A monorail trolley basket cable pipe hanging device
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- SHAANXI SHANMEI HUANGLING MINING IND CO LTD
- Filing Date
- 2025-05-15
- Publication Date
- 2026-05-29
Smart Images

Figure CN224300944U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of cable duct suspension technology, specifically a cable duct suspension device for a monorail suspended basket. Background Technology
[0002] In coal mine roadway or tunnel engineering, advance supports pre-support the roadway roof to prevent roof deformation and collapse caused by mining or geological stress. They not only provide a stable working environment but also protect personnel and equipment. Advance supports are usually used in groups to form a stable support system. The support range can be adjusted according to actual needs, and advance supports can suspend cables and pipelines on the working face. However, according to the technological requirements of fully mechanized longwall mining faces with goaf retention, advance supports are not used in the advance area of the working face in the retained roadway. This makes the suspension of cables and pipelines on the working face a challenge. Therefore, this application proposes a monorail suspended basket cable and pipeline suspension device to solve the above problems. Utility Model Content
[0003] (a) Technical problems to be solved
[0004] To address the shortcomings of existing technologies, this utility model provides a cable conduit suspension device for a monorail suspended basket, which solves the technical problems mentioned in the background.
[0005] (II) Technical Solution
[0006] To achieve the above objectives, the technical solution adopted by this utility model is as follows: a cable conduit suspension device for a monorail suspended basket, including a monorail slide, a suspension plate provided on the bottom side of the monorail slide, and two pulleys installed on both sides of the top of the suspension plate, with the pulleys sliding in the grooves on both sides of the monorail slide. A hanging plate is installed at the bottom of the suspension plate, and multiple hanging plates are installed on the hanging plate from top to bottom, with the hanging plate located in the middle of the hanging plate.
[0007] Preferably, a sliding sleeve is provided in the middle of the hanging plate, and the sliding sleeve slides on the hanging plate, and bolts are installed on the sliding sleeve.
[0008] Preferably, the hanging plate is provided with limit plates on both the front and rear sides, and the hanging plate is provided with downward bending angles on both the left and right sides.
[0009] Preferably, hanging rings are installed on both sides of the lower end of the suspended slide and on the front side wall, and the hanging rings at the lower end of adjacent suspended slides are connected by wire.
[0010] Preferably, the hanging ring on the front side wall of the suspended slide is connected to the connecting rod on the transport machine.
[0011] (III) Beneficial Effects
[0012] The beneficial effects of this utility model are as follows:
[0013] This type of monorail suspended basket cable and pipe hanging device, through the cooperation of a monorail slide, a hanging slide plate, pulleys, a hanging plate, and a hanging plate, can achieve separate hanging of cables and pipes on both sides of the hanging plate, solving the problem of cable and pipe hanging in the advanced area of the working face of the roadway where no advanced support is used; by the hanging ring set on the hanging slide plate, it can be connected to the connecting rod at the tail of the conveyor, so that the hanging slide plate and the hanging plate can be moved with the conveyor; by the connection between the sliding sleeve and the hanging plate, the number of hanging plates and the spacing between multiple hanging plates can be adjusted, which is suitable for use with cables and pipes of different diameters. Attached Figure Description
[0014] Figure 1 This is a three-dimensional structural diagram of the present invention;
[0015] Figure 2 This is a three-dimensional structural diagram of the hanging slide and multiple hanging plates of this utility model;
[0016] Figure 3 This is a three-dimensional structural diagram of the cable and pipe after they are suspended.
[0017] In the diagram: 1. Single track, 2. Suspended slide, 3. Pulley, 4. Hanging plate, 5. Hanging plate, 6. Limiting plate, 7. Bend, 8. Sliding sleeve, 9. Bolt, 10. Hanging ring. Detailed Implementation
[0018] The technical solutions in the embodiments of this utility model will be clearly and completely described below. Obviously, the described embodiments are only some embodiments of this utility model, and not all embodiments. Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of this utility model.
