water channel, and pouring groove for pouring concrete is formed between baffle and the bottom wall and side wall of water channel.The utility model sets up interval multiple baffles in water channel, and each baffle is respectively limited with the bottom wall and side wall between water channel to form pouring groove, and the concrete in multiple pouring grooves can form water fall in water channel after solidification, avoid to support formwork in water channel alone and gradually cast-in-place concrete, improve construction efficiency, the connection stability of baffle and torrent chute body is good, improve the structural stability of torrent chute assembly, to prolong the service life of torrent chute assembly.