A tower crane rectangular plate pile foundation using precast piles of a garage ramp project

CN224314234UActive Publication Date: 2026-06-02THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
Filing Date
2025-04-10
Publication Date
2026-06-02

AI Technical Summary

Technical Problem

Traditional basement raft foundations with tower crane rectangular foundations present challenges in high-rise building construction, including difficulties in site layout, construction difficulties, long construction periods, and high costs, especially in limited construction sites.

Method used

The tower crane adopts a rectangular slab pile foundation that utilizes precast piles from the underground parking garage ramp. The ramp piles serve as the foundation platform for the tower crane, and are combined with precast square piles, brick formwork, and concrete pads to form a stable tower crane foundation structure, simplifying the construction process and reducing costs.

Benefits of technology

It simplifies the layout of tower cranes in limited spaces, improves construction efficiency, reduces costs, reduces environmental pollution, and supports subsequent tower crane relocation, avoiding subsequent pile driver construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224314234U_ABST
    Figure CN224314234U_ABST
Patent Text Reader

Abstract

The utility model provides a borrow the tower crane rectangular board formula pile foundation of garage ramp engineering prefabricated pile, relates to high -rise building construction technical field, including ramp engineering pile, the top of ramp engineering pile is provided with tower crane foundation pile cap, the pile head of ramp engineering pile is anchored into tower crane foundation pile cap, height is not less than 100mm, the top surface of ramp engineering pile is provided with reserved pile head reinforcement, reserved pile head reinforcement extends to the outside of tower crane foundation pile cap along the height direction of tower crane foundation pile cap, and the height of reserved pile head reinforcement is not less than garage ramp surface layer, the utility model can carry out tower crane plane arrangement in limited field and make full use of ramp engineering pile, guarantee high -rise building main body structure safe construction.