[0019] like Figure 1-3 As shown, this utility model provides a technical solution: a cable pipeline suspension device for a single-rail suspended basket, including a single-rail slide 1, a suspension plate 2 is provided on the bottom side of the single-rail slide 1, and two pulleys 3 are installed on both sides of the top of the suspension plate 2. The pulleys 3 on both sides slide in the grooves on both sides of the single-rail slide 1. The single-rail slide 1 is installed in the advanced area of the working face of the roadway. The pulleys 3 are connected to the grooves on both sides of the single-rail slide 1 to realize that the suspension plate 2 is installed on the single-rail slide 1 and can slide. A hanging plate 4 is installed at the lower end of the suspension plate 2, and multiple hanging plates 5 are installed on the hanging plate 4 from top to bottom. The hanging plate 4 is located in the middle of the hanging plate 5. Limit plates 6 are provided on the front and rear sides of the hanging plate 5, and downward bending angles 7 are provided on the left and right sides of the hanging plate 5.
[0020] A sliding sleeve 8 is provided in the middle of the hanging plate 5, and the sliding sleeve 8 slides on the hanging plate 4. A bolt 9 is installed on the sliding sleeve 8 to connect the sliding sleeve 8 to the hanging plate 4, so that the hanging plate 5 can be installed on the hanging plate 4. The connection between the sliding sleeve 8 and the hanging plate 4 can adjust the number of hanging plates 5 and the spacing between multiple hanging plates 5. It is suitable for cables and pipes of different diameters. The bolt 9 can be connected to the fixing holes on the hanging plate 4 for fixing.
[0021] Hanging rings 10 are installed on both sides of the lower end and the front side wall of the suspended slide plate 2. The hanging rings 10 at the lower end of adjacent suspended slide plates 2 are connected by iron wire to connect adjacent suspended slide plates 2 together. The hanging rings 10 on the front side wall of the suspended slide plate 2 are connected to the connecting rod on the conveyor. By connecting the hanging rings 10 on the suspended slide plate 2 to the connecting rod at the tail of the conveyor, the suspended slide plate 2 and the suspended plate 5 can be driven to move with the conveyor.
[0022] The operational steps for this application are as follows:
[0023] The monorail slide 1 is installed in the advanced area of the working face of the roadway. The pulley 3 is connected to the sliding grooves on both sides of the monorail slide 1, allowing the suspended slide plate 2 to be installed on the monorail slide 1 and slidable. The sliding sleeve 8 is connected to the hanging plate 4, allowing the hanging plate 5 to be installed on the hanging plate 4. Cables and pipes are placed on both sides of the hanging plate 5, such as... Figure 3 As shown, cables and pipes can be managed and suspended separately. Adjacent monorail slides 1 can be connected together by connecting the hanging rings 10 on the bottom side with iron wire. The hanging rings 10 on the front side wall of the suspended slide plate 2 can be connected to the connecting rod on the conveyor, so that the suspended slide plate 2 and the suspended plate 5 can be moved with the conveyor.
[0024] In the description of this utility model, it should be understood that the indicated orientation or positional relationship is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing this utility model and simplifying the description, and is not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model.
[0025] In this utility model, unless otherwise explicitly specified and limited, for example, it can be a fixed connection, a detachable connection, or an integral part; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be a connection within two components or an interaction between two components. Unless otherwise explicitly limited, those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.
[0026] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A cable conduit suspension device for a monorail suspended basket, characterized in that: The system includes a single-track slide (1), on the bottom side of which a hanging slide plate (2) is provided, and two pulleys (3) are installed on both sides of the top of the hanging slide plate (2), and the pulleys (3) on both sides slide in the grooves on both sides of the single-track slide (1). A hanging plate (4) is installed at the bottom of the hanging slide plate (2), and multiple hanging plates (5) are installed on the hanging plate (4) from top to bottom, and the hanging plate (4) is located in the middle of the hanging plate (5). A sliding sleeve (8) is provided in the middle of the hanging plate (5), and the sliding sleeve (8) slides on the hanging plate (4), and a bolt (9) is installed on the sliding sleeve (8).
2. The cable conduit suspension device for a monorail suspended basket according to claim 1, characterized in that: Limiting plates (6) are provided on both the front and rear sides of the hanging plate (5), and downward bending angles (7) are provided on both the left and right sides of the hanging plate (5).
3. The cable conduit suspension device for a monorail suspended basket according to claim 1, characterized in that: Hanging rings (10) are installed on both sides of the lower end and the front side wall of the hanging slide (2), and the hanging rings (10) at the lower end of adjacent hanging slides (2) are connected by iron wire.
4. The cable conduit suspension device for a monorail suspended basket according to claim 3, characterized in that: The hanging ring (10) on the front side wall of the suspended sliding plate (2) is connected to the connecting rod on the transport machine.